Skip to the record
Beware of cheap imitations.

Council archive · source document

08/0194 - Operational Works - Transport Type 5 - Domestic Marine [As Published] · 142008.194

of 16

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 {DAS Assessment Checklist, Version 21.0, 3 September 2007
JPA schedtite 8 part? table 5, tem 1
IP Regu. nec’ 2, table 2, dem 11
IP Regist er sents V table 5 fem 2 ia dren ate}
Water Art 2000 section 966C
Vind Rivers A. 12005 section 43A

 

 

 

 

ENVIRONMENTALLY RELEVANT ACTIVITY: WILD RIVER | AREA

1.3 Does the proposal involve an environmentally relevant activity € RA), other than a mining activity or a petroleum activity?

[xX] No
( Yes

IPA schedutt 8 part 7, table 2. tem 7

IPA, schedule 8 part 1. table 5 wems 3 and 4

IP Regulation schedule 2 table 2, tems 1 and 23

Environmental Protection Act 1994, section /3AA (wid river area)
Wad Rivers Act 2005, section 43A

THIN THE UBATS OF APORT oy
14 ls any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?

[x] No
C1 Yes

IP Regulation, schedule 2, table 2, items 15 and 16

 

 

 

 

DECLARED FISH HABITAT AREA ~ |

15 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
[X] No

Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA,
1p!
schedule 8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). if DPI&F is not
the Assessment Manager for the application, the agency has jurisdiction as Advice Agency.

 

IP Regulation, schedule 2, table 2, item 26

 

 

COMMUNITY INFRASTRUCTURE s——s—“—=s<“‘<“<i <;< CO]
1.6 (s any part of the premises designated for community infrastructure?

[x] No

CL) Yes

JP Regulation, schedule 2, table 3. kem 7

 

 

 

WVASTE WATER MANAGEMENT 3
17 Does the proposal involve the establishment or expansion of a waste water disposal system?

[x] No

( Yes

IP Regutation, schedule 2, table 3, tem 5

 

 

 

Section 4 must be completed when the application seeks approval to carry out operational work.

PLANNING SCHEME = ————

44 ts any of the proposed operational work assessable under a planning scheme?

[K] No - Go to Question 4.2 below
[Yes - Complete Part E of IDAS Application Form 1 and Questions 4.1.1 - 4.1.8 below

ASSOCIATED WITH RECONFIGURING A LOT; RESIDENTIAL, COVMERCIAL OR INDUSTRIAL DEVELOPMENT INA WILD RIVER
(AREA _
42 Is any of the proposed operational work associated with reconfiguring a lot, if the reconfiguration is also assessable?

No
( Yes

IPA, schedule 8, part 1, table 4, item 2

IP Regulation, schedule 1, part 2, table 5, item 1(c)

Wild Rivers code (Note. the code does not currently contain applicable provisions for residential, industrial of commercial development inside 4 designated urban
area)

 

 

 

 

Used in these records

About this file

File size
746 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0194 - Operational Works - Transport Type 5 - Domestic Marine [As Published].pdf · 746 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.