NOOSA Checklist - Applications Involving Land
on Development & Land Use Sections

 

IDAS APPLICATION

This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.

 

1... APPLICATION FORMS .
1.1 Form 1 PartA
1.1.1. Ensure that the form is fully completed. — _

 

 

 

4.1.2 Inthe case of an MCU or Op Works below the high-water mark, owners cons i$ required. NI A
1.1.2.1 If there are multiple owners, the consent of each owner is required.
4.1.2.2 If the owner of the land is a company, either ACN No. or Company Seal required.
1.2 Form1 Part B-O Supporting Information

1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached.

4.1.2.1. Ensure that each of Forms B-O which are attached are fully completed. [4
2.. ‘REFERRAL INFORMATION “7 On, “ot
2.1 Ensure that items 1-23 have been checked and/or completed with regard to referrals.

3. ENVIRONMENTALLY RELEVANT ACTIVITIES
3.1. Ensure that Part G is completed if EPA referral is required.

 

 

 

3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application.

 

 

 

 

 

4. 1 FORM 2: REQUEST.TO CHANGE APPROVAL © 72% LL a f
4.1. Ensure that items 1-28 have been checked and/or completed including information regarding {
applicant details and owners consent.
5. PLANS .- * . ‘ .
5.1 Ensure that at least 6 sets of the Plan of Development (5 for Reconfiguration and Operational Z.
Works) accompanies the application. In addition ensure that each set is complete.
5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is |
unbound.
6. "SUPPORTING INFORMATION 9 Lo rr rn

 

6.1. Ensure that at least 6 copies of any report accompanies the application (5 for Reconfiguration
and Operational Works). If the application is accompanied by a covering letter, ensure that it is

{
capabie of reproduction. (J
6.2 Inthe case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound.

 

  

7 REE CL TRL EAST
7.4 Ensure that the application fee, as determined from the Council's adopted scale of fees,
accompanies the application or has been paid.

a
7.2 Ensure that the fee which has been paid is recorded on the application form. 4

wee te es ST aE sree oe

 

 

 

 

 

 

 

Receiving Officer Date ...... 2 3 { e (2 seveeeeeees

Having completed this form and accepted tnaanbicaton please deliver both to the following IDAS Application Receiving

trays:-

¢ Ifthe application is for a Material Change of Use exclusively -AOP1's desk in the Land Use Section.

¢ Ifthe application is for an Material Change of Use & Reconfiguration - AOP1's desk in the Land Use Section.

¢ Ifthe application is for Operational Works (for parking, access, Sewerage or drainage) exclusively — AOD2 in the
Land Development Section.

¢ — Inall other circumstances — AOP1’s desk in the Land Use Section.

Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.

 

 

 

SEP! g:\ant\forms\application checklist.doc
Full text of the other 33 pages

Page 2

   
  
 

OUTH PACIFIG REGIONS

Noosa Council
PO Box 141
TEWANTIN QLD 456

RE: BODY CORPORATE FOR HILTON PARK CTS 27490
COMMON PROPERTY 82 HILTON TCE
NOOSAVILLE QLD 4566

Pursuant to the Coastal Protection and Management and Other Legislation
Amendment Regulation (No.1) 2005, we wish to make application for Prescribed
Tidal Works under the new Code that was adopted on 17 November, 2005.

Please find attached:
1. IDAS A and P forms and Assessment Checklist
2. Two full sets of plans including constructional details
3. Proof of the land owner
4. Concurrence response from Queensland Transport (Regional Harbour Master)
5. Resource entitlement and concurrence response from Environmental
Protection Agency
6. Required Fee

Please note the comment from the Regional Harbour Master refers to Issue A of the
Site and Elevation plans which have since been amended by our Engineer. A copy of
the ISSUE A plan is attached for your information. The amendment was to the
position of the left pile which has been moved landward to the right pontoon edge.
The pile heights also have been changed to an RL of 3.6m. There _has_been_no
change to the position of the pontoon in the proposal.

Please advise when the $500.00 bond is payable and we will arrange for our client to
pay this directly to Council.

Pursuant to Section 3.2.3 of IPA, we look forward to your Acknowledgement Notice
within 10 business days after receiving this application.

Yours faithfully

The Jetty Fe

MR STEVE BELT
Applications Officer
THE MARINA SPECIALIST PTY LTD TRADING AS THE JETTY SPECIALIST - ABN 32 010 633 119
2 industrial Avenue, Caloundra Queensland 4551 Australia
Telephone 07 5492 5925 Freecall 1300133155 Facimile 07 5492 6699
Web Page - www.thejettyspecialist.com.au Email - [email protected]

ithe

Page 3

INTEGRATED PLANNING ACT 1997 Part A, Version 2.4, 29 May 2006

Form 1 Development Application

 

Common details E

The completion of all applicable qlestions-on Parl Ais mandatory for aif applications: Pait A mast be accompanied by the cofnple seerESAE Fee CO
_Tequiréd, and By one (1)-oF mére-othér completed paris of the Form-as required. For.more. information On the parts of the F Form refer to ww i
_. Any information requested in the torm: ay breve amsatatgrt othe appt: For further ikcettnesboct tate the idhowing etter to Tula,
{Description oftand “Hi. -Stteetaddress: frckxtinghause number, stest naine, suburb/k j
z 82 HILTON TCE, NOOSAVILLE QLD 4566

 

   

  

      
    

 

    

   

 

 

 

 

 

 
 

 

een ci Tt Stalls -
bo oblaited frotlite sdcuments’ Gr through the

 

 

 

 

 

Mote’ Ateas below high water eck ait aot
boca ma i nt irk a

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

oe ai er Fs i
assessing

 

 

 

 

 

 

 

 

 

 

 

  
   

CTO PARK -
COMMUNITY TITLES SCHEME 27490

 

Page 4

*
4!

INTEGRATED PLANNING ACT 1997

Part A, Version 2.4, 29 May 2006

 

Land owner’s consent (if applicable)
Section 3.2.1(3) of the IPA prescribes that an

 

 

20

, Land owner's consent to the making of this application:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

This checklist doas ot apply # the application requires
tha completion of Parts A and 8 of the Form only. It
must be completed for all other applications.

YES

application must contain, or be supported by, the Name Signature Date
written consent of the land owners, if the application ;
involves: (i)
(i) amatefatchangecfuse, fee eee eee ee eee eee ee ce eee eee nee eee eed
(fi) reconfiguration of a lot; -
{ti} work on land below high-water mark & not within a (ti)
canal as defined under the Coastal Protection and} | cee eed ccccececccc ccc ee eee eee eee eeee dees ee eeeee ed
Management Act 1995;0r an
{iv) work on rail corridor land defined under the (iii)
Transport infrastructure Act 19%, pce eee ec eee eee eeeeee---do--------eee ed
Section 3.8.1(2)(a) of the IPA provides that .
landowner's consent is not required for a mobile or (iv)
temporaryERA, eee enn nee e ee eee cee cee eee eee een ee denne eee nce cee ee eee dane eeee eee eed
For mora information refer to Guide 1. (vy)
Resource entitlement (applicable) 21. Does this application involve a State resource prescribed under a regulation (other than involving
Section 9.2.1(5) of the IPA requires evidence of quarry material on State coastal land under the Coastal Protection and Management Act 1995)?
resource entivemient ba given for applications that
involve a prescribed State resource. O NO - go to a24 x YES - go to Q22
Section 3.2.1(10}aYil) of the IPA prescribes that an + ee, + . . .
application eannot be taken to be properly made 22, This application is accompanied by evidence: (tick applicable box)
“tet ouence one ve entidement, (1 ofthe allocation of, or entitlement to, the resource - attach evidence and go to Q23(vi)
Rafer to schedule 10 of the Integrated Planning LD (ii) the chief executive of the department administering the resource is satisfied the
Regulation 1998 that prescribes the nature of evidence i i i i -
racaled bythe Stata oupportof fe lodging of Tus development is consistent with an allocation of, or entitlement to, the resource ~ go
development application, - | ‘ vy . . a
e (iii) the chief executive of the department administering the resource is satisfied the
development application may proceed in the absence of an allocation of, or
entitlement to, the resource ~ go to 023
Acti for complting 028 23. Evidence of the resource entitlement:
tt An (I) = (vi indatory I 7 A 5 . ar ‘
a cara evidence I (i) Resource entitlement / authority details (vii) Official stamp of the department
Tho official stamp of the Department of Natural SEE LETTER FROM EPA administering the resource (if
Resources, Mines and Water is mandatory where the 7 - applicable)
application involves any water or riverine quarry (ii) Name of delegated officer
aon 32.154) allows Po pn to init
1 time the evidence may be use: (vi) must iti ji
competed tthe evidence mo tinted (iii) Position of delegated ofticer
(iv) Signature of delegated officer
(v) Date
(vi) _ date of evidence eee
Assessment triggers 24. Is the IDAS Assessment Checklist completed and attached to this application?

LJ NO - the assessment manager may refuse to accept this application on the

grounds that the application has not been property made

 

Plans / drawings / reports

An application should be accompanied by datalls to
support the proposal & enable the assessment
manager, referral agencies and any person viewing
the application during public scrutiny or public
Notification to understand the scope af the proposal
and any potential impact,

 

25. Plans/drawings/reports accompanying this application:

 

 

 

 

Plan / Drawing / Report Number Title Date
(i) JSP-SJ-19290 iss 8 SITE PLAN 480)
Fi) USP-Syt9201 ss BE ELEVATION =—i(itstiséid*r: 29-8.07 |
Bee TSP -SW-O4S ESSE | Conceere pysiTY PILE | 20» F- |
Ww) 75P-SS- 00 Iss 4 Potten Cor, 2bok

 

 

 

 

 

PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information required by Part A
and any other relevant part of Form 1.

 

OFFICE USE ONLY (applicable to assessment manager's)

 

 

 

 

 

Date ofengagement / /

Accreditation Number:

___ Name:

Signature:

” DATE RECEIVING OFFICER'S REFERENCE
[ew 2075 | sectnen | (7ho for | Nee > Siac, | mummers [07/2473 |
thos trues . Notification of Engagement of Private Certifier (Opdonal tormal7, . Sones
To, Council. | have been engaged as the private certifier for the building work referred to in this application.

 

 

Page 5

a?

INTEGRATED PLANNING ACT 1997 (IPA)

Part P, Version 1.1, 27 March 2006

 

 

Completion of all applicable questions on Part P is mandatory for all applications involving assessment against the Prescribed Tidal Work Code contained in the
Coastal Protection and Management Regulation 2003 tor operational work that is prescribed tidal work within a local govemment tidal area.
For further information refer to Guide 24 Prescribed tidal work, and the Guideline for making an application for prescribed tidal work on the EPA Website,

 

Nature of the application

Tidal work is defined in the schedule to the
Coastal Protection and Management Act 1995.

Alltidal works, completely or partly within a local

govemment tidal area, other than tidal works

mentioned below, are prescribed tidal work.

