Council archive · source document
Attachment 3A - Proposal Plans - OREZ · 132005.638.06
Plans and drawings: the text below has words only, no drawings.
Original PDF page 6, section 1. The text section number identifies this passage in the reader.
SITE LEGEND
SITE BOUNDARY
EXCLUSION ZONES
FT.1 SITE FENCE 1800H PVC COASTED
CHAIN LINK FENCE WITH STEEL TOP &
BOTTOM RAILS
EXPANSION ZONE
OPERATIONAL LEGEND
ZONE 1 RECEIVAL AND PRE-TREATMENT
ZONE 2 IN-VESSEL COMPOSTING AND
FACILITY AIR/WATER MANAGEMENT
ZONE 3 POST-SORT, MATURATION
AND STORAGE
ZONE 8 WEIGH BRIDGE
ZONE 4 ODOUR MANAGEMENT
ZONE 5 STAFF OFFICE AND PARKING
ZONE 7 FIRE SERVICES
ZONE 6 PUBLIC DROP OFF
ZONE 5 OFFICE/PARKING
UP
ZONE 4 ODOUR
ZONE 7 FIRE SERVICES
MANAGEMENT
ZONE 8 WEIGH BRIDGE
ZONE 2 IN-
VESSEL
COMPOSTING
ZONE 3 MATURATION/POST SORT
ZONE 6 PUBLIC ZONE 1 RECEIVAL/PRE-SORT
DROP OFF
SITE PLAN - OPERATIONAL ZONES
SCALE 1 : 500
Issue Project & Client at Architect Drawing Title Date 08/2026
No.
NOOSA COMPOST FACILITY 561 EUMUNDI NOOSA ROAD DOONAN QLD 4562 Scale As indicated @ A1
1 16.07.2026 CONCEPTUAL DESIGN
for
SITE PLAN - OPERATIONAL
2
3
28.07.2026
19.08.2026
CONCEPTUAL DESIGN
30% SUBMISSION OREZ ZONES 0 5 10 15 20 25m 30m
Drawing Reference
Nominated Architect Brett Sherson | NSW Registration No. 8622
Any form of replication of this drawing in full or in part without the written permission of
Brett Sherson constitutes an infringement of the copyright ©2026
20260272 - CP-0012
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 3A - Proposal Plans - OREZ.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.