Resonse to Amended Plans - John Cochrane
Attached to the e-mail Further submission from John Cochrane in response to amended plans - MCU21/0110.
Plans and drawings: the text below has words only, no drawings.
Appendix 3 Calile Hotel Waste Generation Calculations ttm Villas 45 Rooms 3,150 1,575 2,678 473 N/A N/A N/A Exterior | Land- > scaping 7,500 GFA (m?) N/A 10,500 N/A N/A N/A N/A N/A Total Weekly Volumes (L / Week) Boos 35,436 41,601 15,346 49,609 2,509 4,351 coneantes perce dN ome pe bay (G7 2256 | 1519 | 5,943 438 1,417 2 622 Volumes per Collection (L / Collection) 4,513 N/A 15,050 1,754 5,670 84 2,486 Collections per 1 Week 3/4 N/A 3/4 2 2 1 2 Storage Capacity 2 Days N/A 2 Days 4 Days 4 Days 7 Days 4 Collection and = Equipment Details Equipment Size 1100L an 1100. | 120L | 900LBale | 660L 660L Equipment 6 1 Quantity Required 4 i u 1S ° 5 A maximum Collection frequency of 3 and 4 days per week or 7 days per fortnight has been established to limit vehicular movements into the development. Where possible return to supplier type arrangements will be employed to optimise circular economy performance and further reduce vehicular movement, eg. polystyrene seafood boxes may be returned to vendors for re-use in backloading arrangements.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.