Council Planning Negotiated Report 132005 638 03
ATTACHMENT 1 – (132005.638.03) – PROPOSED AMENDED CONDITIONS
ECOLOGY AND ENVIRONMENT
Environmental covenant
40. The vegetation protection covenant document must be registered with the titles office before
the commencement of the use of the expanded Resource Recovery Area.
STORMWATER
43. Prior to the construction of the pad area for the expansion of the Resource Recovery Area
(RRA) and the relocation of the HES basin, provide an updated SWMP, which is based on
the Noosa Landfill – Stormwater Management Plan (Topo, 7/2/2022) and which addresses
the following:
a. Update the report to reflect the approved masterplan for the site and the specific
changes for the site encompassed by the application;
b. Specify the final HES basin detail from the range of options presented in the report,
including consideration of whether a Type-B HES basin may present a lower-risk option
compared to the flap-gated arrangement proposed to prevent back-flows into the Type-
A arrangement as currently proposed;
c. Include all details for the sizing and proposed levels of the HES basin within the body
of the report, based on recent detailed survey at the point of discharge and
downstream; and
d. Include construction-phase erosion and sediment control plans which document how
the transition from the current HES basin location to the ultimate location (including
filling for the RRA pad) will be achieved.