The fotfowing tidal works are not prescribed tidal
rk:

a) tidal works for a new or existing structure that
is used for the operation of any of the
fotlowing—

(1) a port authority;

(ii) a public marine facility constructed by or
for Queensland Transport or a port
authority;

b) tidal works for any of the following—

{i) creating or changing the configuration or
characteristics of a navigational channel;
{ii) an inlet or outlet for aquaculture caried
out on land if the aquaculture is made
selt-assessable under the local
govemment's planning scheme.
Part M should be completed for applications for
tidal work that is not prescribed tidal work.
‘The fee for works may depend on the type of
work. £.g. For works other than a private
purpose, EPA's concurrence fee is calculated in
terms of the value of the completed works,

1.

2.

This application is for operational work for the following prescribed tidal work, carried out
completely or partly within a focal government tidal area: (tick one (1) or more applicable boxes)

(1 () __ jetty, pier or wharf;

D i) boat ramp or slipway;

C1 (ii) mooring pile;

Cl (iv) deck or boardwalk;

I) (v) pontoon;

CJ (i) revetment, sea wail or retaining wall;

(1 Wil) other (e.g. abutment, basin, bridge, breakwater, dam, dock, dockyard, embankment, groyne, pipeline or
other underground service etc) ~ provide details below,

This application is for prescribed tidal work, that is for:
(i) __ private purposes; or
(1 (i) _ other than private purposes.

 

Estimated value of the completed works:
[ $22,862.00 |

 

 

 

Local government tidal area

Tidal area for a local govemment Is defined in
schedule 10 of the integrated Planning Act 1997
(IPA).

Access to adjoining properties

Evidence may include the support of the
adjoining property owner for the proposal and a
water allocation area illustrated on the plans.
Refer to the Guideline for preparing a water
allocation area on the EPA Website,

The local government tidal area in which the works are proposed is: (e.g. Caims, Gold Coast, Mackay)
[ NOOSA COUNCIL

 

 

Is the application supported by evidence that the proposed works will not prejudice the access
tights of adjoining property owners?

CI No

YES - attach evidence

 

Navigational safety

Maritime Safety Queensland (MSQ) and the
assessment manager require information on
neighbouring structures to ensure the proposal
does not impact on navigational safety or the
common law right of accass to and from abutting
waterfront properties. Applications may not be
approved if they interfere with access rights of
abutting waterfront properties or with navigation
in the waterway.

Is the application within a cul-de-sac or a bend in a waterway or other location where the side
boundaries of the lot connected to the work and neighbouring lots are not at right angles to the
waterway?

KINO

oO YES - attach photographs of, or approval information for constructed or unconstructed neighbouring structures

 

Maritime Safety Queensland (MSQ)
response

A pre-application concurrence response from
MSQ can only be provided on applicant request.

Note: A pre-application concurrence agency
response is of no effect if’ah’application thiggérs”
referral coordination.

 

Is the application supported by a pre-application concurrence agency response from the chief
executive under the Transport Operations (Maritime Safety) Act 1994?

CNno

w& YES - attach response

treme . = stent, eek

 

Page 6

INTEGRATED PLANNING ACT 1997 (IPA)

Part P, Version 1.1, 27 March 2006 y

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Details of the application 8. Confirm, by ticking the applicable box(es), that the following details are provided in plans
Advice tor completing G8 supporting this application:
This information should be provided in such a (i) the location and dimensions of the proposed tidal works iri relation to the lot/s abutting
information (Le. this oo " .
may trwoh site or torn plan Vana the proposed works and the tidal land on which the works are proposed to be
elevation). constructed;
Addie to completa te etal &&] (ii) all other structures on the water frontage and within 20 metres of the proposed works;
onto Seat ted roc cee as sit or {&] (ii) the current location of Lowest Astronomical Tide (LAT), Highest Astronomical Tide
sol) matt is the properly of ‘ihe State. Refer fo the (HAT), and Mean High Water Spring (MHWS);
A Gui i on .
the EPA Websta wary mate {Xd (iv) the slope angles of the beds and banks of the tidal area;
Advice for completing @10 EX] (v) the structural components of the proposed work;
Hane works are proposed oocreoe be DJ (vi) the engineering design standards of the proposed works;
and the application does not require evidence of [XI (vii) the physica! appearance of the structure including the materials used to construct the
resource entilement and does Act require, work and the proposed colour of the work;
Note: “Abutting* means having a common (viii) the engineering design specifications of the proposed works including references to the
boundary or edge; touching. relevant Australian Standards;
EX] (ix) the finished levels of the proposed works;
{K) (x) details of the largest vessel to be moored at the structure;
C1 (xi) if dredging or excavation is required, the volume and type of material to be removed
and the disposal area for the material being removed.
9. _ For works involving the removal of quarry material below high water mark, provide details of th
resource allocation permit number: (i.e. sand or gravel removed and placed above mean high water spring tide
LNA |
10. Is the application within a canal as defined in the Coastal Protection and Management Act 1995?
No
(Yes
Certification by a Registered 11. Have the design and safety provisions stated in the Prescribed Tidal Work Code contained in the
Professional Engineer Coastal Protection and Management Regulation 2003 been certified by a Registered
A Registered Profassional Engineer of Professional Engineer of Queensland (RPEQ), or interstate equivalent?
Queensland (RPEQ), of the interstate equivalent
can certity that the proposed works comply with {LJ NO
Pe a Sa as of the (1) YES - provide the details below
Note: The provision ofthe certtication may Name of RPEQ or equivalent (in ful) | CARDNO (QLD) PTY LTD
wos Consit fre-asseement manapar Contact mailing address P.O. BOX 388 TOOWONG QLD 4066
regarding the applicable fee. Contact telephone/facsimile number 07 3369 9822, 07 3369 9722
RPEQ No, or equivalent 1667
This is to certify that each plan, lodged in support of this application, has been appropriately certified by
the above mentioned Registered Professional Engineer of Queensland (RPEQ), or interstate equivalent. 'e
Portable Long Service Leave levy (if | 12. Is payment of a Portable Long Service Leave (PLSL) levy applicable to the proposal?
applicable) .
Prior to issuing a development permit for the & NO - G15, 14 & 18 do not apply
works, the assessment manager is required by (1 YES - complete 013
law to “sighf’ an approved form, issued by '
Gleave, which signi that the PLSL levy under | 13. Has the PLSL levy been paid?
the Building and Construction Industry (Portable - i i h
Long ‘Sone Leave) Act 1991 has boon pad, (1 NO - the applicable levy must be paid before a development permit can be given for the works
For further information refer to 1 YES - complete Q14 4 15
htto/Avww.gleave.qid.gov.au 14. Amount paid:
15. Receipt number:

 

 

L

PLEASE NOTE

PART P of this form cannot be accepted by the assessment manager unless accompanied by PART A of the form. The assessment Tanager may refuse
to accept an application that, at the time of lodgement, fails to provide all applicable information requested by Part A and any other relevant part of Form 1.

 

OFFICE USE ONLY (applicable to assessment manager)

 

 

DATE RECEIVED

 

 

COST CODE
(Applicable to EPA oniy)

REFERENCE NUMBER/S

 

 

 

 

 

Page 7

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007

  
  

   

Form 1 Development Application

IDAS Assessment
Checklist

(Formerly the “Referrals Checklist”)

 

 

IMPORTANT NOTE FOR ALL APPLICANTS:

1. This checklist was formerty referred to as the “Referrals Checklist’. Some of the ‘Guides’ to using the IDAS Application Forms continue to refer to this document as the
“Referrals Checklist”. The name of this checklist was changed from 25 July 2005 to more accurately describe its function.

2. — Under the IPA and IDAS framework, an application may require assessment by the focal Council and/or certain Queensland State entities (e.g. Environmental Protection
Agency, Dept. of Natural Resources and Water, Queensland Heritage Council etc.).

3. This checklist is provided to assist applicants to determine when an application requires assessment by a Queensland State entity and may also assist the applicant to
determine the assessment manager" for the application.

4. — Therefore, the completion of all questions in section 1 of this checkiist is mandatory for all applications (other than those requiring the completion of Parts A & B only).

5. Itis the responsibility of the applicant to accurately complete this checklist.

é Section 2 is mandatory only if the proposed development is located in any part of a wild river area declared under the Wild Rivers Act 2005.

. Depending on the nature of the application, an applicable State entity may be either the assessment manager or an [DAS referral agency for the application.

8. The assessment manager for the application will rely on the Information provided in this checklist (as well as any material lodged in support of the application) to identity
any applicable referral agencies for the application in the Acknowledgement Notice. The assessment manager will also rely on this information when identifying if the
application triggers referral coordination?,

9.  Toassist you in answering the following questions a series of guides are available free from the IPA website www.ipa.qid.gov.au. Guide 25 explains the role of the IDAS
Assessment Checklist in the IDAS application process, and its relationship to the Form 1 development application.

10. Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from
www. ipa.qid.gov.au.

11. Section 3 provides advice about the referrals that can be required for applications for building work assessable against the Building Regulation 2006.

 

 

SECTION 1 - STATE ASSESSMENT (completion mandatory)

Note: The following state assessment triggers apply to development other than for bullding wort assessable against the Building Regulation 2006.

 

 

Environmentally relevant activity 1, The application involves: (tick applicable box/es)

For more information refer to Guide 4. (1 (i) an environmentally relevant activity (ERA) for which a code for environmental compliance
Unless you answered “none of the above” to Q1, has not been made - complete Part G of Form 1
the application requires assessment by the a wry . . .
adminstrin authority . y C1 (ii). a mobile or temporary ERA for which a code of environmental compliance has not been
{tan entity, other than the administering made - complete Part G of Form 1

on, is the assessment manager for the 1 (iii) none of the above
‘application, the administering authority is a

concurrence agency for the application in relation!
to this matter.

Note: An application involving ERA 19 and/or 20
will also require completion of Part Kr of Form 1
for approval where an allocation under the Water|
Act 2000 is required.

 

 

Continued overleaf

 

PLEASE NOTE: The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the
completed IDAS Assessment Checklist (if applicable).

 

OFFICE USE ONLY (applicable to assessment manager)
DATE RECEIVED REFERENCE NUMBER/S.

 

 

The assessment manager is responsible for assessing and deciding an IDAS application. The assessment manager for an application i is ; prescribed it in schedule 8A of the IPA. "

2 Fer additional information refer to Guide 6 ‘Does my application trigger the referral coordination process?”

3 The ‘administering authority’ may be elther the Environmental Protection Agency, the relevant local government (far a devolved ERA) or the Queensland Department of Primary Industries and
Fisheries (for a delegated ERA).

Page 1

Page 8

INTEGRATED PLANNING ACT 1997

State-controiled road matters

For more information refer to Guide 3.

Unless you answered “none of the above” to Q2,
the application triggers referral to the Department:
of Main Roads (DMR) as a referral agency.

In certain circumstances DMR will be an advice
agency, while in other circumstances DMR will
‘be a concurrence agency.

Schedule 2 of the iP Requtation will assist you to
determine where DMR is an advice or
concurrence agency for the application.

2.

