DSDIP concurrence agency response with conditions - Elm St and Pearsons Rd, Cooroy MCU13_0226 (SDA-1213-006571)
Attached to the e-mail Concurrence agency response-with conditions MCU13/0226 Lot 135 MCH978 SDA-1213-006571.
SDA-1213-006571 Our reference: SDA-1213-006571 Your reference: MCU13/0226 Attachment 1—Conditions to be imposed No. Conditions Condition timing Preliminary Approval for Material Change of Use (24 Detached Houses) State-controlled roads Pursuant to section 255D of the Sustainable Planning Act 2009, the chief executive administering the Sustainable Planning Act 2009, nominates the Director-General of the Department of Transport and Main Roads, to be the assessing authority for the development to which this development approval relates for the administration and enforcement of any matter relating to the following conditions: 1. Development must be carried out generally in accordance Prior to the with the following plan and report, except as modified by commencement of use these concurrence agency conditions: and to be maintained at all times. # Plan of Proposed Reconfiguration of Lot 135 on MCH978, prepared by Max Watterson and Associates, dated 28 March 2014, Ref 10-3032AZ; and # Rail and Traffic Noise Study, prepared by Renzo Tonin Ron Rumble, dated 11 April 2014, reference Q9818-01F02, Rev 1. 2. Vehicular access between Cooroy Connection Road and Lot At all times. 135 on MCH978 is not permitted. 3. (a) The management of stormwater (quantity and (a) & (b) quality) post development must achieve a no Prior to the worsening impact (on the pre-development commencement of use condition) calculated for all flood events including and to be maintained at all and up to Average Recurrence Interval (ARI) 100 times. in accordance with the Department of Transport and Main Roads’ Road Drainage Manual, the Queensland Urban Drainage Manual, Environmental Protection Act 1994, and Environmental Protection (Water) Policy 2009. In particular, stormwater management for the development must ensure no worsening or actionable nuisance to the state-controlled road network caused by peak discharges, flood levels, frequency/duration of flooding, flow velocities, water quality, sedimentation and scour effects. (b) Any excavation, filling, paving, landscaping, construction or any other works to the land must not: i. create any new discharge points for stormwater runoff onto the state-controlled road; ii. interfere with and/or cause damage to the existing stormwater drainage on the state-controlled road; iii. surcharge any existing culvert or drain on the state-controlled road; iv. reduce the quality of stormwater discharge onto the state-controlled road. Department of State Development, Infrastructure and Planning Page1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.