07/2173 - Operational Works - Prescribed Tidal Works Transport Type 5 - Pontoon [As Published] · 142007.2173
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 20, 2 April 2007
Contaminated land 17. The application involves: (tick the applicable box/es)
Applications involving material change of use 7 ji, i j _
and! or revontiguring a tt may tigger this OW reconfiguring alot for which all of part of the premises are
referral. (a) premises mentioned in the IPA, schedule 8, part 1, table 2 -
For more information refer to Guide 5. « item 5, including the exemption otherwise provided for by paragraph (d);
Unless you answered “none of the above” to « item 6, including the exemption otherwise provided for by paragraph (@); or
Q17, the application requires assessment by the ei i i i i it ini ivi
Environmental Protection Agenty (EPA). Han en 77, including the exemption otherwise provided for a mining activity or petroleum
agency other than EPA is the assessment a vity; or . . .
manager for the application, EPA will be a (b) in an area for which an area management advice has been given for unexploded
concurrence agency for the application in -
relation to this matter ; ordnance - complete Part N of Form 1
{J (ii) a material change of use -
(a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
{b) assessable against the planning scheme and if all or part of the premises is in an area
for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 1
{1 (iii) none of the above
Electricity infrastructure 18. The application involves: (tick the applicable box/es)
For more information refer to schedule 2of the IP
Regulation.
Unless you answered "none of the above” to
Q18, the application triggers referral to the
agency to which the easement is granted in
favour of as advice agency.
(1 (i) reconfiguring a lot where any part of the lot is ~
subject to an easement in favour of a distribution entity or transmission entity under the
Electricity Act 1994 and the easement is for a transmission grid or supply network under
that Act; or
« situated within 100m of a substation site; @
a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if -
* any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the easement is for a transmission
grid or supply network under that Act; and
any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement;
a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if any part of the premises is situated within 100m of a substation
site;
operational work that is filling or excavation assessable against the planning scheme,
not associated with reconfiguring a lot, if -
any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
the easement;
the work is located wholly or partly within 10m of a substation site;
none of the above.
O tii)
D iil
OW)
Ww)
Land designated for community
infrastructure
Applications involving development on land
designated for community infrastructure may
trigger this referral.
For more information refer to schedule 2 of the
IP Regulation.
if you answered “YES" to Q19, the application
requires assessment by the chief executive of
the department administering the Act authorising
the development for the designated purpose.
tf an agency other than the designator is the
assessment manager for the application, the
designating agency will be a concurrence
agency for the application in relation to this
mattes.
Does the application involve development assessable against the planning scheme and on land
designated for community infrastructure? @
(i) intended to be supplied by a public sector entity; and
(ii) on ‘and not owned by or on behalf of the State; and
(iii) other than development -
(a) for the designated purpose; or
(b) carried out by, or on behalf of, the designator.
INO
Yes
ars
Page 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2173 - Operational Works - Prescribed Tidal Works Transport Type 5 - Pontoon [As Published]Related documentApplication case desk ↗