Original source · versioned page text
Reference Document Bushfire Hazard Assessment & Management Plan 131998.981.5
Plans and drawings: the text below has words only, no drawings.
Very large file (22.4 MB): may take a few minutes to open.
Bushfire Hazard Assessment & Management Plan v4 NCES REF: J001061 Lot 7 on RP216403, Lot 394 on M371117, and Lot 650 on M37380 — 48-59 Kabi Road, Cootharaba footprint must be separated from the closest edge of an adjacent mapped medium, high or very-high potential bushfire intensity area by a distance (APZ width) that achieves a radiant heat flux level of 10 kW/m? or less at all development footprint boundaries. The proposed development footprint achieves <10kW/m? RHF exposure from the High and Medium Potential Intensity Areas associated with the VHC 8.1, VHC 9.1, and VHC 36.1 vegetation hence satisfies the vulnerable use setback criteria. Therefore, no specific APZ’s are required about the proposed infrastructure location whilst site conditions remain as they are detailed herein. It is recommended future landscaping does not exacerbate the bushfire hazard risk on the site and result in separation between infrastrcuture and hazardous vegetation that generates non- compliance with the vulnerable use setback criteria. 5.3 Water Supply The availability of a reliable water supply for firefighting purposes is a vital tool in the defence of bushfire impact. Reticulated water supply is currently not available within the site nor proposed to be connected to the site. Therefore, any proposed buildings in the confirmed bushfire prone areas (refer Plan BFO3) within the site require provision of a readily accessible on-site emergency static water supply in accordance with Assessment Benchmark 4 of the SPP Bushfire 2019. Assessment Benchmark 4 references the QFES 2019 Bushfire Resilient Communities document for information regarding appropriate static water supply. Section 9.1 of Bushfire Resilient Communities’ states: An appropriate static water supply (in bushfire prone areas where reticulated supply is not provided) to support effective emergency services response includes a water tank that is available solely for firefighting purposes and can be accessed by firefighting appliances. The water tank is to be provided within 10 metres of each building (other than a class 10 building), which: a) is either below ground level or of non-flammable construction; b) has a take-off connection at a level that allows the following dedicated, static water supply to be left available for access by firefighters: i.10,000 litres for residential buildings; Only the eastern wing of cabins (7 cabins total) is captured within a confirmed bushfire prone area (refer Plate 20). The approximately footprint of all 7 cabins captured within the confirmed bushfire prone area is 320m which is about the size of a single large residential building. Therefore, the provision of 10,000 litres to service all 7 cabins is sufficient. It is noted that a 300,000 litres tank is proposed adjacent to the southeast eastern wing of cabins. The required 10,000 litres can be provided within this larger tank or alternatively as a separate 10,000 litres tank which should be located centrally to all cabins. The 10,000 litres supply is to be reserved for firefighting purposes only to be shared between 2 cabins. Plate 21 outlines an example of reserve water supply in a standard tank. © 2024 28
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.