SUPERSEDED -Decision Notice - OPW22 0299 [As Published] · OPW22/0299
Council may request further controls to be installed should the implemented measures be
found inefficient.
38. The erosion and sediment control measures must be designed, installed and maintained in
accordance with the supervising engineer instructions and the current best practice
standards * (Refer to Advisory Note).
39. The developer must ensure non-essential exposure of soil is prevented by restricting the
extent of disturbance and minimising the duration of soil exposure to adverse weather
conditions and effectively turf, cover or stabilise any disturbed area without delay and prior
to rainfall occurring.
40. The developer must ensure sediment does not leave the site or enter onto adjoining
properties or Council’s drainage system due to surface runoff or on tyres of vehicles and/or
machinery. It is essential to implement appropriate approved erosion and sediment control
measures throughout the site during all phases of construction including vehicle shakedown
pad/grid (or similar) at the access to the construction site. Where sediments or other
contaminants are deposited on a road, they must be removed so as not to enter Council’s
drainage system or waterways.
41. Prior to the completion of the development and commencement of use, all site surfaces must
be effectively stabilised using methods which have achieved effective short-term stabilisation
and which will continue to achieve effective stabilisation in the medium to long-term. For the
purpose of this condition, an effectively stabilised surface is defined as one that does not, or
is not likely to result in visible evidence of soil loss caused by sheet, rill or gully erosion or
lead to sedimentation, or lead to water contamination.
Landscape
Retention of Existing Trees and Vegetation
42. All trees and vegetation identified for retention must be protected in accordance with AS
4970, Protection of trees on development sites.
43. A qualified person * must be engaged for the duration of the works to:
a. Ensure works are carried out in accordance with the approved Arborist Report
b. Oversee installation of all tree protection fencing prior to commencement of any works
onsite (including any clearing).
c. Supervise tree protection within the development site and frontages, prior to, during
and following construction in accordance with AS 4970, Protection of trees on
development sites.
d. Supervise and undertake necessary tree protection for all trees affected by the
development on neighbouring Lots. This includes tree identified in Appendix 3 of the
approved arborist report that are identified as outside project scope – TPZ conflict.
e. Oversee approved tree removal in proximity to retained trees.
f. Undertake a risk assessment of all trees on neighbouring properties affected by the
development within striking distance of the development works and site and carry out
hazard removal and amenity pruning in accordance with AS 4373, Pruning of amenity
trees.
*(Refer to Advisory Note)
Page 8 of 16
Document Set ID: 22382767
Version: 3, Version Date: 24/04/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED -Decision Notice - OPW22 0299 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 185 KB (small file)
- File type
No other editions are linked here.