INTEGRATED PLANNING ACT 1997 (IPA)
Part P, Version 1.1, 27 March 2006
Completion of all applicable questions on Part P is mandatory for all applications involving assessment against the Prescribed Tidal Work Code contained in the
Coastal Protection and Management Regulation 2003 tor operational work that is prescribed tidal work within a local govemment tidal area.
For further information refer to Guide 24 Prescribed tidal work, and the Guideline for making an application for prescribed tidal work on the EPA Website,
Nature of the application
Tidal work is defined in the schedule to the
Coastal Protection and Management Act 1995.
Alltidal works, completely or partly within a local
govemment tidal area, other than tidal works
mentioned below, are prescribed tidal work.
The fotfowing tidal works are not prescribed tidal
rk:
a) tidal works for a new or existing structure that
is used for the operation of any of the
fotlowing—
(1) a port authority;
(ii) a public marine facility constructed by or
for Queensland Transport or a port
authority;
b) tidal works for any of the following—
{i) creating or changing the configuration or
characteristics of a navigational channel;
{ii) an inlet or outlet for aquaculture caried
out on land if the aquaculture is made
selt-assessable under the local
govemment's planning scheme.
Part M should be completed for applications for
tidal work that is not prescribed tidal work.
‘The fee for works may depend on the type of
work. £.g. For works other than a private
purpose, EPA's concurrence fee is calculated in
terms of the value of the completed works,
1.
2.
This application is for operational work for the following prescribed tidal work, carried out
completely or partly within a focal government tidal area: (tick one (1) or more applicable boxes)
(1 () __ jetty, pier or wharf;
D i) boat ramp or slipway;
C1 (ii) mooring pile;
Cl (iv) deck or boardwalk;
I) (v) pontoon;
CJ (i) revetment, sea wail or retaining wall;
(1 Wil) other (e.g. abutment, basin, bridge, breakwater, dam, dock, dockyard, embankment, groyne, pipeline or
other underground service etc) ~ provide details below,
This application is for prescribed tidal work, that is for:
(i) __ private purposes; or
(1 (i) _ other than private purposes.
Estimated value of the completed works:
[ $22,862.00 |
Local government tidal area
Tidal area for a local govemment Is defined in
schedule 10 of the integrated Planning Act 1997
(IPA).
Access to adjoining properties
Evidence may include the support of the
adjoining property owner for the proposal and a
water allocation area illustrated on the plans.
Refer to the Guideline for preparing a water
allocation area on the EPA Website,
The local government tidal area in which the works are proposed is: (e.g. Caims, Gold Coast, Mackay)
[ NOOSA COUNCIL
Is the application supported by evidence that the proposed works will not prejudice the access
tights of adjoining property owners?
CI No
YES - attach evidence
Navigational safety
Maritime Safety Queensland (MSQ) and the
assessment manager require information on
neighbouring structures to ensure the proposal
does not impact on navigational safety or the
common law right of accass to and from abutting
waterfront properties. Applications may not be
approved if they interfere with access rights of
abutting waterfront properties or with navigation
in the waterway.
Is the application within a cul-de-sac or a bend in a waterway or other location where the side
boundaries of the lot connected to the work and neighbouring lots are not at right angles to the
waterway?
KINO
oO YES - attach photographs of, or approval information for constructed or unconstructed neighbouring structures
Maritime Safety Queensland (MSQ)
response
A pre-application concurrence response from
MSQ can only be provided on applicant request.
Note: A pre-application concurrence agency
response is of no effect if’ah’application thiggérs”
referral coordination.
Is the application supported by a pre-application concurrence agency response from the chief
executive under the Transport Operations (Maritime Safety) Act 1994?
CNno
w& YES - attach response
treme . = stent, eek
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2173 - Operational Works - Prescribed Tidal Works Transport Type 5 - Pontoon [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.