Item 34 –

Demonstrate that the MUSIC model adequately sized all bioretention basins for all catchments that drain to each.
Response:

Refer to Civil Engineering Report (Engineering Report and Stormwater Management Plan), prepared by vT
Consulting Engineers (Attachment C) and Stormwater Quantity Management Plan prepared by Storm Water
Consulting Pty Ltd (Attachment D)




Item 35 –

Amend the MUSIC model to include all catchments (including external road catchments) that will experience increased
traffic or require road upgrades as a result of the proposed development. Demonstrate that the State Planning Policy
Water Quality Pollutant Reduction Targets will still be met. Also demonstrate that adequate permissions can be obtained
for construction and installation of any Water Quality Improvement infrastructure external to the site.
Response:

Refer to Civil Engineering Report (Engineering Report and Stormwater Management Plan), prepared by vT
Consulting Engineers (Attachment C) and Stormwater Quantity Management Plan prepared by Storm Water
Consulting Pty Ltd (Attachment D)



Item 36 –

Demonstrate how the capacity of the tourist park bioretention basin and detention basin will not be compromised from
inflows from future development.
Response:

Refer to Civil Engineering Report (Engineering Report and Stormwater Management Plan), prepared by vT
Consulting Engineers (Attachment C) and Stormwater Quantity Management Plan prepared by Storm Water
Consulting Pty Ltd (Attachment D)



Item 37 –

Label the nominated sizes for each basin on the drawings and ensure adequate footprint is included on the design to
include the required filter media area plus sediment forebays plus 1:4 batters around the edges of the basins and
maintenance access points. Also propose estimated inlet and outlet levels for the stormwater drainage to and from each
biobasin.

Response:

Refer to Civil Engineering Report (Engineering Report and Stormwater Management Plan), prepared by vT
Consulting Engineers (Attachment C)



                                                          18
Log in to download the original file

MCU14_0056 Information Response Cover Letter.pdf · 736 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.