Original source · versioned page text
Reference Document Bushfire Hazard Assessment & Management Plan 131998.981.5
Plans and drawings: the text below has words only, no drawings.
Very large file (22.4 MB): may take a few minutes to open.
Bushfire Hazard Assessment & Management Plan v4 NCES REF: J001061 Lot 7 on RP216403, Lot 394 on M371117, and Lot 650 on M37380 — 48-59 Kabi Road, Cootharaba The required 10,000 litres can be provided within this larger tank or alternatively as a separate 10,000 litres tank which should be located centrally to all cabins. The 10,000 litres supply is to be reserved for firefighting purposes only to be shared between 2 cabins. Plate 21 outlines an example of reserve water supply in a standard tank. Assessment Benchmark 5 Assessable material change of use Site layout places the landscape and open spaces within the site between premises and adjacent mapped medium, high or very high potential bushfire intensity areas. This landscaping and open space comprises protective landscape treatments that: 1. Comprise only low threat vegetation, including grassland managed in a minimal fuel condition16, maintained lawns, golf courses and cultivated gardens; or 2. Are designed to ensure a potential available fuel load is maintained at less than 8 tonnes/hectare in aggregate and with a fuel structure that remains discontinuous. Note — The landscape or open space may be located within the mapped medium, high and very high intensity areas to create a separation between the development and the balance of the bushfire prone area. The proposed development footprint boundary is separated from the hazardous vegetation areas. It is recommended that any new landscaping associated with the proposed works maximises the use of low-flammability species and or avoids clustering of flammable species. Where involving a requirement for revegetation or rehabilitation outside of bushfire prone areas 1. Revegetation or rehabilitation areas contain patches of less than one ha of continuous fuel (i.e., surrounded by either no fuel or non-continuous fuel) and are further than 100 metres from the interface with mapped medium, high or very high potential bushfire intensity patches greater than two hectares in size. Vegetation corridors in these areas with continuous fuel, should be less than 50 metres in width and isolated patches of continuous fuel, should be less than 0.5 hectare. No revegetation or rehabilitation areas are currently proposed. It is recommended that any landscaping undertaken within the site facilitates conditions which satisfy Assessment Benchmark 7 below. Assessment Benchmark 7 Where a requirement for an asset protection zone (or similar) exists Landscaping treatments comprise only low threat vegetation, including grassland managed in a minimal fuel condition, maintained lawns, golf courses, maintained public reserves and parklands, vineyards, orchards, cultivated gardens, commercial nurseries, nature strips and windbreaks. OR Landscaping management maintains a potential available fuel load which is less than eight tonnes/hectare in aggregate, and fuel structure which is discontinuous. OR Development includes a bushfire management plan for the maintenance of any identified asset protection zone, including landscape design and ongoing vegetation management. This document includes a Bushfire Management Plan which addresses Landscaping treatments. f G ec eS cme ©2024 40
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.