Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

MCU14/0056 Information Response Cover Letter

of 23

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

site or may utilise the site temporarily throughout the year. Survey methods undertaken during the ecological
assessment are detailed in Section 4.4 of the EAR. These methods are consistent with EAR requirements of other
Councils such as Brisbane City Council and Fraser Coast Regional Council which advocate the use of survey methods
appropriate to the site, potential impact and proposed use.

In addition, no fauna listed in Ecotone Environmental Services “Fauna and its Associated Biodiversity Values in
Noose Shire” study were identified within the application site or area considered likely to utilise the site. Further the
site is not identified as a ‘Significant Track” for fauna movement by overlay mapping in the report.


Item 32 –

Provide an assessment of the proposal with relation to each of the Riparian Buffer Area Outcome 5 specific outcomes, in
particular
(a) How the proposal protects riparian zones by avoiding any new development in the riparian buffer area
(b) How the proposal protects riparian zones by retaining aquatic and terrestrial habitats in riparian zones
(c) How the proposal protects riparian zones by maintaining wildlife corridors along watercourses and drainage lines for
native fauna movement
(d) How the proposal protects riparian zones by avoiding edge effects and incompatible uses in riparian zones
(e) How the proposal protects riparian zones by maintaining bank stability by minimizing bank erosion and slumping
(f) How the proposal protects riparian zones by maintaining water quality by filtering sediments, nutrients and other
pollutants
(g) How the proposal protects riparian zones by removing undesirable plant species and replacing them with vegetation
of local origin;
Response:

The following responses have been provided to each of the Riparian Buffer Area Outcome 5 specific outcomes.

    a)   How the proposal protect[s] riparian zones by avoiding new development in the riparian buffer area.

As discussed in Appendix D of the EAR, the proposed development will occur on premises containing a mapped
Riparian Buffer Area. This buffer extends over approximately half of the site and protects the waterway that traverses
the south-eastern corner. Much of this riparian buffer area to the west of the watercourse has been highly disturbed
and cleared of vegetation. Approximately 0.005ha of the 1.1ha mapped riparian buffer contains riparian vegetation,
while the remainder of the mapped buffer area (approximately 1.095ha) contains mowed grass with some native
trees along the northern and southern property boundaries which act as a landscape buffer to adjacent arterial roads
(refer to Plan 1 below). The proposed development intends to retain all riparian vegetation as well an additional 10m
buffer along the existing vegetation boundary to minimise edge effects from the development.

The mapped riparian buffer protects a Stream Order 1 (lowest value) watercourse which under the Regional
Vegetation Management Code for Southeast Queensland Bioregion 2006 and the SEQ Healthy Waterways
Partnership is recommended to be protected by a minimum 10m riparian buffer. The existing vegetated riparian
corridor is on average 20m in width from the high bank with an addition 10m buffer from the existing vegetation
boundary proposed by the development (a total minimum average 30 buffer to the stream order
watercourse).Therefore, the proposed riparian buffer exceeds the recommended waterway setback for a stream order
1 watercourse.

It was noted in the EAR that this watercourse is highly disturbed and modified, fragmented by major arterial
development to the north and south and passes through a number of stormwater pipes. Site survey identified this
area to be heavily infested with weeds and considered to have poor water quality and limited ecological value. It is
considered that the proposed average 30m buffer from the high bank is suitable to protect the values associated with


                                                           11
Log in to download the original file

MCU14_0056 Information Response Cover Letter.pdf · 736 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.