Council archive · source document
Compiled Approved Plans - 132001 210127 4 · 132001.210127.4
Plans and drawings: the text below has words only, no drawings.
Very large file (22.6 MB): may take a few minutes to open.
Original PDF page 15, section 1. The text section number identifies this passage in the reader.
5
B14 B13 B12 BS402 B11 B10 B9 B8 B3 DD B4 B5 B6 B7
MAXIMUM HEIGHT OF DEVELOPMENT
5° CB/M/GUTTER
AS PER NC PLANNING SCHEME
P/FC/- 5° P/FC/- P/FC/-
5° MR(1) CB/M/GUTTER
5° MR(1)
5°
P/FC/- P/HLB/-
P/FC/- RWH + DP
SC(2)
P/HLB/- W01
BSF.38
SHS COL CB/CUSO CB/CUSO
FIRST FLOOR P/HLB/- DP FBWK(1) FIRST FLOOR
DP DP
DP DP
20100 FBWK(1) P/HLB/- P/FC/- 20100
DP DP FBWK(1)
BAL(3) BLK (C) BLK (C) BLK (C)
P/HLB/-
P/FC/-
BAL(3) W01
STAIR
BSG.38
BLK (C) BS.S2
GROUND FLOOR GROUND FLOOR
16500 BLK (C) 16500
BLK (C) 15550 190BLK
SC(2)
15600 AT LANDING BEYOND
EXISTING GRND LINE SHOWN IS EXISTING GRND LINE SHOWN IS
INDICATIVE ONLY. REFER TO CIVIL INDICATIVE ONLY. REFER TO CIVIL
DOCUMENTS DOCUMENTS
1 BANKSIA SOUTH - ELEVATION - SOUTH 5 BANKSIA SOUTH - ELEVATION - NORTH
BS003 1 : 100 BS003 1 : 100
BANKSIA SOUTH - ZONE 2 BANKSIA SOUTH - ZONE 1
BQ 1 BP BN 2 BM BL 3 BK BJ 4
MAXIMUM HEIGHT OF DEVELOPMENT BS402 BS402 BS402 BS402
CB/M/BARGE CAPPING
AS PER NC PLANNING SCHEME MR(1) CB/M/RIDGE CAPPING
CB/M/BARGE CAPPING CB/M/RIDGE CAPPING CB/M/GUTTER
CB/M/GUTTER MR(1) CB/M/BARGE CAPPING MR(1) P/FC/- CB/M/BARGE CAPPING
CB/M/RIDGE CAPPING CB/M/GUTTER CB/M/GUTTER
CB/M/BARGE CAPPING
MR(1) CB/M/GUTTER P/FC/-
WH(1) WH(1) WH(1) WH(1) WH(1) WH(1) WH(1) WH(1) WH(1) WH(1)
SC(2) P/FC/-
CB/M/GUTTER
W01 W01 W01 W01 W01 W01 W02 W01 W01 W01 W01 W01 W01 P/HLB/- P/TWR/BLK
BSF.10 BSF.09 BSF.08 BSF.07 BSF.06 BSF.05 BSF.27 BSF.28 BSF.04 BSF.03 BSF.02 BSF.01 BSF.22
W01
BSF.27
8000
FIRST FLOOR DP
20100 DP DP P/HLB/- DP
DP P/HLB/- P/HLB/- P/HLB/-
WH(1) WH(1) WH(1) WH(1) WH(1) WH(1) WH(1) DP WH(1) WH(1) DP WH(1) DP
BLK (C) BLK (C)
W01 W01 W01 W01 W01 W01 W01 W01 W01 W01 W01
P/HLB/- P/TWR/BLK
SC(2) W02 W01
BSG.10 BSG.09 BSG.08 BSG.07 BSG.06 BSG.05 BSG.27 BSG.28 BSG.04 BSG.03 BSG.02 BSG.01 BSG.22
W01
BSG.27
GROUND FLOOR
2200
16500 BLK (C) BLK (C)
BLK (C) BLK (C)
D02 D01
BLK (C)
BSG.40 BSG.40
EXISTING GRND LINE SHOWN IS
INDICATIVE ONLY. REFER TO CIVIL
DOCUMENTS
2 BANKSIA SOUTH - ELEVATION - EAST
BS003 1 : 100
BANKSIA SOUTH - ZONE 1 BANKSIA SOUTH - ZONE 2
4 BJ BK 3 BL BM 2 BN BP 1 BQ
BS402 BS402 BS402 BS402
MAXIMUM HEIGHT OF DEVELOPMENT CB/M/BARGE CAPPING
CB/M/BARGE CAPPING
CB/M/RIDGE CAPPING CB/M/RIDGE CAPPING
AS PER NC PLANNING SCHEME P/FC/-
MR(1) MR(1) MR(1) MR(1)
CB/M/GUTTER CB/M/RIDGE CAPPING
CB/M/GUTTER CB/M/GUTTER CB/M/GUTTER CB/M/GUTTER
RWH + DP P/HLB/- WH(1) WH(1) WH(1) WH(1) WH(1) WH(1) WH(1) WH(1) WH(1) WH(1)
