Original source · versioned page text
BAX OPWKS 220706 184-001 11C Church Street Pomona
Attached to the e-mail EMAIL 1 OF 3 - MCU22/0031 and OPW22/0062 - INFORMATION REQUEST RESPONSE.
11 CHURCH ST, POMONA BAX Engineering QLD 4568 PTY. LTD. 2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573 [email protected] Development Application ZACCALE PTY LTD NORTH POINT DRAWING SCHEDULE Table List Sheet Sheet Number Sheet Title 184-001-001 COVER SHEET 184-001-002 GENERAL NOTES 184-001-100 PROPOSED OVERALL LAYOUT PLAN 184-001-200 EARTHWORKS LAYOUT PLAN RED ST 184-001-201 EARTHWORKS SECTIONS 184-001-300 SITEWORKS, SERVICES AND DRAINAGE LAYOUT PLAN 184-001-301 STORMWATER BASIM DETAILS 184-001-310 DRIVEWAY LONGITUDINAL SECTIONS SHEET 1 OF 2 Y ST 184-001-311 DRIVEWAY LONGITUDINAL SECTIONS SHEET 2 OF 2 SITE R 184-001-400 STORMWATER CATCHMENT LAYOUT PLAN POTTE LOCATION 184-001-700 184-001-701 SWEPT PATH LAYOUT PLAN - SHEET 1 OF 6 SWEPT PATH LAYOUT PLAN - SHEET 2 OF 6 184-001-702 SWEPT PATH LAYOUT PLAN - SHEET 3 OF 6 184-001-703 SWEPT PATH LAYOUT PLAN - SHEET 4 OF 6 184-001-704 SWEPT PATH LAYOUT PLAN - SHEET 5 OF 6 H ST 184-001-705 SWEPT PATH LAYOUT PLAN - SHEET 6 OF 6 RY ST 184-001-800 EXTERNAL ROADWORKS LAYOUT PLAN RAILWAY PARADE CHURC RECTO MEMOR IAL AVE AL ST HOSPIT LOCALITY PLAN PROPERTY DESCRIPTION PRO ECT DESCRIPTION LOT: PROJECT NAME: 4 11 CHURCH ST, POMONA QLD 4568 PLAN: SP301620 LOCAL AUTHORITY: OPW CONCEPT ONLY PROJECT NO: 184-001 REVISION DATE: 06.06.2022 NOOSA COUNCIL LOCAL AUTHORITY APPROVAL NO: PLAN ISSUE: MCU 22/0031 FOR APPROVAL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.
Full text of the other 16 pages
Page 2
GENERAL EARTHWOR S ROADWOR S SEDIMENT AND EROSION
STORMWATER
·
·
·
·
·
·
LINEMAR ING
ENERGY SERVICE PROVIDERS TELECOMMUNICATIONS
SERVICE PROVIDERS elstra Manual of Uniform Traffic Control Devices
BEFORE YOU DIG SERVICE LOCATIONS AGL
ERGON. AUSTRALIA
IT IS THE RESPONSIBILITY OF THE PRINCIPAL
ENERGY
energex ' yes' Telstra visionstream
CONTRACTOR TO CONTACT ALL RELEVANT origin OPTUS WARNING: OPTIC FIBRE NOTE: ALL SIGNS & LINE MARKING TO BE IN
SERVICE AUTHORITIES TO VERIFY THE NOTE: SERVICE LOCATIONS ARE APPROXIMATE ONLY FROM NOTE: SERVICE LOCATIONS ARE APPROXIMATE ONLY FROM EXTREME CARE TO BE TAKEN WHILE EXCAVATING IN THE
LOCATION OF ALL EXISTING SERVICES PRIOR PROVIDERS PLANS. LOCATIONS ARE TO BE CONFIRMED PROVIDERS PLANS. LOCATIONS ARE TO BE CONFIRMED VICINITY OF OPTIC FIBRE CABLES. LOCATIONS ARE TO ACCORDANCE WITH THE MANUAL OF
PRIOR TO START OF CONSTRUCTION. PHONE DBYD PRIOR TO START OF CONSTRUCTION. PHONE DBYD
TO THE START OF CONSTRUCTION SERVICE LOCATIONS ON 1100 FOR DETAILS. SERVICE LOCATIONS ON 1100 FOR DETAILS.
BE CONFIRMED PRIOR TO START OF CONSTRUCTION. UNIFORM TRAFFIC CONTROL DEVICES.
OPW CONCEPT ONLY
BAX
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
ZACCALE PTY LTD GENERAL NOTES
DATUM:
PROJECT NO:
184-001
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering PTY. LTD.
