Council archive · source document
08/0194 - Operational Works - Transport Type 5 - Domestic Marine [As Published] · 142008.194
INTEGRATED PLANNING ACT 1997 {DAS Assessment Checklist, Version 21.0, 3 September 2007
JPA schedtite 8 part? table 5, tem 1
IP Regu. nec’ 2, table 2, dem 11
IP Regist er sents V table 5 fem 2 ia dren ate}
Water Art 2000 section 966C
Vind Rivers A. 12005 section 43A
ENVIRONMENTALLY RELEVANT ACTIVITY: WILD RIVER | AREA
1.3 Does the proposal involve an environmentally relevant activity € RA), other than a mining activity or a petroleum activity?
[xX] No
( Yes
IPA schedutt 8 part 7, table 2. tem 7
IPA, schedule 8 part 1. table 5 wems 3 and 4
IP Regulation schedule 2 table 2, tems 1 and 23
Environmental Protection Act 1994, section /3AA (wid river area)
Wad Rivers Act 2005, section 43A
THIN THE UBATS OF APORT oy
14 ls any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?
[x] No
C1 Yes
IP Regulation, schedule 2, table 2, items 15 and 16
DECLARED FISH HABITAT AREA ~ |
15 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
[X] No
Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA,
1p!
schedule 8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). if DPI&F is not
the Assessment Manager for the application, the agency has jurisdiction as Advice Agency.
IP Regulation, schedule 2, table 2, item 26
COMMUNITY INFRASTRUCTURE s——s—“—=s<“‘<“<i <;< CO]
1.6 (s any part of the premises designated for community infrastructure?
[x] No
CL) Yes
JP Regulation, schedule 2, table 3. kem 7
WVASTE WATER MANAGEMENT 3
17 Does the proposal involve the establishment or expansion of a waste water disposal system?
[x] No
( Yes
IP Regutation, schedule 2, table 3, tem 5
Section 4 must be completed when the application seeks approval to carry out operational work.
PLANNING SCHEME = ————
44 ts any of the proposed operational work assessable under a planning scheme?
[K] No - Go to Question 4.2 below
[Yes - Complete Part E of IDAS Application Form 1 and Questions 4.1.1 - 4.1.8 below
ASSOCIATED WITH RECONFIGURING A LOT; RESIDENTIAL, COVMERCIAL OR INDUSTRIAL DEVELOPMENT INA WILD RIVER
(AREA _
42 Is any of the proposed operational work associated with reconfiguring a lot, if the reconfiguration is also assessable?
No
( Yes
IPA, schedule 8, part 1, table 4, item 2
IP Regulation, schedule 1, part 2, table 5, item 1(c)
Wild Rivers code (Note. the code does not currently contain applicable provisions for residential, industrial of commercial development inside 4 designated urban
area)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0194 - Operational Works - Transport Type 5 - Domestic Marine [As Published]Related documentApplication case desk ↗
About this file
- File size
- 746 KB (small file)
- File type
No other editions are linked here.