P/FC/-
W01 W01 W01 W01 W01 W01 W01 W01 W01 W01 W01 D01
DP P/HLB/-
W03 SHS COL
BSG.S1 BSF.20 BSF.19 BSF.18 BSF.32 W01 BSF.17 BSF.16 BSF.15 BSF.14 BSF.13 BSF.12 BSF.11 BSF.38
FBWK(2) W01
BSF.33
D02 BSF.38
CB/CUSO P/HLB/- FBWK(2) BSF.38
FIRST FLOOR
8000
HR(2)
DP DP DP DP
20100 P/HLB/- FBWK(1) DP P/HLB/- DP FBWK(1) DP DP P/HLB/- P/FC/-
WH(1) WH(1) WH(1) WH(1) WH(1) WH(1) WH(1) WH(1) BAL(3)
WH(1) WH(1)
P/HLB/-
3000
W01 W01 W01 W03 W01 W01 W01 W01 W01 W01 W01
BSG.20 BSG.19 BSG.18 BSG.32 W01 BSG.17 BSG.16 BSG.15 BSG.14 BSG.13 BSG.12 BSG.11 BLK (C) STAIR BS.S2 W01
BSG.33
W02 D01 W01 D02 BSG.38
BSG.S1 BSG.21 BSG.S1
BSG.38
GROUND FLOOR D01 BAL(3)
BSG.S2
190BLK BLK (C) BLK (C)
16500 LINK CORRIDOR SHOWN IS
INDICATIVE . DETAILS TBC.
HORIZONTAL WEATHERBOARD CLADDING EXISTING GRND LINE SHOWN IS
INDICATIVE ONLY. REFER TO CIVIL
DOCUMENTS
3 BANKSIA SOUTH - ELEVATION - WEST
BS003 1 : 100
AMENDMENTS COPYRIGHT: All rights reserved. This work is copyright and cannot be
PROJECT CLIENT
reproduced or copied in any form or by any means (graphic, electronic or
ISSUE DATE SUBJECT AUTHOR mechanical, including photocopying) without the written permission of
A 04/03/24 ISSUED FOR COORDINATION EA Hargraves Briggs Jacuzzi Pty Ltd. Any licence, expressed or implied, to use
B 09/04/24 S1 - FOR COORDINATION EA the document for any purpose whatsoever is restricted to the terms of the
APPROVED PLAN C 06/06/24 ISSUED FOR COORDINATION - AF EA agreement or implied agreement between Hargraves Briggs Jacuzzi Pty Ltd
and the instructing party.
132001.21027.4 D 24/06/24 S1 - 70% DD ISSUE EA
NORTH NOTE: Figured dimensions to be taken in preference to
enricharchitecture.com NOOSA COUNCIL
13 NOVEMBER 2024
E
F
22/07/24 S1 - 90% DD ISSUE
04/09/24 S1 PRE-TENDER ISSUE
EA
EA OZCARE NOOSA RE-DEVELOPMENT
DRAWING TITLE
scaled. Verify all dimensions on site before commencing
work or making shop drawings. When printing from
G 12/09/24 S1 TENDER ISSUE EA BANKSIA SOUTH - ELEVATIONS electronic files it is the responsibility of the operator to
ensure the required scale is [email protected] | 07 3392 0235
Office 3, 18-24 Duke Street, Kangaroo Point Qld 4169 APPROVED DATE SCALE
Hargraves Briggs Jacuzzi Pty Ltd TA Enrich Architecture EA 11/13/23 1 : 100 at A1
ACN 076 897 606 | ABN 90 076 897 606
80 COOYAR ST NOOSA HEADS
PROJECT NUMBER DRAWING NUMBER ISSUE
1907NOO_ DD_A_BS302 G
DESIGN DEVELOPMENT
Document Set ID: 23254114
Version: 1, Version Date: 20/09/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Compiled Approved Plans - 132001 210127 4Related documentApplication case desk ↗
About this file
- File size
- 22.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.