Skip to the record
Beware of cheap imitations.

Original source · versioned page text

Resonse to Amended Plans - John Cochrane

Attached to the e-mail Further submission from John Cochrane in response to amended plans - MCU21/0110.

of 14

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Appendix 3 Calile Hotel Waste Generation Calculations

ttm

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Villas 45 Rooms 3,150 1,575 2,678 473 N/A N/A N/A
Exterior | Land- >
scaping 7,500 GFA (m?) N/A 10,500 N/A N/A N/A N/A N/A
Total Weekly Volumes (L / Week) Boos 35,436 41,601 15,346 49,609 2,509 4,351
coneantes perce dN ome pe bay (G7 2256 | 1519 | 5,943 438 1,417 2 622
Volumes per Collection (L / Collection) 4,513 N/A 15,050 1,754 5,670 84 2,486
Collections per
1
Week 3/4 N/A 3/4 2 2 1 2
Storage Capacity 2 Days N/A 2 Days 4 Days 4 Days 7 Days 4
Collection and =
Equipment Details Equipment Size 1100L an 1100. | 120L | 900LBale | 660L 660L
Equipment
6 1
Quantity Required 4 i u 1S ° 5

 

 

 

A maximum Collection frequency of 3 and 4 days per week or 7 days per fortnight has been established to
limit vehicular movements into the development. Where possible return to supplier type arrangements will

be employed to optimise circular economy performance and further reduce vehicular movement, eg.

polystyrene seafood boxes may be returned to vendors for re-use in backloading arrangements.
Log in to download the original file

Resonse to Amended Plans - John Cochrane.pdf · 9.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.