IDAS Assessment Checkist, Version 20, 2 April 2007 “"
The application involves: (tick applicable box/es)
(1 (i) development on land contiguous to a State controlled road and for -
C1 (a) material change of use assessable against the planning scheme;

(71 (b) reconfiguring a lot unless -
« the total number of lots is not increased; and
« the total number of lots abutting the State-controlled road is not increased;
CO (c) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a lot mentioned in (b) above}-
¢ associated with access to a State-controlled road; or
« for filling or excavation; or
« involving the redirection or intensification of site stormwater from the land, through a

pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road,

C (ii) development on land not contiguous to a State-controlled road and -
1 (a) material change of use-
assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;

LD (b) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regulation
and exceeding the thresholds set by that schedule;
(1 (©) operational work (not associated with a material change of use assessable against @®
planning scheme or reconfiguring a lot mentioned in (b) above-
* assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule.

LX (iii) none of the above

 

Clearing vegetation
For more information refer to Guide 12.

* Unless you answered “none of the above" to Q3,
the application requires assessment by the
Department of Natural Resources and Water
(NRW).
if an agency other than NRW Is the assessment
manager for the application, NRW Is a
concurrence agency for the application in relation
to this matter.

I you ticked Q3(/) or (li), your application requires
referral to NRW for assessment regardless of
whether vegetation clearing is proposed or not.

The. application involves: (tick applicable box/es)
(i) material change of use-
(a) assessable against the planning scheme;
(b) ona lot containing -
* acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
+ if there is no property map of assessable vegetation for the lot - remnant vegetation;
(c) where the existing use of the land is a rural or environmental use; and
(d)_ where the size of the land is 2 hectares or larger - complete Part J of Form 1
reconfiguring a lot -
(a) ona lot containing a category 1, 2 or 3 area shown on a property map of

assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;

where the size of the lot before the reconfiguration is 2 hectares or larger;

(c) where 2 or more lots are created; and

(d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1

operational work -

(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and

(b) not associated with a material change of use assessable against the planning

scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
Form 1

[XI (iv) none of the above.

O (i)

(b)

Diiii

 

Strategic port land

For more information refer to Guide 11.

If you ticked {i} - the relevant Port Authority is the
assessment manager for the application.

It you ticked (ii) Queensland Transport is a
concurrence agency for the application.

 

The application involves:

[1 (i) development on strategic port land as defined in the Transport infrastructure Act 1994 (TI
Act) - complete Part | of Form 1

CO (ii) a material change of use that is inconsistent with the land use plan approved under the
TI Act for the strategic port land - complete Part! of Form 4

(iii) none of the above

 

4 Land contiguous to a State-controiled road is defined in schedule 14 of the IP Regulation to mean land - if part of the land is within 100m of the State-controiled Toad; or that is part of a future State-

controlled road,

Page 2

Page 9

‘

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 20, 2 April 2007

 

Acid sulfate soils 5.

For more information refer to Guide 10.

Unless you answered “none of the above” to 5,
the appfication requires assessment by
Gepartment of Natural Resources and Water
(NRW).

ifan agency other than NRW is the assessment
manager for the application, NRW is an advice
agency for the application in relation to this
matter.

The application involves development on land situated in an identified’ local government area

and where the surface of the land is: (tick applicable box)

(0 @)_ below 20m AHD® and the development will involve the excavation of 1000m?or more of
soil or sediment at or below 5m AHD, or

( (ii) at or below 5m AHD and the development will involve filling the site with 1000m or more
of material

[XI (iii) none of the above

 

 

Major hazard facilities or possible 6.

major hazard facilities

For more information refer to Guide 17.

ltyou answered "YES" to Q6, the application
requires assessment by the Department ot
Emergency Servicas (DES).

Ifan agency other than DES is the assessment
manager for the application, DES is a
concurrence agency for the application in
telation to this matter.

 

Does the application involve a material change of use for a major hazard facility or possible
major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?

—J NO

LIYES - complete Part L of Form 1

 

Water related development under the | 7.

Water Act 2000
For more information about items (a) — (f), refer
to Guide 15. For more information about item
(9), refer to Guide 14 Does my application
involve assessment of a referable dam?
@ie: you answered "none of the above” to Q7,
the application requires assessment by the
Department of Natural Resources and Water
(NRW),
If an agency other than NAW is the assessment
manager for the application, NRW is a

concurrence agency for the application in
relation to this matter.

The application involves:

LJ (i) operational work, for taking or interfering with water under the Water Act 2000, that is:
{tick applicable box/es)

C1 (a) ina watercourse, lake or spring, (eg. a pump, gravity diversion, stream re-cirection, weir or
dam) - complete Part Kz, Ks, Ks, Ke, or Ks of Form 7 whichever is applicable,

(J (b) for an artesian bore anywhere in the State, no matter what the use - complete Part
K, of Form f;

(J () fora subartesian bore, in declared subartesian area’, or in a certain area covered

by a water resource plan, for use for purposes other than stock and/or domestic

US@ - complete Part K; of Form 1;

for a subartesian bore, in certain declared subartesian areas, for use for stock

and/or domestic purposes - complete Part K: of Form 1;

for taking overland flow water in certain areas covered by a water resource plan

— complete Part Ks of Form 1;

for interfering with overland flow water in a drainage and embankment area -
complete Part Kio of Form 1

oO
CO (g) for constructing a referable damé or works that will increase the storage capacity
of a referable dam by more than 10% - complete Part Ks of Form 1; OF

KX (i) none of the above.

Od
Dee)

 

Removal of quarry material from a 8.
watercourse
For mora information refer to Guide 16.

If you answered “YES” to Q8, the application
requires assessment by the Department of
Natural Resources and Water (NRW),

if an agency other than NAW is the assassment
manager for the application, NRW is a
concurrence agency for the application in
relation to this matter,

Note: Part G of Form 1 is required to be
completed as the activity of removing quarry
material from a watercourse is also an
Environmentally Relevant Activity (ERA).

 

 

Does the application involve development for the removal of quarry material from a watercourse?
requiring an allocation notice under the Water Act 2000?

—X NO

(YES - complete Parts Kr and G of Form 1

 

5. The identified tocal government areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Calms, Calliope, Caloundra, Cardwell, Carpentaria, Cook,
Cooloola, Dounglas, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, isis, Johnstone, Uvingstone, Logan, Mackay, Maroochy, Maryborough, Mirdumn Vale, Mornington, Noosa, Pine Rivers,

Austratian Height Datum (AHD).

oon’

Referable dam is defined under the Water Act 2000.
Watercourse is defined in sch 10 of the [PA.

Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro; Torres, Townsville; Whitsunday. © +

Vesey Leben re ree

The dectared ground water areas are listed in Guida 13 Development in @ declared catchment area,

Page 3

wet tes

Page 10

INTEGRATED PLANNING ACT 1997 (DAS Assessment Checklist, Version 20, 2 April 2007 ”
Operational work that is tidal work or |9. The application involves operational work that is: ( tick the applicable box/es)

 

workin coastal management district (1 (i) tidal work*® as defined under the Coastal Protection and Management Act 1995 (the
more information about prescribed tidal work in Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; oF

tocal govemment tidal areas refer to Guide 24, (XJ (ii) tidal work that is prescribed tidal work'' other than in a canal’? -complete Part P of Form 1; oF
Unless you answered “none of the above” to 09, ey : se .

the pptcation requires meseesment by the LD (iii) carried out within a coastal management district under the Coastal Act and for - complete
Environmental Protection Agency {EPA). Part M of Form 1 if any box/es (a) to (i) below are ticked,

tran agency oer than EPA the assessment (J (a) constructing or installing works in a watercourse between MHWS and HAT (ie.
manager for the application, isa —_ .
concurrence agency for the application in other than those works in tidal water) where the development has been determined not
relation to this matter, to be assessable against the Water Act 2000 ;

Loca! goverment is the assessment manager (J (b) constructing a canal’? intended to be connected to tidal waters:

for all prescribed tidal work. . eee
° ° (©) constructing an artificial waterway;

LD @) reclaiming land under tidal water;
[1 (e) disposing of dredge spoil or other solid waste material in tidal water;
C2 (f) _ interfering with quarry material on State coastal land above high-water mark;

[J (g) draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;

(1 (h) removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;

(1 (i)) constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or @

C1 (iv) none of the above.

 

 

Operational work below high water | 10. The application involves operational work that is: ( tick the applicable box/es)

mark ‘ 3 : .
For more information reter to Guide 18. For C (i) tidal work's as defined under the Coastal Protection and Management Act 1995 (the

more information about prescribed tidal work in Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or

focal goverment tidal areas refer to Guide 24. (ii) tidal work that is prescribed tidal work'+ - complete Part P of Form 1; 0r

Unless you answered “none of the above” to Fa : tyes ee

Q10, the application triggers referral to CD (iii) carried out within a coastal management district'S under the Coastal Act and for -

Gig) as a concurrence agency. (2) {a) disposing of dredge spoil or other solid waste material in tidal water - complete Part
Local government is the assessment manager Mot Form " ,

for all prescribed tidal work. LD (b) reclaiming land under tidal water - complete Part M of Form 1; of

C1 (c) constructing a canal’, if the canal is associated with reconfiguring a lot - completa
Part M of Form 1;

CD (iv) none of the above.

 

Coastal management 11. The application involves: (tick the applicable box/es)
For more intormation refer to Guide 18. C1 (i) a material change of use assessable under a planning scheme involving operational
Unless you answered “none of the above” to i i istrict!5
It, the application requires assessment by the ; work carried out completely or partly in a coastal management district
Environmental Protection Agency (EPA). QO (i) a material change of use assessable under a planning scheme Involving building @
It an agency other than EPA is the assessment work, carried out completely or partly in a coastal management cistrict that is ~

lication, EPA i , . .
concumenoe agerey for he apicaten in « the construction of a new premises with a GFA'® of at least 1000m2
relation to this matter. « the enlargement of the GFA of existing premises by more than 1000m?

D1 (ili) reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district

Di (iv) reconfiguring a lot'” assessable under schedule 8 of the IPA and in connection with
the construction of a canal!? - complete Part M of Form 1

EX (v)_ none of the above

 

 

10 Tidal work is defined in sch 10 of the IPA.

11 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or paitly within a local government tidal area.

12 Canal means canal as defined under the Coastal Protection and Management Act 1995

13 Tidal work is defined in sch 10 of the IPA.

“14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or pasily within a local government tidal area.

15 Coastal management district is defined in sch'10 of the IRA and means a coastal management district under the Coastaf Protection and Management Act 1995, other than an area declared as a
coastal management district under section 47(2) of that Act.

16 GFA is defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to calculated GFA, go to the planning scheme agains! which the application is being assessed.

17 Under $117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be
accompanied by the application for the operational works to construct the arlificial waterway.

Page 4

Page 11

 

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
Development within the limits of a 12. Does the application involve development below high water mark'® and within the limits of a port
port under the Transport infrastructure Act 1994?

For more information refer to Guide 18. For
information about prescribed tidal work refer to
Guide 24.

if you answered “YES” to @12, the apphication

triggers referral to the Port Authority.

