Skip to the record
Search everything, all in one place.

Original source · versioned page text

2021-06-17 Ordinary Meeting Agenda

of 35

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

ORDINARY MEETING AGENDA                                                                     17 JUNE 2021


9    ORDINARY MEETING REPORTS


1    FURTHER REPORT - RAL20/0019 – APPLICATION FOR RECONFIGURATION OF A LOT
     (1 LOT INTO 2 LOTS) AND CREATION OF AN ACCESS EASEMENT AT 23 JIRIMMA
     CRESCENT, COOROIBAH

Author            Coordinator Planning, Patrick Murphy
                  Environment & Sustainable Development Department

Index             ECM/ Application/ RAL20/0019

Attachments       Nil


EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Coordinator Planning to the Planning & Environment Committee
Meeting dated 8 June 2021 regarding Application No. RAL20/0019 for a Development Permit for
Reconfiguring a Lot (1 into 2 lots), situated at 23 Jirrima Crescent, Cooroibah and:
A.   Refuse the application for the following reasons:
     1.    The proposal is not consistent with the 8.2.2.2 (1), (2)(a), (b), (c), (d), (e), (f), (g) and (i),
           Acceptable Outcomes AO6.1, AO6.2 and PO6 of the Biodiversity, Waterways and
           Wetlands Overlay as:
           a.     The proposal results in development within the Riparian Buffer Area, with the
                  proposed lot boundaries traversing the buffer area.
           b.     The proposal seeks to enhance, rehabilitate and protect only part of the identified
                  Riparian Buffer Area.
           c.     The proposed development increases the scale and intensity of development
                  within and adjacent to an ecologically important area which has the potential to
                  adversely impact on the site’s ecological values.
           d.     The proposal has the potential to result in additional clearing of vegetation in the
                  Riparian Buffer Area due to the vegetation clearing exemptions permitted by the
                  Planning Regulation 2017 and the planning scheme for lot boundaries and fencing.
     2.    The proposal is not consistent with 9.5.1.2 (1) (d) and (e) and Overall Outcomes 2(b),(c),
           Acceptable Outcome AO7.5, AO7.7 and AO7.9 and Performance Outcome PO7 of the
           Reconfiguring a Lot Code as:
           a.     The development does not provide for a lot layout that is responsive to the natural
                  environmental values present on the site.
           b.     The proposed lot boundaries traverse ecologically important areas and ecological
                  linkages.
           c.     The proposed environmental covenant area is only proposed over part of the
                  Riparian Buffer area and will not provide suitable protection to this ecologically
                  important area.
B.   Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.

                                                                                            Page 15 of 35
Log in to download the original file

2021-06-17 Ordinary Meeting Agenda(PDF, 2MB).pdf · 2.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.