Skip to the record
Every meeting, every word.

Council archive · source document

Attachment 3A - Proposal Plans - OREZ · 132005.638.06

of 103

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn

Original PDF page 11, section 1. The text section number identifies this passage in the reader.

                  O         N              M    L           K              J               I   H   G       F         E           D                               C       B               A
                                                                                                                                                                                                                                                                                                                                          OPERATIONAL LEGEND




                                                                                                                                                                                                                                                                                                                                               ZONE 1 RECEIVAL AND PRE-SORT


                                                                                                                                                                                                                                                                                                             MATURATION RIDGE RL 22.800
                                                                                                                                                                                                                                                                                                                                               ZONE 2 IN-VESSEL COMPOSTING AND
2600




                                                                                                                                                                                                                                                                                                                                               FACILITY AIR/WATER MANAGEMENT
                                                                                                                                                                                                                                                                                                             MAT/TUNNELS ROOF RL 20.200

                                                                                                                                                                                                                                                                                                                                               ZONE 3 POST-SORT, MATURATION
6000




                                                                                                                                                                                                                                                                                                                                               AND STORAGE

                                                                                                                                                                                                                                                                                                            MAT/TUNNELS FLOOR RL 14.200
                                                                                                                                                                                                                                                                                                                                               ZONE 4 ODOUR MANAGEMENT



                                                                                                                                                                                                                                                                                                                                               ZONE 5 STAFF OFFICE AND PARKING


       SITE ELEVATION - NORTH
                                                                                                                                                                                                                                                                                                                                               ZONE 6 PUBLIC DROP
       SCALE 1 : 350

                                                                                                                                                                                                                                                                                                                                               ZONE 7 FIRE SERVICES



                                                                                                                                                                                                                                                                                                                                               ZONE 8 WEIGH BRIDGE

                                                                                   8                   7                 6           5           4                   3       2   1




                                                                                                                                                                                                                                                                                                             MATURATION RIDGE RL 22.800
2600




                                                                                                                                                                                                                                                                                                            MAT/TUNNELS ROOF RL 20.200
6000




                                                                                                                                                                                                                                                                                                            MAT/TUNNELS FLOOR RL 14.200




       SITE ELEVATION - EAST
       SCALE 1 : 350




                                                A                                      B       C                                     D       E           F   G   H   I           J   K   L                      M                            N             O




                                                                                                                                                                                                                                                                                                             MATURATION RIDGE RL 22.800
2600




                                                                                                                                                                                                                                                                                                             MAT/TUNNELS ROOF RL 20.200
6000




                                                                                                                                                                                                                                                                                                            MAT/TUNNELS FLOOR RL 14.200




       SITE ELEVATION - SOUTH
       SCALE 1 : 350




                                                                       1       2   3                       4                 5           6           7               8




                                                                                                                                                                                                                                                                                                             MATURATION RIDGE RL 22.800
2600




                                                                                                                                                                                                                                                                                                             MAT/TUNNELS ROOF RL 20.200
6000




                                                                                                                                                                                                                                                                                                            MAT/TUNNELS FLOOR RL 14.200




       SITE ELEVATION - WEST
       SCALE 1 : 350




       Issue                                        Project & Client                                           at                                                                            Architect                                                                                      Drawing Title                                  Date      08/2026
       No.
                                                    NOOSA COMPOST FACILITY                                     561 EUMUNDI NOOSA ROAD DOONAN QLD 4562                                                                                                                                                                                      Scale     As indicated @ A1
       1       16.07.2026   CONCEPTUAL DESIGN
                                                                                                               for
                                                                                                                                                                                                                                                                                            SITE ELEVATIONS
       2       28.07.2026   CONCEPTUAL DESIGN                                                                                                                                                                                                                                                                                              0   3.5     7   10.5   14   17.5m   21m
       3       19.08.2026   30% SUBMISSION                                                                     OREZ
                                                                                                                                                                                                                                                                                                                                           Drawing Reference
                                                                                                                                                                                             Nominated Architect Brett Sherson | NSW Registration No. 8622
                                                                                                                                                                                             Any form of replication of this drawing in full or in part without the written permission of
                                                                                                                                                                                             Brett Sherson constitutes an infringement of the copyright                           ©2026
                                                                                                                                                                                                                                                                                                                                           20260272 - CP-0200

Used in these records

About this file

File size
4.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 3A - Proposal Plans - OREZ.pdf · 4.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.