The Port Authority is a concurrence agency if the

development is -

e within 200m of a shipping channel of an entry
and exit shipping corridor for the port

e within 1000m of a swing basin, a commercial
shipping wharf, a mooring, anchorage or spoil
grounds;

within 1000m of a planned port facility .
identified in a land use plan approved under
the Transport Infrastructure Act 1994.

tn ail other situation the Port Authority is an

advice agency.

NO
(YES - complete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work

 

 

Marinas

For more information refer to Guide 18. For
Information about whether a marina is prescribed
tidat work refer to Guide 24. The local
goverment is the assessment manager for all
prescribed tidal work.

It you answered “YES” to Q13, the application

Service as an advice agency.

or: referral to Queensland Fire and Rescue

13.

Does the application involve operational work that is tidal work for a marina’? with more than 6
vessel berths?

Ed NO

(C1YES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work

 

 

Tidal works in strategic port land tidal
areas

For more information refer to Guide. 18.

Untess you answered “NO” to 014, the relevant
Port Authority is the assessment manager for the
application and the Environmental Protection

Agency (EPA) and Queensland Transport (QT)
are concurrence agencies for the application,

 

4,

Does the application involve tidal works within a strategic port land tidal area2°?

) No

(YES - complete Part M of Form 1

 

Heritage

For further information refer to Guide 19.
(tyou answered “YES” to Q15, the application
triggars referral to the Queensland Heritage
Council as concurrence agency for the
application.

Unless you answered “none of the above" to
Q15(b), the application Involves referral to.the

Environmental Protection Agency as an advice
agency for the application

15.

Does the application involve development in a heritage registered place as defined under the
Queensland Heritage Act 1992?

No

(1 YES - complete Part C of Form 1

15(b)The application involves: (tick applicable boxes)

Ci (i)) — amaterial change of use assessable against the planning scheme and the lot shares a
common boundary with a protected area or registered place under the Queensland
Heritage Act 1992,

C1 (ii) reconfiguring a lot if the lot shares a common boundary with a protected area or
registered place under the Queensland Heritage Act 1992;

(ili) none of the above.

 

Declared catchment areas

For more information, including a list of the
declared catchment areas within Queensland,
refer to Guide 13.

Unless you answered “none of the above” to
Q16, the application requires assessment by the
Department of Natural Resources and Water
(NRW).

if an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in
relation to this matter.

 

 

16.

The application is in an area declared to be a catchment area under the Water Act 2000 and
involves: (tick the applicable box/es)

(1 (i) reconfiguring a lot if any lot resulting from the reconfiguration is less than 16 hectares;

C1 (ii) development assessable against the planning scheme involving the establishment or
expansion of a waste water disposal system, other than a disposal system for carrying
out an environmentally relevant activity under the Environmental Protection Act 1994;

[X] (iii) none of the above

 

wea « ere

» . tea sean . tomy . .

18 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide.
19 Marina Is defined in the Transport Operations (Maritime Pollution) Regulation 1995,
20 Svategic port land tldal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port tand.

Page 5

Page 12

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 20, 2 April 2007

 

 

 

Contaminated land 17. The application involves: (tick the applicable box/es)
Applications involving material change of use 7 ji, i j _
and! or revontiguring a tt may tigger this OW reconfiguring alot for which all of part of the premises are
referral. (a) premises mentioned in the IPA, schedule 8, part 1, table 2 -
For more information refer to Guide 5. « item 5, including the exemption otherwise provided for by paragraph (d);
Unless you answered “none of the above” to « item 6, including the exemption otherwise provided for by paragraph (@); or
Q17, the application requires assessment by the ei i i i i it ini ivi
Environmental Protection Agenty (EPA). Han en 77, including the exemption otherwise provided for a mining activity or petroleum
agency other than EPA is the assessment a vity; or . . .
manager for the application, EPA will be a (b) in an area for which an area management advice has been given for unexploded
concurrence agency for the application in -
relation to this matter ; ordnance - complete Part N of Form 1
{J (ii) a material change of use -
(a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
{b) assessable against the planning scheme and if all or part of the premises is in an area
for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 1
{1 (iii) none of the above
Electricity infrastructure 18. The application involves: (tick the applicable box/es)

For more information refer to schedule 2of the IP
Regulation.

Unless you answered "none of the above” to
Q18, the application triggers referral to the
agency to which the easement is granted in
favour of as advice agency.

(1 (i) reconfiguring a lot where any part of the lot is ~

subject to an easement in favour of a distribution entity or transmission entity under the
Electricity Act 1994 and the easement is for a transmission grid or supply network under
that Act; or

« situated within 100m of a substation site; @

a material change of use, assessable against a planning scheme and not associated

with reconfiguring a lot if -

* any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the easement is for a transmission
grid or supply network under that Act; and

any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement;

a material change of use, assessable against a planning scheme and not associated

with reconfiguring a lot if any part of the premises is situated within 100m of a substation

site;

operational work that is filling or excavation assessable against the planning scheme,

not associated with reconfiguring a lot, if -

any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
the easement;

the work is located wholly or partly within 10m of a substation site;

none of the above.

O tii)

D iil

OW)

Ww)

 

Land designated for community
infrastructure

Applications involving development on land
designated for community infrastructure may
trigger this referral.

For more information refer to schedule 2 of the
IP Regulation.

if you answered “YES" to Q19, the application
requires assessment by the chief executive of
the department administering the Act authorising
the development for the designated purpose.
tf an agency other than the designator is the
assessment manager for the application, the
designating agency will be a concurrence
agency for the application in relation to this
mattes.

 

Does the application involve development assessable against the planning scheme and on land
designated for community infrastructure? @

(i) intended to be supplied by a public sector entity; and
(ii) on ‘and not owned by or on behalf of the State; and
(iii) other than development -

(a) for the designated purpose; or

(b) carried out by, or on behalf of, the designator.
INO
Yes

 

ars

Page 6

Page 13

INTEGRATED PLANNING ACT 1997
SEQ Regional Plan

For more information refer to schedule 2 of the
IP Regutation.

Refer to Chapter 2, part 5A and schedule 10 of
the Integrated Planning Act 1997, and schedule
2 of the Regutatory Provisions for relevant
definitions.

Unless you answered “none of the above” to
020, the application requires assessment by the
Office of Urban Management (OUM).

Fisheries matters

For more information refer to schedule 2of the iP
Reguiation.
Unless you answered “none of the above" to
21, the application requires assessment by the
De ent of Primary Industries and Fisheries
(OPIRF),
It an agency other than DPI&F Is the assessment
Qu for the application, DPI&F is a
concurrence agency for the application in
relation to items (i) - (iv) and an advice agency
in relation to item {v).

IDAS Assessment Checklist, Version 20, 2 April 2007
20. The application involves (tick applicable box/es) -
(1 (i) a material change of use of premises -
(a) in a Major Development Area in the Urban Footprint for -
DD (i) an urban activity -
(J sinanarea included in a structure plan where the IPA, section 3.1.6
applies;
(2 inanarea not included in a structure plan where -

« the IPA, section 3.1.6 applies to the application for the material change
of use; or

« the premises exceeds 10,000m2; or
e the gross floor area (GFA) on the premises will exceed 10,000m2; or
« impact assessment is required under the relevant planning scheme

CO (ii) intensive animal husbandry, or
C1 (ii) residential development involving a rural residential purpose

(b) in the Regional Landscape and Rural Production Area tor -
0 (i) an urban activity and not specified in section 2.4(2); or
C1 (ii) residential development involving a rural residential purpose and not
specified in section 2.6(2)
(c) in the Rural Living Area for an urban activity and not specified in section 2.8(2);

(d) in the Investigation Area for ~
0 an urban activity and not specitied in section 2.10(2);

C1 (i) residential development involving a rural residential purpose and not
specified in section 2.12(2); or
CO (ii) intensive animal husbandry

(ii) reconfiguring a lot-
On land in a Major Development Area in the Urban Footprint that is:
(a) not included in a structure plan; and
(b) not specified in section 3.1(2).
EJ (iii) none ofthe above
21. The application involves: (tick the applicable boxes)
C1 (i)_ anassessable material change of use for aquaculture - complete Part O; of Form 1;

C(i) assessable operational work that is the construction or raising of a waterway barrier -
complete Part Os of Form 1;

(ii) assessable operational work completely or partly within a declared fish habitat area-
complete Part O2 of Form 1;

Ci (iv) assessable operational work that is the removal, destruction or damage of a marine
plant - complete Part O2 of Form 1;

(1 (v) development assessable under the IPA, schedule 8, part 1, on land that adjoins a
declared fish habitat area;

Oo

 

DX] (vi) none of the above.

 

sae teers

Page?

Page 14

INTEGRATED PLANNING ACT 1997

Integration of land use and public
transport

For more Information refer to Guide 23, schedule
8A of the IPA, & schedule 2 of the IP Requlation.
Unless you answered “none of the above”, the
application triggers referral to QT as a
concurrence agency.

 

IDAS Assessment Checkist, Version 20, 2 April 2007 ”"
22. The application involves: (tick the applicable box/es)—

C1 (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
schedule.

0 (ii) recontiguring a tot—

[1 (a) onland that is completely or partly within a public transport corridor, and the
total number of lots increases;

[ (b)  onland that is completely or partly within a future public transport corridor or
an airport's public safety area;

[1 (6) _ on land that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m? or greater;

(1 @) _ fora residential purpose within the 25 ANEF contour for an airport,

[C(€) _ fora residential purpose resulting in 100 or more allotments.

1 (iti) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, on land that

C1 (a) _ is completely or partly within a public transport corridor or a future public
transport corridor;
(J (b) will result in work that encroaches into an airport's operational airspace.

DX] (iv) none of the above.

 

Railway safety and efficiency

For more information refer to Guide 23, schedule
8A of the JPA & schedule 2 of the IP Regulation.
Unless you answered “none of the above", the
application triggers referral to QT as a
concurrence agency.

23. The application involves: (tick the applicable box/es)— ®
(1 (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
schedule.
0 (ii) reconfiguring a lot—

CJ (a) onland that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;

(C1 (b) on land that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m? or
greater; |

C1 (c) on land that abuts rail corridor land, commercial corridor {and or future railway
land, and the total number of lots increases;

(2) (@) on land that abuts rail corridor land, commercial corridor land or future railway
land and an easement abutting the corridor or future railway land is created;

(1 (e) — ontand that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;

(1 (f) for a residential purpose resulting in 100 or more allotments.

(C1 (ili) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m%, on land that—

(1 (a) _ is completely or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;

CD (b) is completely or partly within future railway land, or a railway tunnel easement;

DJ (c) abuts rail corridor land, commercial corridor land or future railway land, and

the work is within 25m of the railway boundary.
{X] (iv) none of the above.

 

Moonie to Brisbane pipeline

For more information refer to schedule 2of the IP
Requiation.

‘Unless you answered “none of the above’, the
application triggers referral to the holder of
pipeline licence No 1 issued under the Petroleum
Act 1923, currently Santos QNT Ply Lid, for
advice,

 

24. The application involves the easement for the construction or operation of the Moonie to

Brisbane strategic pipeline, and involves: (tick the applicable box/es)—

CO (i) a material change of use assessable against the planning scheme and not associated
with recontiguring a lot, and any structure or work will be located wholly or partly in the
easement.

