Original source · versioned page text
Delegated Report - Code - Planning - OPW26 0063 (As Published)
With regard to Application No OPW26/0063 for Operational Works - Vehicle Crossover situated at 129 Eastern Branch Rd Kin Kin Qld 4571 and described as Lot 253 MCH 674, it is recommended the application be approved in accordance with the following details for the Decision Notice: 1. APPLICATION DETAILS Application No: OPW26/0063 Street address: 129 Eastern Branch Rd Kin Kin Qld 4571 Real property description: Lot 253 MCH 674 Planning Scheme: Noosa Plan 2020 (20 March 2026) 2. DECISION DETAILS Council decided to issue the following type of approval: • Development Permit for Operational Works - Vehicle Crossover 3. CURRENCY PERIOD OF APPROVAL The currency period for this development approval is stated in the conditions below. 4. ASSESSMENT MANAGER CONDITIONS APPROVED PLANS 1. Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date - - Site Plan - Prepared by the Applicant CURRENCY PERIOD 2. The Currency Period for this development approval lapses if the development has not substantially started by 22 July 2028, unless an application to extend the currency period is approved by Council. GENERAL CONDITIONS Engineering 3. Any conflict between the development and an existing or proposed service must be referred to the relevant service authority for determination prior to commencement of works. DURING CONSTRUCTION Engineering 4. The integrity and condition of any existing public or Council infrastructure and services (above ground and/or underground) must not be adversely affected by the proposed works 5. The developer must meet any costs to repair damage to any Council asset during construction, where damage is a result of the development works. Damage to assets must be repaired immediately where it creates a hazard to the community. In circumstances where the damage does not create a hazard to the community, it must be repaired immediately on completion of the works associated with the development. 6. All works must be constructed and work procedure undertaken in accordance with: Page 4 of 7 Document Set ID: 25003471 Version: 4, Version Date: 23/07/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.