Original source · versioned page text
Attachment 1 - Current Approval for MCU
Attached to the e-mail 132007.12.06 Application to Change Development Approval.
132007.12.4
2. The applicant is advised that development contributions and infrastructure charges
applicable to this development approval have been based on the following Uses Class/
Uses and applicable quantities:-
Existing Development Approved Development
(References = 23495DA; 2004/5231; (Reference = 2007/0012)
20050866; & 2006/2435)
Existing Use Approved Use Approved Quantity
Existing Quantity
Class / Use Class / Use STAGE A STAGE B
2 2
Commercial Commercial 2,178 m 1,368 m
2
Business Type 1 1,630 m Use Area Business Type 1 Maximum Use Maximum Use
Office Office Area Area
2 2
3,000 m 3,000 m
2
Commercial 2,460 m Use Area Commercial Maximum Use Maximum Use
Business Type 2 (equivalent to 55 Business Type 2 Area (equivalent Area (equivalent
Medical consulting rooms) Medical to 67 consulting to 67 consulting
rooms) rooms)
2 2
100 m 100 m
Retail Business 2 Retail Business
100 m Use Area Maximum Use Maximum Use
Type 1 Local Type 1 Local
Area Area
Retail Business Retail Business
2 2
Type 2 Shop; & Type 2 Shop; & 236 m 236 m
2
Entertainment & 236 m Use Area Entertainment & Maximum Use Maximum Use
Dining Type 1 Dining Type 1 Food Area Area
Food & Beverage & Beverage
2 2
790 m 1,600 m
2
Education Type 3 790 m Use Area Education Type 3 Maximum Use Maximum Use
Adult (70 students) Adult Area Area
(70 students) (140 students)
2 TOTAL Maximum 2 2
5,216 m 6,304 m 6,304 m
TOTAL = Use Area
Use Area Use Area Use Area
Allowable =
3. The applicant is informed that approval of this development application will trigger an
Infrastructure Charge in accordance with the Coastal Major Road Network Infrastructure
Charges Plan for the estimated amount of $157,394 (STAGE A) and $0 (STAGE B) =
TOTAL (Stage A + Stage B) = $157,394 and is subject to variations in the Consumer
Price Index, All Groups Brisbane from SEPTEMBER 2008 until the date of payment. An
Infrastructure Charge Notice will be issued in accordance with Chapter 5 of the
Integrated Planning Act 1997.
4. The applicant is informed that payment via credit card transaction will not be an
acceptable method of payment for development contributions conditioned in this permit
or for infrastructure charge notices issued separately.
5. Digital detailed designs including drawings, calculations, specifications and a schedule of
works, shall be submitted with any application for a Development Permit for Operational
Works in respect of roadworks and stormwater drainage works. In this regard a
DXF/DWG file on GDA94 zone 56 grid of the proposed cadastre layout is to be submitted
in conjunction with any application for Operational Works. The design shall be in
accordance with Council’s Planning Scheme Policy PSP05 – Engineering Design
Standards – Roads, Drainage and Earthworks.
6. To facilitate production of As Constructed drawings it is suggested that all design
drawings are submitted in the Asset Design and As Constructed (ADAC) digital format.
(Guidelines on the use of ADAC are available at www.adac.com.au).
7. Prior to the commencement of the development, a plumbing assessment must be
obtained from Noosa Council’s Plumbing Services Section in accordance with the
Plumbing & Drainage Act 2002 (as applicable).
PD-DA-FM383/5-09/08/2010 Page 12 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment 1 - Current Approval for MCU.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.