2016-06-07 - P&E Agenda - Item 3, Attachment 1 - Noosa Parklands Draft Management Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnDocument control
Version Date issued Reviewed by Approved by Date approved
st
1 Draft (Rev 1) 11/02/2016 Peter Milne
1st Draft (Rev 2) 17/03/2016 Peter Milne
1st Draft (Rev 3) 26/04/2016 Peter Milne
Final Draft 19/05/2016
Final
Document location:
Document name:
Document version: Final Draft
Report compiled by Ecosure Pty Ltd on behalf of Noosa Council.
Authors – Jess Baglin (Senior Environmental Scientist) and Beth Kramer (Senior Environmental Scientist)
Ecosure internal review – Beth Kramer (Senior Environmental Scientist), Chris Pietsch (Senior Aquatic Ecologist)
and Jen Ford (Principal Restoration Ecologist)
Acknowledgements
The Noosa Parklands Park Management Plan has been prepared by Ecosure Pty Ltd.
Stakeholders, including Council employees and local residents, have been invaluable to this
plan’s development through the contribution of their knowledge and data.
Final draft Noosa Parklands Park Management Plan page | ii
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.