SUPEREDED Approved Plans MCU16 0117 & OPW16 212 pdf
LINDSAY CONSULTING PTY
LTD
APPROVED PLANS
MCU16/0117 & OPW16/0212
NOOSA COUNCIL
16 MARCH 2017
As Amended by Conditions
[OCR of page images]
APPROVED PLANS
MCU16/0117 & OPW16/0212
NOOSA COUNCIL
16 MARCH 2017
PROPERTY BOUNDARY
LINDSAY CONSULTING 2
CLA
OFF, 20/82 PA
THIS DRAWING REMAIN HE PROPERTY OF
LINDSAY CONSULTING PTY LTD AND IS FOR
THE SOLE USE OF THE CLIENT. NO PART
MAY BE USED IN PART OR WHOLE WITHOUT
PRIOR EXPRESS WRITTEN CONSENT OF
LINDSAY CONSULTING PTY LTD
. 3 % Pavenjent crossfall
Existing open drain
250 wide x 300 dee
EXISTING PAVEMENT WIDTH | concrete edge to vad
300 CUTBACK N32 concrete
OF EXISTING AC PAVEMENT 4
Se Footpath to be grade
we [te match existing
nd.
PA . =
a
<=
a
200 MM LS
As Amended by Conditions 3
To >
100mm B EL (TYPE 2.2) &
UR BACE COUBCE —D {TY DE ~ \ Lo
a
oO
a
a
TYPICAL PAVEMENT WIDENING CROSS SECTION
Project 11 OPAL STREET, COOROY
Comments Rainfall Calculations Total Site Area 1536 sqm
Limiting runoff from Site (Dia 450) 999 m3/sec (999 voids this check)
ARR Intensity Calculation Data - As obtained from BOM IFD program Pavement area to Detention Tank 0 sqm
Input Data Storage in bio-retention basins 0 cbm
Duration Roof Area into Detention Tank 300 sqm
ARI thr [12 hr [72 hr Site Area 1536 sqm
2 49.7 10.5 3.44 Travel length 50 m
50 94 25.8 9.13 Site Slope 0.01
Surface Roughness 0.013
iSkewness 0.13} Map 7 Land Description L L/M/D
Geographical Factor (F2) 4.39] Map 8& Soil Permeability L High/Medium/Low (H/M/L)
(Geographical Factor (F50) 17.57| Map 9 L ==> Light cover bushland, or poor grass cover, or low density pasture, or low cover bare fallows
M-==> Medium Density Bush, or good grass cover, or high density pasture, or zero tilling cropping
H==> Dense Bushland
Un-Developed Fraction Impervious 0.45 From Fig. 4.05.1 in QUDM (2007)
Developed Fraction Impervious 0.85 From Fig. 4.05.1 in QUDM (2007)
One Hr rainfall Intensity for Q10 70.99084 mm/hr
Calculated Travel Time 3 Min Must equal time selected for intensity
Adopted Storm Time 3 min
Detention Tank Provided 4000 It
Return interval (ARI)
1 2 5 10 20 50 100
Intensity (for Return Interval) 122.13 156.17 195.69 218.86 250.48 292.27 324.42
] | I I ] I I
C10 value 0.790 0.870 0.790 0.870 0.790 0.870 0.790 0.870 0.790 0.870 0.790 0.870 0.790 0.870
Fy Factor 0.800 0.800 0.850 0.850 0.950 0.950 1.000 1.000 1.050 1.050 1.150 1.150 1.200 1.200
Cy 0.632 0.696 0.672 0.740 0.751 0.827 0.790 0.870 0.830 0.914 0.909 1.001 0.948 1.044
Q (m3/sec) 0.033 0.036 0.045 0.049 0.063 0.069 0.074 0.081 0.089 0.098 0.113 0.125 0.131 0.145
Total Rainfall for event (m3) 7 9 13 15 18 23 27
Total Non-Worsening Volume for Storm (m3) 1 1 2 2 2 3 3
Roof Area Runoff for Storm (m3) 1 1 2 2 3 4 5
CLIENT AND PROJECT DESCRIPTION
T ROSSITER & S MURPHY
PROPOSED RESIDENCES
LOT 1 (SP248165) OPAL ST
COOROY
DRAWING TITLE
CIVIL WORKS
FRONTAGE WORKS
SCALES
SURVEY DATUM
ASSOCIATED CONSULTANTS
REVISION LIST
>
ORIGINAL ISSUE 15/9/2016
‘AMENDED OV 12/16
fompuler Flle
160604FP.DWG
DRAWING NUMBER ‘SHEET | REV.
16-0604-C2 2|B
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (SUPEREDED Approved Plans MCU16 0117 & OPW16 212 pdf.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.