(1 (ii) reconfiguring a lot

CO (ili) operational work assessable against the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a tot, and the
work is located wholly or partly in the easement.

EX] (iv) none of the above.

 

Page 8

Page 15

INTEGRATED PLANNING ACT 1997

Koala habitat area

For more information, refer to Guide 26 and
schedule 2 of the IP Requiation.

Unless you answered “none of the above”, ihe
application requires referral to the Environmental
Protection Agency as a concurrence agency,

 

IDAS Assessment Checklist, Version 20, 2 April 2007

25. The application involves: (tick the applicable box/es)—

D (i) a material change of use of premises in a koala conservation area or koala
sustainability area made assessable under a planning scheme, that is not for a domestic
activity and will result in -

[J a) clearing of native vegetation over an area greater than 2500m?;

(1 (6) anew building and any reasonably associated structure with a total footprint
greater than 1000m2;

[J (©): an extension to an existing building and any reasonably associated structure if
the extension has a total footprint greater than 1000m?;

(1d) extracting gravel, rock or sand from an area greater than 5000m?;

[1 (e) excavating or filling an area greater than 5000m?;

(1 (f) additional traffic in a koala conservation area or koala sustainability area,

between 6p.m. on a day and 6a.m. on the following day.

(1 (ii) reconfiguring a lot in a koala conservation area or koala sustainability area that will
result in -—

(J) anincreased number of lots;
(1 () clearing of native vegetation over an area greater than 2500m2.

D (ili) operational work in a koala conservation area or koala sustainability area made
assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with
reconfiguring a lot mentioned in (ii) above) that will result in the clearing of native vegetation
over an area greater than 2500m?.

C1 (iv) operational workin a koala conservation area or koala sustainability area made
assessable under a planning scheme (not associated with a material change of use
mentioned in (i) or reconfiguring a lot mentioned in (ii) above) that is not for a domestic activity
and will result in -

CJ (a) clearing of native vegetation over an area greater than 2500m?;
LO (b) extracting gravel, rock or sand from an area greater than 5000m2;
(ec) excavating or filling an area greater than 5000m?.

{KI (v) none of the above.

 

Wild river area

For more information, refer to Guide 27

Ityou answered YES to 026, you must also
complete section 2 of this checklist. This will
enable you to determine if your application can
proceed in a wild river area and which referral
agency will assess your application against the
Wild Rivers Code, or if the proposed
development is “prohibited” in a wild river area.
Note: Davelopment can be ‘prohibited’ in a wild
river area because the application cannot be
accepted by the assessment manager.

26. Does the application involve development in a wild river area declared under the Wild Rivers Act
2005?

—J No
(YES

 

 

Preliminary Approval

If you answered YES to Q27, the application
triggers referrat to the Department of Loca!

Govemment, Planning, Sport and Recreation as
an advice agency.

27. Does the application involve a development for which preliminary approval is sought under
Section 3.1.6 of the integrated Planning Act 1997?

Dd Ne)
OYEs

 

 

Wetlands

Domestic activity means the construction or use
of a single residence on a fot and any reasonably
associated building or structure. Examples of a
building or structure that could be reasonably
associated with a single residence include:
caretakers residence, granny flat, building or
Structure used for a home business.

Note: Wetland is defined in the Integrated
Planning Regulation 1998.

Unless you answered “none of the above" to
Q28, the application involves referral to the

Environmental Protection Agency as an advice
agency for the application,

 

28. The application involves: (tick the applicable boxes) -
C1 (i) amaterial change of use, other than for a domestic activity, assessable against the
planning scheme that is in or within 100m of a wetland;

1 (i) reconfiguring a lot -
In or within 100m of a wetland that will result in
(1 (a) more than 10 lots being created; or
CJ (b) lots less than 5 hectares;

X] (iii) none of the above

 

Page 9

Page 16

INTEGRATED PLANNING ACT 1997
Conservation Estate

Urban purposes is defined in the Integrated
Planning Act 1997 as “purposes for which fand is
used in cities or towns, including residential,
industrial, sporting, recreation and commercial
Purposes, but not including environmental,
conservation, rural, natural or wildemess area
purposes”.

Unless you answered “none of the above” to
029, the application involves referral to the

Environmental Protection Agency as an advice
agency for the application.

 

IDAS Assessment Checklist, Version 20, 2 April 2007
29. The application involves: (tick the applicable box/es)—
OO (i) a material change of use for urban purposes that is in or within 100m of any of the
following ~
CJ (a) aprotected area, forest reserve, critical habitat or area of major interest under
the Nature Conservation Act 1992;;
C1 () a State forest or timber reserve under the Forestry Act 1959;
(©) amarine park under the Marine Parks Act 2004;
[1 (@) arecreation area under the Recreation Area Management Act 1988;
(0 ©) a world heritage area listed under the World Heritage Convention;
(J (f) Brisbane forest park under the Brisbane Forest Park Act 1977.
O (ii) reconfiguring a lot if -
(J (a) any part of the lot is situated in, or within 100m of, any of the following =
(1) — aprotected area, forest reserve, critical habitat or area of major
interest under the Nature Conservation Act 1992;
DO (i) a State forest or timber reserve under the Forestry Act 1959;
(ii) ~amarine park under the Marine Parks Act 2004;
Civ) a recreation area under the Recreation Area Management Act 1988;
[1 (¥)  aworld heritage area listed under the World Heritage Convention;
Brisbane forest park under the Brisbane Forest Park Act 1977; and
(1 (b) the reconfiguration involves more than 10 lots being created, or any lot
tesulting from the reconfiguring is less than Sha;
XI (iii) none of the above. @

 

Page 10

Page 17

CURRENT TITLE SEARCH
NATURAL RESOURCES AND WATER, QUEENSLAND
Request No: 118954588

Search Date: 09/05/2007 16:13 Title Reference:
Date Created:

Previous Title: 50283211
REGISTERED OWNER
Dealing No: 703712641 23/11/1999

BODY CORPORATE FOR HILTON PARK COMMUNITY TITLES SCHEME
27490

PO BOX 551

NOOSA HEADS QLD 4567

LAND DESCRIPTION

COMMON PROPERTY OF HILTON PARK COMMUNITY TITLES SCHEME 27490
COMMUNITY MANAGEMENT STATEMENT 27490
Local Government: NOOSA SHIRE

EASEMENTS, ENCUMBRANCES AND INTERESTS

1. Rights and interests reserved to the Crown by
Deed of Grant No. 10334173 (POR 151)

2. EASEMENT IN GROSS No 703591621 23/09/1999 at 13:20
burdening the land
COUNCIL OF THE SHIRE OF NOOSA
over
EASEMENT A ON SP110328

3. REQUEST FOR FIRST CMS No 703712632 23/11/1999 at 15:02
COMMUNITY MANAGEMENT STATEMENT 27490
MODULE:
ACCOMMODATION

ADMINISTRATIVE ADVICES - NIL
UNREGISTERED DEALINGS - NIL

CERTIFICATE OF TITLE ISSUED - No

Caution - Charges do not necessarily appear in order of priority

** End of Current Title Search **

Page 1 of 1

50288989
25/11/1999

COPYRIGHT THE STATE OF QUEENSLAND (NATURAL RESOURCES AND WATER) [2007]

Requested By: PUBLIC ACCESS ABR ONLINE

http://www.abr.com.au/live/dnr/pageview.htm?id=_NzZIWMDYOMQ%3D%3D

Page 1/1

9/05/2007

Page 18

 

Notice

Coastal development

Notice of Decision — Early Concurrence Agency Response

This notice is Issued by the Environmental Protection Agency pursuant to Section 3.3.16 and Section 3.3.18 of the
Integrated Planning Act 1997 fo advise of a decision or action.

C/- The Jetty Specialist Ce: Chief Executive Officer
Body Corporate for Hilton Park CTS27490 Noosa Council
2 Industrial Ave PO Box 141

CALOUNDRA QLD 4551 TEWANTIN QLD 4565

Your reference:
Our reference: BNE33597 Project Ref: 316992
Attantion: Steve Belt

Re: Application for a development permit for Operational Works that is prescribed tidal works for a
pontoon in the Noosa River at 82 Hilton Tce, Noosaville, Common Property §P120741.

The Environmental Protection Agency has assessed the application received on 3 September 2007 and wishes
to advise you of the following decision(s):

 

 

 

 

 

 

 

. oe EPA Decision
Activity (Refe' Tri 8 Approval Type Decision
ctivity (| rral Triggers) ppr yp i Number
Operational Works that is Development Approval | Response provided 1PCC00708307
- Prescribed tidal works » Early Concurrence subject to conditions
Agency Response that must attach to any
development approval.

 

A corresponding Concurrence Agency Response is attached for each assessable development type that
includes any stated conditions applying to an approval or gives the basis for refusing an application, Please
ratain this documentation for your records.

Please note that it is a requirement under Section 3.5.15 of the Integrated Planning Act 1997 that a copy of the
final Decision Notice (which includes the Agency's concurrence conditions) for this application issued by Noosa
Council, be forwarded to each referral agency.

In addition, the State's Native Title Work Procedures indicate that responsibility for assessment of native title
issues for an IDAS application rest with the Assessment Manager.

Review and appeal processes may be available to the appticant in regard to this decision. The applicant should
seek independent advice to confirm the procedures available.

 

 

 

 

 

Page 1 of 2 « 08/03 Version 1.4 .
Queensland Government
Environmentat Protection Agency Environmental Protection Agency
www.epa.gid.gov.au ABN 87 221 158 786 Queensland Parks and Witdilfe Service
74 chars aan j iSTy NS j : : .
7 a SENG ON SZi9G02E £0 NGIOIY NEIHINOS ¥d3 Boil £000 “190 SL

Page 19

ecoaccess

environmental ticences and permits
Notice

Notice of Decision — Early Concurrence Agency Response

 

If you require more information, please contact Alice Beer, the Project Manager, an the telephone number listed
below.

Yours sincerely

BLE | | he October 2007 |

Tara Collins Enquiries:

Operations Manager — Coastal Coastal Unit (Southern Region)
Southern Region — Environmental Operations Environmental Protection Agency
Environmental Protection Agency PO Box 15155

CITY EAST QLD 4002
Telephone: 3227 8499
Facsimile: 3221 0768

 

 

 

Page 2 of 2 + 09/03 Version 1.1 Environmental Protection Agency

Foti LEGS ON

on

LLSS2ZE £0 NOIDTY WYIHINOGS ¥d3 BZ:11 L802 “190 91

Page 20

Notice

Coastal Development

 

Notice of decision — Provision of evidence of “resource entitlement”

‘This notice Is issued by the Environmental Protection Agency pursuant to section 3.2.1. of the integrated Planning Act 1997.

