                                                                                Officer:            Georgina Schramm
                                                                                Direct Telephone:   07 5329 6569
                                                                                Our Reference:      MCU17/0559.04
                                                                                Your Reference:     229668

               31 January 2024


               MCDR Guerreiro & JEG Guerreiro
               C/- Cadcon Surveying & Town Planning
               PO Box 5774
               MAROOCHYDORE BC QLD 4558
               [email protected]



               Dear Sir/Madam,
                                            Decision Notice – Minor Change
                                                         Planning Act 2016

               I refer to your application received on 5 October 2023, requesting a minor change to an existing
               development approval. Council decided your requested changes.
               Details of the decision are as follows:
               1.      APPLICATION DETAILS

                   Application No:              MCU17/0559.04

                   Street address:              16 Grant Street, Noosa Heads

                   Real property description:   Lot 87 RP 92518

                   Planning Scheme:             Noosa Plan 2020 (25 September 2020)

               2.      DECISION DETAILS

               The following type of approval was issued on 1 August 2018.
               •       Development Permit for Material Change of Use - Multiple Housing - Type 2 Duplex
               In relation to the request to make a minor change to the existing approval, Council on 31 January
               2024, decided to approve the requested changes. The changes are detailed below.
               A.      Approve the change;
               B.      Amend conditions 2 & 5;
               C.      Delete condition 4; and
               D.      Include additional conditions 31 and 32.
               3.      CURRENCY PERIOD OF APPROVAL

               The currency period for this development approval is 6 years starting the day that the original
               development approval MCU17/0559 took effect.




               ABN 97.969.214.121                                                             PO Box 141
               noosa.qld.gov.au                                                        Tewantin QLD 4565
               [email protected]                                                        07 5329 6500
                                                                                                         Page 1 of 8
Document Set ID: 22787295
Version: 4, Version Date: 31/01/2024
Log in to download the original file

Decision Notice - Minor Change - MCU17 0559 04 [As Published].pdf · 162 KB (small file)

Full text of the other 7 pages

Page 2

               4.     ASSESSMENT MANAGER CONDITIONS

               When Conditions must be Complied With
               1.     Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to
                      the use commencing, and then compliance maintained at all times while the use continues.
                      Approved Plans
               2.     Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are listed in the following table unless
                      otherwise amended by these conditions.

                        Plan No.             Rev.   Plan/Document Name                              Date

                        001                  18     Site Plan by H4                                 10.09.2019

                        002                  18     Site Cover by H4                                10.09.2019

                        100                  22     Lower Floor Plan by H4                          10.01.2024

                        101                  22     First Floor Plan by H4                          10.01.2024

                        200                  18     Roof Water Discharge Plan by H4                 10.09.2019

                        300                  22     Elevations by H4                                10.01.2024

                        301                  22     Elevations by H4                                10.01.2024

                        302                  22     Front Entry Elevation prepared by H4 Plan 10.01.2024
                                                    + Design + Build

                        500                  22     3D Perspectives – Unit 16 prepared by H4 10.01.2024
                                                    Plan + Design + Build

                        501                  22     3D Perspectives – Unit 16 prepared by H4 10.01.2024
                                                    Plan + Design + Build

                        900                  22     Details – Unit 16 Planter Box prepared by 10.01.2024
                                                    H4 Plan + Design + Build

                        901                  22     Details – Unit 16 Planter Box prepared by 10.01.2024
                                                    H4 Plan + Design + Build

                      Nature and Extent of Approved Use
               3.     The Decision Notice approves 2 x 2-bedroom dwelling units.
               4.     Deleted.
               5.     The landscape planter boxes, as detailed on the approved plans, must be provided to the
                      area adjacent to the rumpus room and bedroom 2 of both dwelling units (northern and
                      southern elevations). The planter boxes must not be removed.
                      Building Height
               6.     The maximum height of the development must not exceed 8.0 metres above the finished
                      ground level and the natural ground level, except for the front face of the building which must
                      not exceed 8.20 metres.
               7.     Certification must be submitted to Council from a Licensed Surveyor which certifies that the
                      building does not exceed the maximum height requirement of this Decision Notice.


