Council archive · source document
APPROVED Document - Concept Construction Management Plan · OPW11/0116
Plans and drawings: the text below has words only, no drawings.
1. SITE LOCATION The site is located within the Noosa River entrance [Figure 1] adjacent to the Noosa River Spit. The works are located outside the Noosa River Fish Habitat Area [Figure 2]. ee Ber sd josa River sh Habitat Area & # if Figure 2: Extent of Works There is a tidal range of approx 2m [QT tide tables]. The site protected from ocean swell and seas by Noosa Spit and shoals within the entrance. Spring tidal velocities within the southern channel can be up to 1.5m/s, although this may change with channel configuration. The channels and shoal configuration is highly variable.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
APPROVED Document - Concept Construction Management PlanRelated documentApplication case desk ↗
About this file
- File size
- 3.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.