Ci-The Jetty Specialist Ce: Chiet Executive Officer
Body Corporate for Hilton Park CTS27490 Noosa Counell

2 Industrial Ave PO BOX 141
CALOUNDRA QLD 4661 TEWANTIN QLO 4565

Your rafarance:
Our refarance: 8NE33597 Project Ref: 316992
Attention: Stave Belt

Re: Request for evidence of “rasource entitlement” for the prescribed tidal work application for a
pontoon system In tha Noosa River at 82 Hilton Tea, Noosaville, Common Property SP120741,
pursuant to section 3.2.1 of the Integrated Planning Act 1997 by Body Corporate for Hilton Park
CTS27490.

The Environmental Protection Agency, under the “Land Act (Tidal works and prescribed tidal work) Delegation
(No, 1) 2005”, has considered your request received on 2 Septamber 2007 and wishes to advise you of the
decision as specifled below:

 

Property Owner: | Body Corporate for Hilton Park Community Titles Scherne 274280

 

Activity: Qperatlonat works thatis Prescribed tIldai work.

 

Activity

Description: Pontoon in the Noosa River

 

Freehold, private - 82 Hilton Tce, Noosaville QLO

Description of
Subject Land: Lot: Common Property Plan: $P120741

 

 

 

Plan Drawing | jsp.gu.1920, dated 27 June 2007

| Number:

 

 

 

 

 

 

 

Page 1 of 21060116

Environmental Protection Agency 4 Queensland Government

woow.pa.gid.gov.au ABN 67 221 158 786 ARRAS Erttonmentat Protection Avancy
Queensland Parks and Wildlife Service

boca 6680 ON EL/8G025 LO NOLDIY NYIHLNOS ¥d3 Burtt LU0G

“LIQ

Page 21

ecoaccess

environmental ieances end permits
Notice
Notice of decision — Provision of evidence of resource entitlement

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Evidence of “resource entitlement” is granted. The application may proceed in
. the absence of an allocation of, or entitlement to, the resource.
Decision:
Decision Number: CSRE00352707

 

 

 

 

 

 

 

 

 

It is important to note that the provision of evidence of "resource entitlement” over State land means that the
State has no objection to the lodgement of the application for development approval, It does not:

» — imply approval of the development application, or
e affect functions the agency may exercise as the assessment manager or a referral agency, or

« authorise a right to use and occupy tand. You may need to comply with the cultural heritage duly of care
guidelines under the Aboriginal Cultural Heritage Act 2003 and the Torres Strait Islander Cultural Heritage Act
2003, refer to the guidelines on www.nrm.qgid.gov.au.

If you require more information, please contact Alice Beer, the Project Manager, on the telephone number
listed below.

Yours sincerely

 

 

 

 

 

 

 

16/10/07
je
Signature : Date
Tara Collins Enquiries:
Operations Manager - Coastal Coastal Unit (Southern Region)
Southern Region - Environmetnal Operations Environmental Protection Agency

PO Box 15155
CITY EAST QLD 4002
Telephone: (07) 3227 8499

Environmental Protection Agency
Delegate of the Chief Executive for the
Department of Natural Resources and Mines

 

 

 

 

as authorised under the “Land Act (Tidal works Facsimile: (07) 3221 0768

and prescribed tidal work} Delegation (No. 1)

2008”

Page 2 of 2+ 070117 Environmental Protection Agency

Gi £ED9 ON CULESCCE 10 NOIOIY NBIHINGS ¥a3 BtiLL £002 “190 91

Page 22

 

Response

Coastal development

Early Concurrence Agency Response - Coastal development

 

 

 

 

 

 

 

This notice is issued by the Environmental! Protection Agency pursuant to Sections 3.3.16 and 3.3.19 of the Integrated

Planning Act 1997.

EPA Reference Number:

EPA Project Number:

Approval type:
Agency Response

EPA application date:

BNE33597
316992

Development Permit - Early Concurrence

3 September 2007

 

 

 

 

 

 

 

 

 

Relevant Laws
and Policies:

Coastal Protection and Management Act 1995 and subordinate legislation

 

 

 

 

 

 

Concurrence Agency
Jurisdiction:

Item 12b in Table 2 af Schedule 2 of the integrated Planning Regulation 1998.

 

 

 

 

 

 

 

EPA Decision Number

'PCC00708307

 

 

 

 

 

 

 

 

 

 

Assessment Manager
Reference:

 

 

 

 

 

 

 

 

 

 

Appilcant:

Body Corporate for Hilton Park CTS27490

 

 

 

 

 

 

 

 

 

Activity Description:

Operational Works carried out within a coastal management district that is
prescribed tidal works; being a pontoon

 

 

 

 

 

 

 

 

 

Description of Subject
Land:

 

82 Hilton Tce, Noosaville

 

 

 

 

Common Property an SP120741

 

 

 

 

 

 

 

 

 

 

 

Noosa River

 

 

 

 

 

 

 

Response to Development Application

The concurrence agency response Is that conditions must attach to any approval for the development.

Applicable conditions for the approval or reasons for refusal are provided in this response.

 

Page 1 of 3 + 09/03

Environmental Protactlon Agency
waw,epa.qid.gov.au ABN 87 221 163 786

Gy Ef 8G AN

Version 4.1

{ Queensland Government
Environmental Protection Agency

Queenstand Parks and Wilditfe Service

C7LGS27E 20 NOI9IY NSJHLAOS ¥d3 BULL L000 100 Gt

Page 23

ry

ecoaccess

snvironmentat ficencas and permits
Response

Early Concurrence Agency Response

Reasons for the inciusion of development conditions

In accordance with Section 3.3.18(7) of the Integrated Planning Act 1997 and Section 27B of the Acts
Interpretation Act 1954, the reasons for the inclusion of development conditions are:

. The Environmental Protection Agency is recognised as a concurrence agency under the Integrated
Planning Amendment Regulation (No. 1) 4998 for coastal management, other than amenity and aesthetic
significance or value. Development conditions placed on the development approval for the application are
in accordance with section 106 of the Coastal Protection and Management Act 1995.

The Activity for which this development approval is issued is simply a restatement of the activity as prescribed in
the legislation at the time of issuing this development approval. Where there is any conflict between the above
description of the Activity for which this development approval is issued and the conditions as specified in this
development approval as to the scale, intensity or manner of carrying out of the Activity, then such conditions
prevail to the extent of the inconsistency.

This development approval authorises the Activity. It does not authorise environmental harm unless &
concurrence agency condition within this development approval explicitly authorises that harm, Where there is
no condition, or the development approval is silent on a matter, the lack of a condition or silence shall not be
construed as authorising harm.

As part of the concurrence agency response the following development conditions are to be attached to the
development approval:

Conditions:

Agency Interest: Coastal

1. The warks must be undertaken in accordance with drawing No. JSP-SJ-19290, issue B, dated 29
August 2007.

Additional information for applicants

It is a requirement of the Environmental Protection Act 1994 that if the owner or occupier of this site becomes
aware a Nolifiable Activity (as defined under Schedule 2 of the Environmental Protection Act 1994) is being
carried out on this land or that the land has been affected by a hazardous contaminant, they must, within twenty
two (22) business days after becoming aware the activity is being carried out, give notice to the Environmental
Protection Agency. A list of Notifiable Activities is provided within Schedule 2 of the Environmental Protection
Act 1994.

Yours sincerely

 

 

 

 

 

 

 

 

Page 2 of 3» 09/03 Version 1.4 Environmental Protection Agency

bots S800 ON ELL8S77E £0 NOIOIE NYININGS Vai Bott L000 L9G 91

Page 24

‘ecoaccess

anvironmentat licances end parnits
Response

Early Concurrence Agency Response

 

 

 

Signature Oaclston Date

 

 

 

Tara Collins Enquirles:

Operations Manager — Coastal Alice Beer - Coastal Unit

Southern Region — Environmental Operations Southern Region — Environmental Operations
Environmental Protection Agency . Environmental Protection Agency

PO Box 15155

CITY EAST QLD 4002
Telephone: (07) 3227 8489
Facsimite: (07) 3221 0768

 

 

 

Page 3 of 3: 09/03 Version 1.1 Environmental Protactlon Agency

NOISY AYBHINOS ¥d3 B21 L802 L90°S1

oO tt
04

om

we

cD
nn
om
i
on
us
on
oN
a
no
—

Page 25

ECELVE

14 AUG 2007 Queensland
= ae ¥% Government

Maritime Safety
Queensland

10 August 2007

Steve Belt Queensland Transport
The Jetty Specialist

2 Industrial Avenue

Caloundra Qld 4551

Dear Steve

Tidal Works — Request for comments
Proposed Pontoon — Body Corporation for Hilton Park Common Property, 82 Hilton Terrace,

Noosaville (SP 120741)

Thank you for your letter of 6 August 2007 about your Proposal to construct a pontoon at the location
mentioned above.

AS a concurrence agency, Maritime Safety Queensland has no objection to the proposal provided the
following navigation and marine safety conditions are complied with.

!. The contractor must build the pontoon according to the Jetty Specialist, Drawing No JSP-SJ-
19290, JSP-SJ-19291, Issue A, attached to your letter dated 6 August 2007,

2. No part of the structure or any ship berthed at this structure is to come closer than 1.Smetres from
the side boundaries of the allocated water Space as shown on the submitted water allocation plan
JSP-SJ-19290.

3. In the absence of a desi gnated quayline, the structure and any part thereof must not extend beyond
that of neighbouring approved structures.

4. The pontoon and all freestanding piles must be lit and clearly visible to approaching vessels. The
contractor must position all lighting so it does not cause a risk to the safe navigation of other
vessels.

5. The applicant or his agent is responsible for the removal of any existing structure above or below
the waterline, and must contain and remove any debris. Any pile that needs to be removed must
be totally extracted.

Maritime Safety Queenstand Our ref 710/01487(4) P36702 E22452 F53
Marine Operations (Brisbane) Your ref
MacArthur Avenue East Enquiries Geoff Smith
Pinkenba Queensland 4008 Telephone +61 7 3860 3538
Facsimile +61 7 3860 3571
ABN 13 200 330 520 Website www.msq.qid.gov.au

Email [email protected]

Page 26

6. The owner is to ensure that the ship berthed at this structure must maintain sufficient under keel
clearance at all stages of tide. The ship must comply with any local restrictions placed on channel
depths and draft restrictions.

7. Any ships and equipment you or your agent use must comply with the Transport Operations
(Marine Safety) Act 1994, the Transport Operations (Marine Safety) Regulation 2004 and the
Transport Operations (Marine Pollution) Act 1995.

8. Any ships using this structure must comply with the Transport Operations (Marine Safety) Act
1994 and the Transport Operations (Marine Safety) Regulation 2004.

9. Any ship moored at this pontoon must not impede the safe navigation of other ships or restrict
safe access to or from neighbouring structures.

10. Any ship moored or dry berthed at this structure must not exceed the following sizes:

Wet Berth Dry Berth
Length Overall - 6.0x2 metres N/A
Beam - 2.5 metres

11, The contractor must construct the pontoon within two years from the date of approval. If
construction is not completed, you will need additional or amended comments from the Regional
Harbour Master.

Maritime Safety Queensland does not need to be further consulted if all of the above conditions are
met.

