Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

07/2173 - Operational Works - Prescribed Tidal Works Transport Type 5 - Pontoon [As Published] · 142007.2173

of 34

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 (DAS Assessment Checklist, Version 20, 2 April 2007 ”
Operational work that is tidal work or |9. The application involves operational work that is: ( tick the applicable box/es)

 

workin coastal management district (1 (i) tidal work*® as defined under the Coastal Protection and Management Act 1995 (the
more information about prescribed tidal work in Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; oF

tocal govemment tidal areas refer to Guide 24, (XJ (ii) tidal work that is prescribed tidal work'' other than in a canal’? -complete Part P of Form 1; oF
Unless you answered “none of the above” to 09, ey : se .

the pptcation requires meseesment by the LD (iii) carried out within a coastal management district under the Coastal Act and for - complete
Environmental Protection Agency {EPA). Part M of Form 1 if any box/es (a) to (i) below are ticked,

tran agency oer than EPA the assessment (J (a) constructing or installing works in a watercourse between MHWS and HAT (ie.
manager for the application, isa —_ .
concurrence agency for the application in other than those works in tidal water) where the development has been determined not
relation to this matter, to be assessable against the Water Act 2000 ;

Loca! goverment is the assessment manager (J (b) constructing a canal’? intended to be connected to tidal waters:

for all prescribed tidal work. . eee
° ° (©) constructing an artificial waterway;

LD @) reclaiming land under tidal water;
[1 (e) disposing of dredge spoil or other solid waste material in tidal water;
C2 (f) _ interfering with quarry material on State coastal land above high-water mark;

[J (g) draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;

(1 (h) removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;

(1 (i)) constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or @

C1 (iv) none of the above.

 

 

Operational work below high water | 10. The application involves operational work that is: ( tick the applicable box/es)

mark ‘ 3 : .
For more information reter to Guide 18. For C (i) tidal work's as defined under the Coastal Protection and Management Act 1995 (the

more information about prescribed tidal work in Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or

focal goverment tidal areas refer to Guide 24. (ii) tidal work that is prescribed tidal work'+ - complete Part P of Form 1; 0r

Unless you answered “none of the above” to Fa : tyes ee

Q10, the application triggers referral to CD (iii) carried out within a coastal management district'S under the Coastal Act and for -

Gig) as a concurrence agency. (2) {a) disposing of dredge spoil or other solid waste material in tidal water - complete Part
Local government is the assessment manager Mot Form " ,

for all prescribed tidal work. LD (b) reclaiming land under tidal water - complete Part M of Form 1; of

C1 (c) constructing a canal’, if the canal is associated with reconfiguring a lot - completa
Part M of Form 1;

CD (iv) none of the above.

 

Coastal management 11. The application involves: (tick the applicable box/es)
For more intormation refer to Guide 18. C1 (i) a material change of use assessable under a planning scheme involving operational
Unless you answered “none of the above” to i i istrict!5
It, the application requires assessment by the ; work carried out completely or partly in a coastal management district
Environmental Protection Agency (EPA). QO (i) a material change of use assessable under a planning scheme Involving building @
It an agency other than EPA is the assessment work, carried out completely or partly in a coastal management cistrict that is ~

lication, EPA i , . .
concumenoe agerey for he apicaten in « the construction of a new premises with a GFA'® of at least 1000m2
relation to this matter. « the enlargement of the GFA of existing premises by more than 1000m?

D1 (ili) reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district

Di (iv) reconfiguring a lot'” assessable under schedule 8 of the IPA and in connection with
the construction of a canal!? - complete Part M of Form 1

EX (v)_ none of the above

 

 

10 Tidal work is defined in sch 10 of the IPA.

11 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or paitly within a local government tidal area.

12 Canal means canal as defined under the Coastal Protection and Management Act 1995

13 Tidal work is defined in sch 10 of the IPA.

“14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or pasily within a local government tidal area.

15 Coastal management district is defined in sch'10 of the IRA and means a coastal management district under the Coastaf Protection and Management Act 1995, other than an area declared as a
coastal management district under section 47(2) of that Act.

16 GFA is defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to calculated GFA, go to the planning scheme agains! which the application is being assessed.

17 Under $117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be
accompanied by the application for the operational works to construct the arlificial waterway.

Page 4

Used in these records

About this file

File size
2.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2173 - Operational Works - Prescribed Tidal Works Transport Type 5 - Pontoon [As Published].pdf · 2.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.