2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573
PROJECT:
11 CHURCH ST, POMONA QLD 4568
LOT 4 SP301620
No. DATE REVISIONS BY CKD MCU 22/0031 DESIGNED FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. [email protected] PLAN No 184-001-002 REVISION B A1
Page 3
H
EC ECEC
C
EC
EE
EEC
CCC
EEC
EC
KEC
G
15
0P
VC
.53
5 91
Telstra
1.3
Power
.40 9
Telstra
91
HHY
HY Marke
r
LEGEND
Water
Water
Telstra WM
WM
WM
Power
Tel Water
Power
Power
225PVC
Telstra
er
Tel Pow
ate 2
r
W 0.0
9
.30
94
NBN
MH HHY HY Marke
r
.55
95
.3 Mat 96.17.19
96Mat 7 .01
4
9 96
6.2
.9 6
95 9
.17
96 8
.43
96
.20
96
OPW CONCEPT ONLY
BAX
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
ZACCALE PTY LTD PROPOSED OVERALL LAYOUT
DATUM:
PLAN
PROJECT NO:
184-001
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering PTY. LTD.
2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573
PROJECT:
11 CHURCH ST, POMONA QLD 4568
LOT 4 SP301620
No. DATE REVISIONS BY CKD MCU 22/0031 DESIGNED FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. [email protected] PLAN No 184-001-100 REVISION B A1
Page 4
H
EC ECEC
C
EC
EE
EEC
CCC
EEC
EC
KEC
G
LEGEND
15
0P
VC
.53
5 91
Telstra
1.3
Power
.40 9
Telstra
91
HHY er
HY Mark
Water
Water
Telstra WM
WM
WM
Power
OPW CONCEPT ONLY
BAX
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
ZACCALE PTY LTD EARTHWORKS LAYOUT PLAN
DATUM:
PROJECT NO:
184-001
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering PTY. LTD.
2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573
PROJECT:
11 CHURCH ST, POMONA QLD 4568
LOT 4 SP301620
No. DATE REVISIONS BY CKD MCU 22/0031 DESIGNED FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. [email protected] PLAN No 184-001-200 REVISION B A1
Page 5
FH
OPW CONCEPT ONLY
BAX
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
ZACCALE PTY LTD EARTHWORKS SECTIONS
DATUM:
PROJECT NO:
184-001
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering PTY. LTD.
2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573
PROJECT:
11 CHURCH ST, POMONA QLD 4568
LOT 4 SP301620
No. DATE REVISIONS BY CKD MCU 22/0031 DESIGNED FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. [email protected] PLAN No 184-001-201 REVISION B A1
Page 6
H
LEGEND
15
0P
VC
H
CONCRETE BOX CHANNEL TYPICAL SECTION
OPW CONCEPT ONLY
BAX
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
ZACCALE PTY LTD SITEWORKS, SERVICES AND
DATUM:
DRAINAGE LAYOUT PLAN
PROJECT NO:
184-001
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering PTY. LTD.
2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573
PROJECT:
11 CHURCH ST, POMONA QLD 4568
LOT 4 SP301620
No. DATE REVISIONS BY CKD MCU 22/0031 DESIGNED FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. [email protected] PLAN No 184-001-300 REVISION B A1
Page 7
≥
≥
≥
OPW CONCEPT ONLY
BAX
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
ZACCALE PTY LTD STORMWATER
DATUM:
BIO-RETENTION DETAILS
PROJECT NO:
184-001
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering PTY. LTD.
2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573
PROJECT:
11 CHURCH ST, POMONA QLD 4568
LOT 4 SP301620
No. DATE REVISIONS BY CKD MCU 22/0031 DESIGNED FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. [email protected] PLAN No 184-001-301 REVISION B A1
Page 8
OPW CONCEPT ONLY
BAX
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
ZACCALE PTY LTD DRIVEWAY LONGITUDINAL
DATUM:
SECTIONS SHEET 1 OF 2
PROJECT NO:
184-001
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering PTY. LTD.
2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573
PROJECT:
11 CHURCH ST, POMONA QLD 4568
LOT 4 SP301620
No. DATE REVISIONS BY CKD MCU 22/0031 DESIGNED FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. [email protected] PLAN No 184-001-310 REVISION B A1
Page 9
OPW CONCEPT ONLY
BAX
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
ZACCALE PTY LTD DRIVEWAY LONGITUDINAL
DATUM:
SECTIONS SHEET 2 OF 2
PROJECT NO:
184-001
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering PTY. LTD.