The above conditions must be included in your application to the assessment manager.

This agency will also forward a copy of this letter to the Assessment Manager.

Yours sincerely

LE a
Captain Richard C Johnson
Regional Harbour Master (Brisbane)

Marltime Safety Queensland Page 2 of 2

Page 27

a

ETT i
Dt Ave 2 i

Our Ref 07900-05-244

Contact Paul Calver

29 August 2007

The Manager

The Jetty Specialist Pty Ltd
2 Industrial Ave
CALOUNDRA QLD 4551

Dear Sir,

Structural Design Advice

Project: Pontoon, Piles & Catwalk
Owner: Body Corp for Hilton Park

Address: 82 Hilton Terrace, Noosaville, QLD

BY: .--2scnnnnneeeeecces |

Cardno
Ullman& Nolan

Shaping the Future

Cardno Uliman & Notan

Pty Ltd

ABN 36 103 205 170

5 Gardner Close Milton Q 4064
PO Box 388 Toowong
Queensland 4066 Australia
Telephone: 07 3100 2199
Facsimile: 07 3369 9722
Intemational: +617 3100 2199
Email: [email protected]
Web: www.cardno,.com.au

Cardno Offices

We, Cardno Ullman & Nolan Pty Ltd, advise that the proposal to construct the —_ Brisbane
works described above has been checked by us. When the works are constructed Sydney

in accordance with the approved drawings and in the location shown, the

Canberra
Melbourne

proposed works are structurally adequate for the anticipated usage in this per,
location and should comply with the design and safety provisions of the — Darwin
Prescribed Tidal Work Code (Schedule 4A of the Coastal Protection and

Management Regulation 2003), based on the design criteria, and assumptions

listed below.

Basis of Design Advice

Caims
Townsville
Mackay
Rockhampton
Hervey Bay
Sunshine Coast
Toowoomba

¢ The works do not impose loads that would significantly affect Gold Coast

existing structures.

Gosford
Baulkham Hills

¢ The works do not adversely affect the stability of the bed and banks 3, .coiton

in the near vicinity of the structure.
e Structural design criteria:

400mm wind wave
300mm boat wake
Wind Classification N3

Maximum Wave Height

Papua New Guinea
Indonesia

Vietnam

China

Kenya

United Arab Emirates

Max. Current
Scour

Debris Load

Impact Loads

Max Vessel Size berthed
Relevant Codes

1.5 m/s parallel to face of pontoon

Reasonable scour effects from flood flows and
tidal flows have been considered

To AS 3962

Minor loads without some damage to structure

2 x 6.0 metres length (wet) & 4.5m beam (wet)
AS1170, AS 3962 and AS 3600, except where
varied by the Prescribed Tidal Work Code

ZAUN\PCProject\2007\Cardno\7900-05'\Sub244\WordiDesign Advice.doc

United Kingdom
United States

2005s 3 4
we Sey
a S:

NA .

’ toy Eitalince on Mann esin
ato
sees |
+ 1
%

The Atocatono

Conmuting Enginesrs: CEMTIFIED QUALITY

Aaa ASAE WENT SVSTEM

a

Page 28

2 as»
29 August 2007 Cc) ; Cardno

Uliman& Nolan

This design advice does not cover the construction or installation of the works on site. The Builder
shall confirm the adequacy of the site conditions during installation and shall advise the Engineer if
variation from details shown on the drawings occur. No detailed site investigation or studies have
been carried out by us or provided to us. The design review has been carried out on the basis of
limited enquiry only. Pile depths shown are applicable to founding in stiff clay or dense sand. There
is some additional risk of failure should the above design criteria be exceeded, or actual site
conditions be inferior to those assumed. If ground conditions other than those described above are
encountered during construction or seabed levels encountered are deeper than those shown on the
drawings, further advice should be sought.

This design advice relies on designs (eg catwalk) prepared by other consultants, but does not
warrant them.

The structure is to be built in accordance with the following referenced documentation, using good
building practice.

Referenced documentation

¢ Drawing No. JSP-SJ-19290 B
e¢ Drawing No. JSP-SJ-19291 B

Competent Person Details

Name: Paul Calver BE RPEQ 1667

Name of firm for and on behalf person is signing:
Cardno Ullman & Nolan Pty Ltd
Level |, 5 Gardner Close
MILTON QLD 4064

Postal address:

PO Box 388
TOOWONG QLD 4066

Phone: (07) 3100 2199 Fax: (07) 3369 9722
Reference: —790005-244
Signature of competent person:

for Cardno Ulman & Nolan

ZAUNPC'Project\2007:Cardno\ 7900-05 Sub2443WordDesign Advice.doc

Page 29

  

P2800

NOTE:
Existing structures shown
in approximate position only.

 

| 24444

Co

EXISTING JETTY

PROPOSED PONTOON

EXISTING TIMBER "7" *
MOORING PILES.

EXISTING °JETTY

COMMON PROPERTY

   

TRADING AS
THE

ACN 010833119

    

29/8/07 PILE MOVED TO INSHORE END OF PONTOON {ENG
AMENDMENT

  

 

 

| ___t

SP120741
SITE PLAN &
WATER ALLOCATION
| SCALE 1:500
{ wane eee 99327
259°0

THE MARINA SPECIALIST

jevry§s_

 
  
   
 
     
   
 

EXISTING JETTY

 

68271
169°0

  

2 INDUSTRIAL AVE
CALOUNDRA
QLD. AUSTRALIA 455%

PHONE (07)5492 5925
FAX (07) 5492 6699

     

 

  
  
 

P.0. Box 388, Toowong 4068.

 

  

}
Cardno ACN: 051 074 992
Carina (Qid) Ply Lia
Level 4, 5 Gardner Close, Milton 4084

BERTHING:
Maximum wet vessel length - 6.0m X 2
Maximum wet vessel beam ~ 2.5m

3000 3150 83kNm

R.C INSITU PILES

PROPOSED PONTOON

   
  
  

 

 

 

 

°

3°

3°

10
ALUMINIUM STEPS FIXED
TO PONTOON DECK
HANDRAILS TO OPEN SIDES

2004

EXISTING TIMBER JETTY

 
 
     

LAYOUT PLAN
SCALE 1:50

  

 

 
 

 

 

HIS DRAWING IS SUBJECT TO COPYRIGHT AND CANNOT 8€ REPRODUCED _IN PART OR FULL OR PASSED ON TO A THIRD PARTY WITHOUT THE WRITTEN PERMISSION OF THE JETTY SPECIALIST

 

CUENT: BODY CORP FOR HILTON PARK CTS 27490 | TITLE:
COMMON PROPERTY SP120741
82 HILTON TCE, NOOSAVILLE
PROJECT: PROPOSED PONTOON ADDITION

TO EXISTING JETTY

SITE PLAN, LAYOUT
& WATER ALLOCATION

SCALE: DATE:
1:50 1:500 27/6/07

DRAWN DIMENSIONS
MA S MILLIMETRES

  

   

 

 

 

Ph (07) 3369 9822
‘ax (07) 3369 9722
Emoil:[email protected]|

   

    
 
 

DRAWING NO:
JSP-SJ- 19290

     
 

      

 
    
     

  

 

are a9)

   
  
   

    
   
 

 

Page 30

          
 

      
  

 
 
 
  
 

 

  
    
 

    
 
  

  

 

 

 

 

 
 
      
 
 
  
 

32500 NOTE: BERTHING: a
Existing structures shown Maximum wet vessel length - 6.0m X 2 Z|
in approximate position only, Maximum wet vessel beam - 2.5m &
32500 z
#24441 27853 te
| —___ | 3000 —__—____- 3150 83kNm >
EXISTING JETTY R.C INSITU PILES a
. =
oO
PROPOSED PONTOON a
e =]
z
EXISTING TIMBER" * 8 wl
MOORING PILES. Q eI
EXISTING ° JETTY 7s 3
pas] JETTY 5
f PROPOSED PONTOON 5
1 a
‘ pa b =
~ NS . 8 a
“aN ' 1 <
° | 1 349°0 i ; e
| I =|
| | SI
' COMMON PROPERTY ' 8
SP120741 2
ALUMINIUM STEPS FIXED os
' ' TO PONTOON DECK 4
{ HANDRAILS TO OPEN SIDES 3
| I a
S
1 t
c
| ! 4 z
Bio r 8B
Bl ' 200 OQ S|
air 2
"t aie 2
| a2 4
i ' EXISTING TIMBER JETTY 3
@ | 8
Z
| SITE PLAN & LAYOUT PLAN =
WATER ALLOCATION | SCALE 1:50 e|
i SCALE 1:500 \ gs
5
i Le oF 2
1 THIS. PLAN foR (nN FORMATION 5
EN 4 HAS Been CEFIACEDS I
| | :
7 | by ssueé 4 S
259° . [ . 2

  
   
  
  
  
  

  
 

   

   

      
 
 

  
  
  

     

THE MARINA SPECIALIST d CUENT: BODY CORP FOR HILTON PARK CTS 27490] TLE: SITE PLAN, LAYOUT
TRADING AS ACN 010633119 2 INDUSTRIAL AVE Caerdne i ccx. 05: 07 992 COMMON PROPERTY SP120741 & WATER ALLOCATION
THE CALOUNDRA Cardno {Qi} Pry iid

   

  
   
 

Ph (07) 3369 9822
Level 1, 5 Gardner Close, Milton 4064 Fox (07) 3369 9722
P.0. Box 388, Toowong 4066. Email: [email protected]

      
     

\REM_DATE [AMENDMENT REQD/

82 HILTON TCE, NOOSAVILLE SCALE:
PROJECT: PROPOSED PONTOON ADDITION — [1:90 _1:500 27/6/07_| JSP-SJ-19290
, WN

MA

QLD. AUSTRALIA 455%
Flap ep PHONE One ae DRAY DIMENSIONS ISSUE =
FAX 07} 5492 6699
Jen peoteeres TO EXISTING JETTY Pim [ie | ives

 

   

Page 31

 

 
 

 

EXISTING TIMBER JETTY

  

APPROX, JETTY R.L_ 1.1m

ee

 

 

     
 

TRADING AS
THE

THE MARINA SPECIALIST

ACN 010633119

QLD. AUSTRALIA 4851
Peay PHONE (07)5492 5925
ds Fa (07) 5482 6689
Ss P E—€E cCclaAkLtI Ss T

 

 

 

 

 

 

 
 
  

 

Cardno

Cardno (Qtd) Pry Ud

2 INDUSTRIAL AVE
CALOUNDRA

    

Level 1, 5 Gardner Close, Mitten 4064
P.0, Box 388, Toowong 4066.

ACN: 051 074 992

Ph (07) 3369 9822
Fox (07) 3369 9722

 

  

Emoil:[email protected]!

OATE:
7 |204?