                                                                                                        Page 2 of 8
Document Set ID: 22787295
Version: 4, Version Date: 31/01/2024

Page 3

                      Performance Bond
               8.     Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must
                      be submitted to Council, to secure performance of all conditions of this approval, prior to the
                      issue of a Development Permit for Operational Works prior to pre-start meeting. The cash
                      bond or trading bank guarantee will be returned on performance of the conditions of approval
                      less any costs incurred by Council in respect of enforcing performance of this permit. Council
                      reserves the right to call upon the bond or guaranteed sum to effect compliance with
                      conditions.
                      Water & Sewer Connections
               9.     An underground connection to reticulated water and sewerage must be provided to the
                      development site in accordance with the standards and requirements of Northern SEQ
                      Distributor–Retailer Authority (Unitywater).
               10.    A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority (Unitywater)
                      must be submitted to Council that certifies an underground connection to reticulated water
                      and sewerage has been provided to the development site.
                      Building Appearance
               11.    All air conditioning units or other mechanical equipment must be located at ground level, or
                      otherwise fully enclosed or screened such that they are not visible from the street frontages
                      nor adjoining properties.
               12.    All deck and balcony areas above ground floor must not be enclosed by permanent fixtures
                      such as shutters, louvres, glass panelling or the like.
                      Landscaping
               13.    The development site must be landscaped. The works must be undertaken in accordance
                      with an Operational Works approval and Planning Scheme Policy PSP 3 – Landscaping
                      Plants and Guidelines and must include in particular:
                      a.      A landscape area of at least 192m2, of which a minimum of 60% of this is soft
                              landscaping.
                      b.      Landscaping to northern and southern side boundaries which must include screening
                              vegetation suitable to provide a visual relief to the bulk of the proposed building.
                      c.      Landscaping to the front boundary which must include tree and shrubs species to
                              provide a visual relief to the bulk of the proposed building.
                      d.      Vegetated screening of any electrical transformers, bin storage areas and the like from
                              the road frontage
                      e.      Provision of 1 street tree within the road reserve for every 8 metres of road frontage
                              suitable for planting under powerlines.
                      f.      Details of all external landscaping works including provision of turf, soil and street trees.
                      g.      Details of all proposed garden beds, soils remediation, mulch type and maintenance
                              regimes.
                      h.      Details of all understory shrub and ground cover plantings.
               14.    All landscape works must be established and maintained in accordance with the approved
                      design for the life of the development, and in a manner that ensures healthy, sustained and
                      vigorous plant growth. All plant material must be allowed to grow to full form and be
                      refurbished when its life expectancy is reached.
                      Fencing and Walls
               15.    Any street fencing must be set back an average of 1 metre and articulated to provide visual
                      interest by stepping the wall at maximum 5 metre intervals.
               16.    Any fencing on the front boundary must either:


                                                                                                             Page 3 of 8
Document Set ID: 22787295
Version: 4, Version Date: 31/01/2024

Page 4

                      a.      not exceed a maximum height of 1.2m
                      b.      be of open construction.
               17.    The area of land between the fence and the front property boundary must be densely
                      landscaped to screen any fencing from the street.
                      Clothes Drying Areas
               18.    Each dwelling unit must be provided with access to an outdoor clothes line which is screened
                      from public view.
                      Community Management Statement
               19.    Any proposed Community Management Statement required for the development pursuant to
                      the Body Corporate and Community Management Act 1997 must be submitted to Council for
                      endorsement at the same time as submission of the Building Format Plan (or similar) to
                      Council for compliance assessment.
                      External Works
               20.    Grant Street must be upgraded for the length of its frontage to the subject site. The works
                      must be undertaken in accordance with an Operational Works approval and must include in
                      particular:
                      a.      construction of a pedestrian footpath in accordance with the conditions of this Decision
                              Notice
                      b.      removal of the existing property access and reinstatement of the kerb, footpath and
                              verge area to match the balance of the site frontage, including the provision of topsoil
                              and turf where the existing verge is grassed
                      Site Access and Driveways
               21.    A sealed access driveway must be provided from Grant Street to all parking and manoeuvring
                      areas of the development. The works must be undertaken in accordance with an Operational
                      Works approval and must include in particular a driveway crossover in accordance with
                      Council’s Standard Drawings RS-049 and RS-050 and any applicable addendum.
               22.    The driveway must be located clear of any existing services or drainage pits in the road
                      reserve.
                      Car Parking
               23.    A minimum of 4 car parking spaces must be provided and marked on the site. The works
                      must be undertaken in accordance with an Operational Works approval and must include in
                      particular dimensions, crossfalls and gradients in accordance with Australian Standard
                      AS2890: Parking Facilities.
               24.    All vehicles must enter and exit the site in a forward gear. The manoeuvring area within the
                      site must be kept clear of obstructions.
                      Pedestrian and Bicycle Facilities
               25.    Pedestrian and bicycle facilities must be provided for the development. The works must be
                      undertaken in accordance with an Operational Works approval and must include in particular
                      a 1.5 metre wide footpath within the road verge for the entire length of the site’s frontage to
                      Grant Street
                      Stormwater Drainage
               26.    The site must be provided with a stormwater drainage system connecting to a lawful point of
                      discharge. The works must be undertaken in accordance with an Operational Works
                      approval and must include in particular collection and discharge of stormwater to Council’s
                      existing drainage system in Grant Street.




