Council archive · source document
07/1446 - MCU - Multiple Housing Type 2 Duplex [As Published] · 132007.1446
Very large file (12.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
IDAS Assessment Checklist, Version 20, 2 April 2007 “5147. The application involves: (tick the applicable boxes) (1) reconfiguring a lot for which all of part of the premises are — (a) premises mentioned in the IPA, schedule 8, part 1, table 2 - « item 5, including the exemption otherwise provided for by paragraph (d); « item 6, including the exemption otherwise provided for by paragraph (e); or « item 7, including the exemption otherwise provided for a mining activity or petroleum 3e ‘ activity; or effianager for the application, EPA will be a (b) in an area for which an area management advice has been given for unexploded Goncurrehoe agency forthe application in ordnance - complete Part N of Form 4 =felafion to this matter, : CU (i) a material change of use - (a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or (b) assessable against the planning scheme and if all or part of the premises is in an area for which an area management advice has been given for unexploded ordnance - , complete Part N of Form 1 & (i) none of the above — icctricity Infrastructure /18, The application involves: (tick the applicable bovis) "od thor information refer to Shiedule2of the IP Ci) reconfiguring a fot where any part of the lot is ~ Regulation : . . « subject to an easement in favour of a distribution entity or transmission entity under the Uniess you answered * ‘agne ofthe above" to, a + te : 18, he application tigge’s referral tothe’ Electricity Act 1994 and the easement is for a transmission grid or supply network under which en) in that Act; or favour of as advice ageticy. « situated within 100m of a substation site; vot C1 (i) a material change of use, assessable against a planning scheme and not associated ty tht with reconfiguring a lot if - « any part of the premises is subject to an easement in favour of a distribution entity or transmission entity under the Electricity Act 1994 and the easement is for a transmission grid or supply network under that Act; and « any structure or work that is the natural and ordinary consequence of the use is, or will be, located wholly or partly in the easement; (1) (ii) material change of use, assessable against a planning scheme and not associated with reconfiguring a lot if any part of the premises is situated within 100m of a substation site; O (iv) operational work that is filling or excavation assessable against the planning scheme, not associated with reconfiguring a lot, if - any part of the premises is subject to an easement in favour of a distribution entity or transmission entity under the Electricity Act 1994 and the work is located wholly or partly in the easement; « the work is located wholly or partly within 10m of a substation site; El (), none of the above. . Does the application involve development. assessable against the planning scheme and on lan designated for community infrastructure? e@ (i) intended to be supplied by a public sector entity; and (ii) on land not owned by or on behalf of the State; and (iii) other than development — (a) for the designated purpose; or ° (b) carried out by, or on behalf of, the designator. NO Dyes Page 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1446 - MCU - Multiple Housing Type 2 Duplex [As Published]Related documentApplication case desk ↗
0015A2A0.001.pdfRelated documentPublic source context ↗
About this file
- File size
- 12.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.