PONTOON SHOWN AT L.A.T

  
  

  

  
  

  

 

ALUMINIUM STAIRS FIXED
TO PONTOON DECK

TOP OF PILE R.L 3.6m

> ~HAT R.L 0.51m
- —MHWS R.L 0.26m

- LEVEL DATUM AHD R.L. 0.0
~ ~MLWS R.L. -0.17m
“ “LAT RL. -0.34m

   

315% 83kNm
R.C INSITU PILES

3500 MIN. EMBEDMENT
INTO DENSE SAND
OR STIFF CLAY

 

 

HIS DRAWING IS SUBJECT TO COPYRIGHT AND CANNOT BE REPRODUCED IN PART OR FULL OR PASSED ON TO A THIRD PARTY WITHOUT THE WRITTEN PERMISSION OF _THE JETTY SPECIALIST

   

 

   

CUENT: BODY CORP FOR HILTON PARK CTS 27490) TILE:

COMMON PROPERTY SP120741
82_HILTON TCE, NOOSAVILLE AF aE DRANG:
28/6/07 _| JSP-SJ-19291
DRAWN Ee DIMENSIONS ISSUE
un RS" Pies [" 8 __[A3) |

ELEVATION

 
 
  

  

PROJECT: PROPOSED PONTOON ADDITION
TO EXISTING JETTY

  

  

 

 

Page 32

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

         

 

 

XITSH 9a

 

 

 

 

 

 

              

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

  

 

? /- Te ‘g9p)- q
(ev|_9 ans! eosin olf nig (; 7 Wer mer VF FH. 6609 Z6¥S (40) Xv VEN SOLER ie a 2)
Sr0-OS-dSt | 66/¢/0z zt ONIMVEC GEVONVIS ciosroye | mar eReQeuADS Tou “troy foonool “sen 3a *gg} | S265 Z6¥G(40) INOHA GHGGY lid SIE WANES) 90/4702 3
‘ON_ONIMVEGI ‘ald ‘aWOS 2 VIAYSOON tee sore to) YO0p UOER “Beoty JURION ¢ “| eT ISSh ¥Mvlisny “aD
NOILONUSNOO Fd PISNI 313HONOD PL Mal 7B ALI pews) we 110 190 HY gg upaeg cM BV WRN BLUGESOLO NOY sv ouaval
\__ GAOYOANIRY UBGWVIG OOF PF SLE sun | awd Male DOF S367 haog sn3n9 LSITVIOddS VNINVA FHL
WNAOE | WNACR WNL WN9P
Hid NOOINOd #00 Td NOOLNOd 4#S1¢ F1ld NOOINOd @S1¢ Fld YOIA BSL
HEN said 40 wo. HA S3Md 40 WoLina CPIA Sud 40 WoL. DEAK S3d 40 Wolo
[ WOd4 O0€ NIHLIM OL --H| S-WOY4 OO€ NIHLIM OL f WONJ OO€ NIHLIA OL (ie-t) S-WOA4 OO€ NIHLIA OL
r QN3LX3 OL ONIONO4NIAY H QN3LX3 O1 ONISYOANISA be QN3.LX3 OL ONIOYO4ANIZY er} GN3Lxa OL ONIDAOANISS @
\ +H be~ net
f tt I cid
- t be mt
: H a oe
i In a
f KF 40 3Sva OL UK 31d JO 3Svad OL bop N Fld 40 3sva Od Seth aud jo 3Sva OL
r 3L3YSONOI SS¥W #4] \—3L3YONO9 SS¥W - 3L3YyONO9 SSW ft] N—JL3YaONO9 SSW
[ ZN 3dva9 FH}  2€N 3qvad i 2€N 3avao ricll = @€N 3aqvad
i bt Len La-tvt :
L H i. Cth Me
[ bt Le Rh ON y bret
r jag LON + MAE aM Er
yeu IN AGAD9. woe pele a ed
PLUK dol 40 “2 OL ait ae
YGADI wor ett) save 02N / € 3 Ph} ra) \_ gana oadn
\ aGL 40 ve OL ree) HLONST WIN PATI) \_aawagd aAdn fi S3WNH @STE @
SYV€ OCN / € 8 itl Sava 0e@N / 9 bend SAWNH STE roi
HLONST W1N4 Poi] be} ea
SUVd 02N / 9 a - BN HOLId 69 a
hei] \_agWaO4 Addn PS Hold $9 @ it] ME TSH 98
ae Wn T | [oat
PS SaWaO DAdN rei SANNH asTe { Lo
SAWNH #00 tor N rich ¥3Aq9 Wuidp
EP Hold $9 @ A a3ao stot mil] Saga 9IN. 79
a XTTSH 9a | HLONST TIN
_HOLId S9 a Savd O2N / 9

 

 

Page 33

 

RECTANGULAR PONTOONS

p= 8000 TO 180001
So Sogo 00

  
   

   

 
 
  

3509-4501

EQUAL

PONTOON WIDTH
35m — 4.5m

PONTOON
LENGTH

 

 

 

 

 

 

 

 

 

 

 

 

MAY BE USED FOR PONTOON SIDES ONLY
REQUIRING FENDERING TO BE ATTACHED

   
  

TRADING AS

U SHAPED PONTOON

NOTE:
BEAMS NOT REQUIRED FOR PONTOONS
LESS THAN 8000 IN LENGTH

3506

STANDARD PONTOON SHAPES & BEAM CONFIGURATIONS
NOT TO SCALE

so SEE SITE & LAYOUT PLAN FOR RELEVANT PILING POSITIONS, PONTOON DESIGN & ORIENTATION

{ SEE PILE BRACKET DRAWING FOR PILE BRACKET TO PONTOON CONNECTION DETAILS
oOo
wD

se 7

u?. 8
@

——_t tO

: +

L SHAPED PONTOON

T
soo-fp- 0 Oo 150001 500 soo{ p= 0008 TO 1500

   
  
 

100 THICK CUNCRETE DECK
1 LAYER G445A MESH 40mm
COVER TO EXPOSED SURFACES

   
 
 

2-Nté BARS IN TOP
OF ALL BEAMS
UNDER DECK MESH

  

 

MAX,

   

SCALE 1:20

dyes
RG fe

JSP-208 PERIMETER FRAME

  
 
  
 
 
 
  
 

 

Le 380 STANDARD FREE BOARD
FOR FLAT DECK PONTDONS

WATER LINE

 

25mm THICKENING ALONG ALL
SIDES WITH 200 WIDE SL8
MESH STRIP UNDER ANCHOR. WEB

670 STANDARD OVERALL
FOR FLAT DECK PONTOONS

 

 

TYPICAL 304 X 120 TRANSVERSE END
EAM TO BE INCLUDED IN ALL FLOAT
BOAT PONTOONS

LE

ISP-208 pise
FOR PONTOON SIDES WHERE ANY PILE
BRACKETS, ACCESSORIES AND OR PONTOON
CONNECTIONS ARE REQUIRED

 
 

 

NOTES: .

All concrete work to comply with AS3600. All concrete to be 50 MPa.
Cover to reinforcement to exposed surfaces to be 40mm minimum.
Reinforcing to be minimum of Smm bars ot 100mm centres in each
direction U.N.O.

   
 

All aluminium work to comply with AS1664. All welds to be 5mm CFW.
All butt welds to be full penetration. Aluminium to be grade 6351-T5.
Surface of aluminium in contact with concrete to be coated with zinc
cromate primer or equivalent.

Fabrication tolerance + Smm.

All bolts ond fittings to be 304 or 316 stoinless steel.

 

178

cn
| PLAN VIEW

ISP~207

L

 

740 STANDARD OVERALL FLOAT A BOAT RAMP OPTION
S@ STANDARD FREEBOARD SCALE 1:50

Lo

 
 
  

 
 
  

150
RAMP DEPTH

 

THE MARINA SPECIALIST

ACN 010633119 2 INDUSTRIAL AVE
CALOUNDRA
QLD. AUSTRALIA 4551

PHONE (07)5492 5925
FAX (07) 5492 6699

Cardne
Cardno (Q!e) Pty Ld

Level 1, 5 Gardner Close, Mitton 4064
P.0. Box 388 Toowong 4066.

      
     
       
 

 

 

 

     

   

ACN: 051 074 992

Ph (07) 3369 9822
Fox (07) 3369 9722
Emait:[email protected]

DATE:
(2-10-06

 

Flotation to comprise of grade SL expanded polystyrene foam with
approved protective coating. The approved protective coating for the
pontoon will form an impervious barrier to water & morine organisms;
and is suitable for the marine environment.

Pontoons with Float-A-Boat ramps to have dry stored boot fully winched
onto pontoon with 1m clear at rear.

This pontoon facility has been designed to comply with all relevant
Australian Standards. The pontoon will be stoble at all times. The
pontoon has been designed so that when the specified tive load is
distributed over half the width of the pontoon and over the walkway;
there is not less than 75mm of reserve freeboard; the bottom corner of ©
the pontoon does not emerge from the water, ond the angle of tilt will -
not exceed 15’. :

 

MAXIMUM DESIGN LIVE DECK LOADING: 3.0 kPa.

PONTOONS SUITABLE FOR PROTECTED SITES ONLY.
MAXIMUM WAVE HEIGHT: 300mm.

BOAT WAKE: 500mm,

MAXIMUM WIND VELOCITY: 41 m/s.

MME: ~=PONTOON CONSTRUCTION DETAILS

SCALE: DATE: DRAWING NO:
AS SHOWN 31/8/05 _| JSP-SD-100
DRAWN GCKED [DIMENSONS ISSUE

 

THIS DRAWING 1S SUBJECT

   
  

   

CUENT: Bory Conp 22 HICTYN PARK
Comnod Ptoriery 82 HC TOs Te.

No gga vine

PROJECT: STANDARD DRAWING

  
   
 

    
  
 

  
 

 

 

Page 34

 

 

xm LAND USE SECTION FEES
aut MENLOOSEA

RECEIPT TYPE

SALE OF DOCUMENTS
Superseded Planning Scheme’ Documentation §20
Copy of Permit/Approval Letter 110
The Noosa Pian Documentation 111

APPLICATION FEES =
Material Change of Use ¢GadeAmpact

Rorstent , 521
consistent 521

Assessment under Superseded Planning Scheme 521

Modification to a Development Permit . 521

Extension of a Currency Period : 521

Operational Works - Landscaping 521

. Bldg Work assessable against the Planning Scheme 521

PRE LODGEMENT REVIEW

Half Hour 522

One Hour 522
ADVERTISING

Purchase Advertised Applications 523
JETTIES

Jetty Application Fee Zo7sS 524

Jetty Bond Bom Te 51

Oe WOE (Category 4)

BONDS

Performance Bond 51

(Category 9)

SIGNS .

Registration Fee , : . 222
se FEE ,

Search of Land Use Section file 112

Liquor Licensing Request 113 |

 

 

TOTAL $ -2=75°

NAME: Me mire Spec tink f(t

 

 

 

ADDRESS: Z ThRietunhvct Are
FILENO: —§ ot} 2.93 DATE: 2 B/te [oz
RECEIPT NO: J 2, ffp Signature of TP Officer: fs dunes

 

AUTHORITY NO: we U \

(4/2007 (2.4 3

Used in these records

About this file

File size
2.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2173 - Operational Works - Prescribed Tidal Works Transport Type 5 - Pontoon [As Published].pdf · 2.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.