                                                                                                         Page 4 of 8
Document Set ID: 22787295
Version: 4, Version Date: 31/01/2024

Page 5

                      Electricity and Telecommunication Services
               27.    Unless otherwise stipulated by telecommunications legislation at the time of construction, the
                      development must be provided with all necessary conduits, pits and pipes to accommodate
                      the future connection of optic fibre technology telecommunications.
               28.    Certification must be submitted to Council from all relevant service providers which certifies
                      that the development has met the requirements of this Decision Notice and all applicable
                      legislation at the time of construction.
                      Earthworks and Retaining Walls
               29.    All earthworks and associated batters/anchors must be contained entirely within the subject
                      site unless written permission from the respective landowner(s) is provided to Council. All
                      earthworks must be undertaken in accordance with the provisions of Australian Standard
                      AS3798: Guidelines on Earthworks for Commercial and Residential Developments.
                      Damage to Services and Assets
               30.    Any damage caused to existing services and assets as a result of the development works
                      must be repaired at no cost to the asset owner at the following times:
                      a.      where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
                              or
                      b.      where otherwise, upon completion of the works associated with the development.
                      Any repair work which proposes to alter the alignment or level of existing services and assets
                      must first be referred to the relevant service authority for approval.
               31.    The annotated louvres of the vergolas shown on the Approved Plans, are to be fixed and
                      remain open.
               32.    Privacy screening to the external circular staircase must be always maintained.
               5.     REFERRAL AGENCIES

               Not applicable.
               6.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
                      Building and Construction Industry (Portable Long Service Leave) Levy
               1.     The QLeave levy must be paid prior to the issue of a development permit where it is required.
                      Council will not be able to issue a Decision Notice without receipt of details that the Levy has
                      been paid. QLeave contact: 1800 803 481 (free call) or (07) 3212 6855.
                      Co-ordination of Operational Works Assessment
               2.     Additional application fees apply to Operational Work applications where the different
                      aspects of the works are lodged separately. Significant savings in application fees will result
                      if all works are lodged in a single application.
                      Preparation of a Preliminary Construction Management Plan
               3.     A preliminary Construction Management Plan must be submitted with the Operational Works
                      application and must address the following:
                      a.      traffic management during all aspects of the construction phase including:
                              i.       a Traffic Management Control Plan in accordance with the Manual of Uniform
                                       Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
                                       control measures prior to construction
                              i.       maintenance of safe pedestrian access for the areas affected by the works during
                                       and after daily construction has ceased


