NPM Submission - F Geddes - LATE - Proforma - MCU21/0110
Obitction to the Proposed Hotel
at Hoosa Springs I
f\^raut- 2r lalla
of time iust Lefore
this DA has been opened for comment for a short period
rt has not gone unnfiiced that
otherwise occupied or away'
Christrnas when rnost people are
Adamson Town Flanning Report
of the impact upon existing users of
Na anarysis has been provided in the The "material change of
incruding members and residents. This impact is significant'
Noosa Springs Rerortn parkridge, Erysium and rhe Fainaays (795
affect every person in Noosa $prings, The Oasis,
use, wirladversery
properlies), resort staff and mernbers'
The development fails so manY tests:
in
nUmber of rooms aS the French QUarter
. lt isn,t "bGutique", in fact it will have rOughly the same
Hastings str€et
e At 12m high it will visually overpawer existing buildings "recreational and open space"
r Two thirds of the development is to be built on land zoned
r lt breaches height and setback restrictions and this will be lost
r Zoning maps indiCate it is a "core Koala llabita{""a Koala Priority Habitat"
together with other fauna and flora
staff, the already existing fire evacuation
r with potentially 224 oecupants, plus children and additional
ramifications' Numerous discussions
risk will be significantly increased with potentially disastrous
issue e.g' The oasis BC Revlew of
with couneit in the past has done little to alleviate this veryserious
Ernergency Evacuation Provisions
r leaving on 2 wheels or puhlic transport"
The DA suggests that the guests and staff will be arriving and
This is just not realistic
golfers and those who uSe the spA' Bym'
An already busy carpark will be inadequate for guests, staff,
peak times and the Parking StudiEs
medical facilities, restaurant etc. lt is already over capacity at
lack meaningful analYsis
people reside and will affect
* There will be increased noise and activity in an area where many elderly
the quiet enjoyment and wetlbeing of residents and potentially their security and safety
The club house, golf course, Eym, restaurant, spa and pool will not be as available to
i
residents and
members with Tee Times likely to be at a premium as hotel gue$ts will likely be given priority
a The developers are potentially "'dcuble-dipping" as the land originally earmarked for a hottlwas used
to build Parkridge.
Many of the above serve to undermine the integrity of the Noosa PIan ?020.
I objea to the Application for the proposed hotel on the above grounds'
:}"_l
r,l -. ,*-.'
I.Jd LE
J,t* tfir^L L -7
l {
Document Set ID: 21743030
Version: 1, Version Date: 24/12/2021
[OCR of page images]
Objection to the Proposed Hotel at Noosa Springs
MCU 21 bus
it has not gone unnoticed that this DA has been opened for comment for a short period of time just before
Christmas when most people are otherwise occupied or away.
No analysis has been provided in the Adamson Town Planning Report of the impact upon existing users of
Noose Springs Resort, including members and residents. This impact is significant. The “material change of
use” will adversely affect every person in Noosa Springs, The Oasis, Parkridge, Elysium and The Fairways (795
properties), resort staff and members.
The development fails so many tests:
e itisn’t “boutique”, in fact it will have roughly the same number of rooms as the French Quarter in
Hastings Street
e Ati2m high it will visually overpower existing buildings
« Two thirds of the development is to be built on land zoned “recreational and open space”
e It breaches height and setback restrictions
* Zoning maps indicate it is 4 “Core Koala Habitat”, “a Koala Priority Habitat” and this will be lost
together with other fauna and flora
® With potentially 224 occupants, plus children and additional staff, the already existing fire evacuation
risk will be significantly increased with potentially disastrous ramifications. Numerous discussions
with Council in the past has done little to alleviate this very serious issue e.g. The Oasis BC Review of
Emergency Evacuation Provisions
* The DA suggests that the guests and staff will be arriving and leaving on 2 wheels or public transport.
This is just not realistic
e Analready busy carpark will be inadequate for guests, staff, golfers and those who use the spa, gym,
medical facilities, restaurant etc. It is already over capacity at peak times and the Parking Studies
lack meaningful analysis
s There will be increased noise and activity in an area where many elderly people reside and will affect
the quiet enjoyment and wellbeing of residents and potentially their security and safety
* The club house, golf course, gym, restaurant, spa and poo! will not be as available to residents and
members with Tee Times likely to be at a premium as hotel guests will likely be given priority
® The developers are potentially “double-dipping” as the land originally earmarked for a hotel was used
to build Parkridge.
Many of the above serve to undermine the integrity of the Noosa Plan 2020. _7
| object to the Application for the proposed hotel on the above grounds. CT
je ON
Address
Document Set ID: 21743030
Version: 1, Version Date: 24/12/2021
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (NPM Submission - F Geddes - LATE - Proforma - MCU21_0110.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.