2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573
PROJECT:
11 CHURCH ST, POMONA QLD 4568
LOT 4 SP301620
No. DATE REVISIONS BY CKD MCU 22/0031 DESIGNED FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. [email protected] PLAN No 184-001-311 REVISION B A1
Page 10
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
·
H
LEGEND
EC ECEC
EC
EC
EC
EC
ECEC
EC
EC
KEC
G
15
0P
VC
.53
1
.35 9
Telstra
Power
1
.40 9
Telstra
91
HHY ker
HY Mar
Water
Water
Telstra WM
WM
WM
Power
Tel Water
Power
Power
225PVC
Telstra
er
Tel Pow
ate 2
r
W 0.0
9
.30
94
NBN
MH HHY HY Marker
.55
95
.3 Mat 96.17.19
96Mat 7 .01
4
9 96
6.2
.9 6
95 9
.17
96 8
.43
96
.20
.55
96
96
OPW CONCEPT ONLY
BAX
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
ZACCALE PTY LTD STORMWATER CATCHMENT
DATUM:
LAYOUT PLAN
PROJECT NO:
184-001
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering
2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573
PTY. LTD.
PROJECT:
11 CHURCH ST, POMONA QLD 4568
LOT 4 SP301620
No. DATE REVISIONS BY CKD MCU 22/0031 DESIGNED FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. [email protected] PLAN No 184-001-400 REVISION B A1
Page 11
H
LEGEND
H
OPW CONCEPT ONLY
BAX
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
ZACCALE PTY LTD SWEPT PATH LAYOUT PLAN -
DATUM:
SHEET 1 OF 6
PROJECT NO:
184-001
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering PTY. LTD.
2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573
PROJECT:
11 CHURCH ST, POMONA QLD 4568
LOT 4 SP301620
No. DATE REVISIONS BY CKD MCU 22/0031 DESIGNED FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. [email protected] PLAN No 184-001-700 REVISION B A1
Page 12
H
LEGEND
H
OPW CONCEPT ONLY
BAX
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
ZACCALE PTY LTD SWEPT PATH LAYOUT PLAN -
DATUM:
SHEET 2 OF 6
PROJECT NO:
184-001
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering PTY. LTD.
2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573
PROJECT:
11 CHURCH ST, POMONA QLD 4568
LOT 4 SP301620
No. DATE REVISIONS BY CKD MCU 22/0031 DESIGNED FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. [email protected] PLAN No 184-001-701 REVISION B A1
Page 13
H
LEGEND
H
OPW CONCEPT ONLY
BAX
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
ZACCALE PTY LTD SWEPT PATH LAYOUT PLAN -
DATUM:
SHEET 3 OF 6
PROJECT NO:
184-001
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering PTY. LTD.
2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573
PROJECT:
11 CHURCH ST, POMONA QLD 4568
LOT 4 SP301620
No. DATE REVISIONS BY CKD MCU 22/0031 DESIGNED FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. [email protected] PLAN No 184-001-702 REVISION B A1
Page 14
H
LEGEND
H
OPW CONCEPT ONLY
BAX
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
ZACCALE PTY LTD SWEPT PATH LAYOUT PLAN -
DATUM:
SHEET 4 OF 6
PROJECT NO:
184-001
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering PTY. LTD.
2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573
PROJECT:
11 CHURCH ST, POMONA QLD 4568
LOT 4 SP301620
No. DATE REVISIONS BY CKD MCU 22/0031 DESIGNED FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. [email protected] PLAN No 184-001-703 REVISION B A1
Page 15
H
LEGEND
H
OPW CONCEPT ONLY
BAX
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
ZACCALE PTY LTD SWEPT PATH LAYOUT PLAN -
DATUM:
SHEET 5 OF 6
PROJECT NO:
184-001
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering PTY. LTD.
2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573
PROJECT:
11 CHURCH ST, POMONA QLD 4568
LOT 4 SP301620
No. DATE REVISIONS BY CKD MCU 22/0031 DESIGNED FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. [email protected] PLAN No 184-001-704 REVISION B A1
Page 16
H
LEGEND
H
OPW CONCEPT ONLY
BAX
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
ZACCALE PTY LTD SWEPT PATH LAYOUT PLAN -
DATUM:
SHEET 6 OF 6
PROJECT NO:
184-001
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering PTY. LTD.
2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573
PROJECT:
11 CHURCH ST, POMONA QLD 4568
LOT 4 SP301620
No. DATE REVISIONS BY CKD MCU 22/0031 DESIGNED FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. [email protected] PLAN No 184-001-705 REVISION B A1
Page 17
C
0PV
15
H
H
LEGEND
OPW CONCEPT ONLY
BAX
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
ZACCALE PTY LTD EXTERNAL ROADWORKS
DATUM:
LAYOUT PLAN
PROJECT NO:
184-001
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering PTY. LTD.
2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573
PROJECT:
11 CHURCH ST, POMONA QLD 4568
LOT 4 SP301620
No. DATE REVISIONS BY CKD MCU 22/0031 DESIGNED FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. [email protected] PLAN No 184-001-800 REVISION B A1