ORDINARY MEETING AGENDA 17 SEPTEMBER 2020
Plan No. Rev. Plan/Document Name Date
61948/B - Plan of Development – Proposed Boundary 4 August 2020
Realignment between Lots 480 & 481 on
MCH524 & lot 528 on MCH1930
3. All lot numbering on the subdivision plan to be submitted to Council for compliance
assessment must remain as shown on the Approved Plans.
Currency Period
4. The Currency Period for this development approval lapses if all conditions have
not been complied with, and the plan of survey lodged with Council for
endorsement by 31 August 2024, unless an application to extend the currency
period is approved by Council.
Building and Effluent Envelope (Lot 2)
5. The applicant must prepare a metes and bounds building and effluent envelope
plan indicating a House site area and effluent disposal area for Lot 2. The areas
must be in accordance with the Approved Plan. The plans must be submitted in
both hardcopy and digital format (dwg) on GDA 94 zone 56 coordinates. The
applicant must submit the plans to Council for approval prior to the endorsement
of the Plan of Survey.
6. The future dwelling on Lot 2 must be sited and constructed in accordance with the
approved building and effluent envelope shown on the Approved Plans. A copy of
the approved plan of development must be included in the contract of sale for Lot
2, together with a clause which requires the future dwelling to be constructed in
accordance with it.
ENGINEERING
Property Access and Driveways
7. A residential driveway must be constructed to Lot 2. The works must be undertaken
in conjunction with any subsequent building approval and the access must be:
a. generally in accordance with Council’s standard drawing RS-056 and any
associated addendum, and
b. located in that part of the frontage above the 0.05%AEP level.
8. A residential driveway must be constructed to Lot 1. The works must be undertaken
in conjunction with any subsequent building approval and the access must be
generally in accordance with Council’s standard drawing RS-056 and any
associated addendum
Stormwater Drainage
9. Stormwater runoff from the development must be disposed of on-site without
causing scour or damage to the subject site or any adjoining property.
Electricity and Telecommunication Services
10. Electricity and telecommunication services must be provided to each lot in
accordance with the standards and requirements of the relevant service provider.
11. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits
and pipes to accommodate the future connection of optic fibre technology
telecommunications.
Page 6 of 21