APPROVED Document - Concept Construction Management Plan · OPW11/0116
Plans and drawings: the text below has words only, no drawings.
A staged approach of construction is being adopted and this construction plan is relevant only for Stage 1 of the works
{Figure 4]. Stage 1 includes:
Retain existing rock wall [maintain / upgrade as required]
Submerged channel closure [partial]
Wall at end of Noosa River Spit
Groyne / Training Wall
Dredging for interim navigation (location to be determined)
Foreshore nourishment
Removal of dead trees (marine plants) as required
Widening of access track
e
°
°
.
.
.
.
.
The submerged channel closure, wall and groyne are to be constructed using sand-filled geotextile mega-containers.
: Proposed Stage 1 Works [preliminary design]
4. RELEVANT APPROVALS
The following approvals are being sought:
o Resource Entitlement
© Prescribed tidal works
o Interfering with Marine Plants
o ERA 16 1(b)
o Registration Certificate
°
Clearing (Nature Conservation Act)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
APPROVED Document - Concept Construction Management PlanRelated documentApplication case desk ↗
About this file
- File size
- 3.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.