                                                                                                          Page 5 of 8
Document Set ID: 22787295
Version: 4, Version Date: 31/01/2024

Page 6

                              ii.      proposed fencing to the site during the construction phase of the development
                              iii.     provision for worker car parking
                      b.      maintenance and protection of water quality and existing drainage lines through the
                              construction site, through the implementation of appropriate erosion and sediment
                              control measures
                      c.      works programme identifying key components of the works and their respective
                              durations
                      d.      establishment of a communication protocol with the general public, adjoining owners,
                              emergency services and local businesses to advise of agreed construction times,
                              impacts on traffic, services and other relevant issues
                      e.      identification of complaint management procedures including:
                              i.       contact details for the on-site manager
                              ii.      dispute resolution procedures
                      f.      details on the location of external fill/dump sites, the haulage route, type of vehicle to
                              be utilised during filling operations and frequency of usage. NB any damage to the
                              existing road system as a result of haulage operations shall be fully repaired at the
                              applicant’s expense
                      g.      it is acknowledged that the preliminary Construction Management Plan will be a draft
                              document requiring finalisation upon appointment of the Principal Contractor employed
                              to construct the works and a final document will be required to be submitted at the Pre-
                              Start Meeting for the project.
                      Infrastructure Charges
               4.     All developments and/or changes to existing developments may require payment of
                      “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
                      made pursuant to the planning legislation and regulations current at the time of issue. For
                      further information, please refer to https://www.noosa.qld.gov.au/planning-
                      development/development-tools-guidelines/infrastructure-charges
               7.     PROPERTY NOTES

               Not applicable.
               8.     VARIATION APPROVAL DETAILS

               Not applicable.
               9.     FURTHER DEVELOPMENT PERMITS REQUIRED

                Type of Development Permit Required                    Subject of the required Development Permit

                Development Permit for Operational Works               Access,    Stormwater,     External        Works,
                                                                       Landscaping, Earthworks

                Development Permit for Building Works                  All building works

               10.    SUBMISSIONS

               Not applicable.
               11.    RIGHTS OF APPEAL

               You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
               Planning Act 2016 is attached.




                                                                                                             Page 6 of 8
Document Set ID: 22787295
Version: 4, Version Date: 31/01/2024

Page 7

               12.      OTHER DETAILS

               If you wish to obtain more information about the decision, electronic copies are available on line at
               www.noosa.qld.gov.au or at Council Offices.
               Yours faithfully,




               Georgina Schramm
               Development Planner



               Enc:     Appeal Rights
                        Infrastructure Charge Notice
                        Approved Plans/Documents
               cc.      Unitywater

               DECISION NOTICE HISTORY
               •     Original Decision Notice – 1 August 2018.

               •     Decision Notice - Minor – MCU17/0559.02 – 3 February 2020, with an amendment to condition 2.

               •     Generally in Accordance – MCU17/0559.03 – 20 November 2020.

               •     Decision Notice - Minor – MCU17/0559.04 – 31 January 2024, with an amendment to conditions 2 & 5, additional conditions 31 and
                     32 and delete condition 4




                                                                                                                                 Page 7 of 8
Document Set ID: 22787295
Version: 4, Version Date: 31/01/2024

Page 8

                                                                              Appeal Rights
                                                                              PLANNING ACT 2016 & PLANNING REGULATION 2017




