Council archive · source document
08/0194 - Operational Works - Transport Type 5 - Domestic Marine [As Published] · 142008.194
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007 49 Is the proposed operational work for the following? e For the construction of a referable dam as defined under the Water Act 2000 = [x] No CO Yes © To increase the storage capacity of a referable dam by more than 10% —) No 1 Yes If yes to either or both - (Complete Part Ks) This application requires assessment by the Department of Natural Resources and Water (NRW). if NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. IPA shed. '#! pad] iab'e 4 tem 4 JP Regulation schedite 2 iable 2. tem 70 DAL WORK; wiLD RIVER AREA _ 4.10 ls any of the proposed operational work tidal work, other than excluded work defined under the IPA? [x] No (1) Yes - Answer (a) and (b) below IPA, schedute 8 part 1, table 4, item 5 IP Regutation schedule 2. table 2, hems 12, M4 and 1/ IP Regulation schedule 1. part 3 table 4, tems 4A and § Coastal Protection and Management Act 1995 section 104A (wild river area) COASTAL MANAGEMENT DISTRICT: : WILD RIVER RAREA 411 ts any of the operational work proposed to be carried out within a coastal management distil? [x] No LC] Yes IPA, schedule 8, part 1, table 4 uem 5 IP Regutation, schedule 2, table 2, tems 12 and 14 IP Regulation, schedule 1, part 3, able 4, wems 4A and § Coastal Protection and Management Act 1995 Act 1995, section 104A (wad nver ded) Wald Rriers Act 2005, section 434 AVATERWAY BARRIER WORKS; WILD RIVER AREA i. 4.12 is any of the proposed operational work for constructing or raising waterway barrier works under the F Fisheries Act 1994? [X] No LJ Yes IPA schedute 8 part 1, table 4, item 6 IPA schedule 8, part 2, table 4, item 2 IP Regulation, schedule 2, table 2, item 28 IP Regulation, schedule 1, part 3, table 4, item 6 Fisheries Act 1994, section 76D (wild river area) Wild Rivers Act 2005, section 43A pec CLARED FISH HABITAT AREA, WILD RIVER AREA 4.13 Is any of the operational work proposed to be carried out completely or partly within a declared fish habitat area under the Fisheries Act 1994? No C] Yes IPA, schedule 8 part 1, table 4, tem 7 IPA, schedule 8 part 2, table 4, item 3 IP Regulation, schedule 2, table 2, item 25 IP Regulation, schedule 1, part 3, table 4, item 7 Wud Rivers Act 2005, sections 43A Fisheries Act section /6DC (wild river area} REMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT; WILD RIVER AREA 4.14 Is any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994? No C Yes
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0194 - Operational Works - Transport Type 5 - Domestic Marine [As Published]Related documentApplication case desk ↗
About this file
- File size
- 746 KB (small file)
- File type
No other editions are linked here.