               Chapter 6 Dispute resolution                                                   (3) The appellant or, for an appeal to a tribunal, the registrar must,
                                                                                                  within the service period, give a copy of the notice of appeal to –
               Part 1 Appeal rights
                                                                                                  (a) the respondent for the appeal; and
               229 Appeals to tribunal or P&E Court
                                                                                                  (b) each co-respondent for the appeal; and
               (1) Schedule 1 of the Planning Act 2016 states –
                                                                                                  (c) for an appeal about a development application under schedule
                   (a) Matters that may be appealed to –
                                                                                                      1, table 1, item 1 – each principal submitter for the
                         (i)   either a tribunal or the P&E Court; or                                 development application; and
                         (ii) only a tribunal; or                                                 (d) for and appeal about a change application under schedule 1,
                                                                                                      table 1, item 2 – each principal submitter for the change
                         (iii) only the P&E Court; and
                                                                                                      application; and
                   (b) The person-
                                                                                                  (e) each person who may elect to become a co-respondent for the
                         (i)   who may appeal a matter (the appellant); and                           appeal, other than an eligible submitter who is not a principal
                                                                                                      submitter in an appeal under paragraph (c) or (d); and
                         (ii) who is a respondent in an appeal of the matter; and
                                                                                                  (f)   for an appeal to the P&E Court – the chief executive; and
                         (iii) who is a co-respondent in an appeal of the matter; and
                                                                                                  (g) for an appeal to a tribunal under another Act – any other
                         (iv) who may elect to be a co-respondent in an appeal of the
                                                                                                      person who the registrar considers appropriate.
                              matter.
                                                                                              (4) The service period is –
               (2) An appellant may start an appeal within the appeal period.
                                                                                                  (a) if a submitter or advice agency started the appeal in the P&E
               (3) The appeal period is –
                                                                                                      Court – 2 business days after the appeal has started; or
                   (a) for an appeal by a building advisory agency – 10 business
                                                                                                  (b) otherwise – 10 business days after the appeal is started.
                       days after a decision notice for the decision is given to the
                       agency; or                                                             (5) A notice of appeal given to a person who may elect to be a co-
                                                                                                  respondent must state the effect of subsection (6).
                   (b) for an appeal against a deemed refusal – at any time after the
                       deemed refusal happens; or                                             (6) A person elects to be a co-respondent by filing a notice of election,
                                                                                                  in the approved form, within 10 business days after the notice of
                   (c) for an appeal against a decision of the Minister, under chapter
                                                                                                  appeal is given to the person.
                       7, part 4, to register premises or to renew the registration of
                       premises – 20 business days after a notice us published under          231 Other appeals
                       section 269(3)(a) or (4); or
                                                                                              (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
                   (d) for an appeal against an infrastructure charges notice – 20                the Supreme Court decides a decision or other matter under this
                       business days after the infrastructure charges notice is given             Act is affected by jurisdictional error, the decision or matter is non-
                       to the person; or                                                          appealable.
                   (e) for an appeal about a deemed approval of a development                 (2) The Judicial Review Act 1991, part 5 applies to the decision or
                       application for which a decision notice has not been given –               matter to the extent it is affected by jurisdictional error.
                       30 business days after the applicant gives the deemed
                                                                                              (3) A person who, but for subsection (1) could have made an
                       approval notice to the assessment manager; or
                                                                                                  application under the Judicial Review Act 1991 in relation to the
                   (f)   for any other appeal – 20 business days after a notice of the            decision or matter, may apply under part 4 of that Act for a
                         decision for the matter, including an enforcement notice, is             statement of reasons in relation to the decision or matter.
                         given to the person.
                                                                                              (4) In this section –
               Note –                                                                             decision includes-
                   See the P&E Court Act for the court’s power to extend the appeal
                                                                                                  (a) conduct engaged in for the purpose of making a decision; and
                   period.
                                                                                                  (b) other conduct that relates to the making of a decision; and
               (4) Each respondent and co-respondent for an appeal may be heard
                   in the appeal.                                                                 (c) the making of a decision or failure to make a decision; and
               (5) If an appeal is only about a referral agency’s response, the                   (d) a purported decision; and
                   assessment manager may apply to the tribunal or P&E Court to
                                                                                                  (e) a deemed refusal.
                   withdraw from the appeal.
                                                                                                  non-appealable, for a decision or matter, means the decision or
               (6) To remove any doubt. It is declared that an appeal against an
                                                                                                  matter-
                   infrastructure charges notice must not be about-
                                                                                                  (a) is final and conclusive; and
                   (a) the adopted charge itself; or
                                                                                                  (b) may not be challenged, appealed against, reviewed, quashed,
                   (b) for a decision about an offset or refund-
                                                                                                      set aside or called into question in any other way under the
                         (i)   the establishment cost of trunk infrastructure identified in           Judicial Review Act 1991 or otherwise, whether by the
                               a LGIP; or                                                             Supreme Court, another court, a tribunal or another entity; and
                         (ii) the cost of infrastructure decided using the method                 (c) is not subject to any declaratory, injunctive or other order of
                              included in the local government’s charges resolution.                  the Supreme Court, another court, a tribunal or another entity
                                                                                                      on any ground.
               230 Notice of appeal
                                                                                              232 Rules of the P&E Court
               (1) An appellant starts an appeal by lodging, with the registrar of the
                   tribunal or P&E Court, a notice of appeal that-                            (1) A person who is appealing to the P&E Court must comply with the
                                                                                                  rules of the court that apply to the appeal.
                   (a) is in the approved form; and
                   (b) succinctly states the grounds of the appeal.                           (2) However, the P&E Court may hear and decide an appeal even if
                                                                                                  the person has not complied with the rules of the P&E Court
               (2) The notice of appeal must be accompanied by the required fee.




                                                                                                                                                    Page 8 of 8
Document Set ID: 22787295
Version: 4, Version Date: 31/01/2024

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.