Council archive · source document
08/0530 - Operational Works - Transport Type 5 - Domestic Marine (Jetty) [As Published] · 142008.530
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.1, 3 March 2008
IPA, schedule 8, part 1, table §, tem 1; IP Regulation, schedule 2, table 2, tem 11; iP Regulation, schedule 1, table §. item 2 (wild river area): Water Act 2000,
section 966C: Wild Rivers Act 2005, section 43A
ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA
13 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
PX] No-Gotoar4 ([] Yes
IPA, Schedule 8 part 1. table 2. tam 1 IPA, schaduie 8 part §, fable 5, dams 3 and 4, iP Regulation, schadule 2. table 2. dems | and 23: Environmental Proiection Act 1994. section
7AAA paid nver areay, Wiki Rivers Act 2005 section 434, relevant wilt aver declaration; Wik Revers Code.
WITHIN THE LIMITS OF A PORT
1.4 Is any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?
[X] No -Go 001.5
C1 Yes
IP Regulation. schedule 2, table 2, tems 18 and 16
‘DECLARED FISH HABITAT ARI . 7
1.5 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
EX] No - Goto 01.6
oO Yes - /f answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, sched
8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). If DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Advice Agency.
IP Regulation, schedule 2. table 2, item 26
(COMMUNITY INFRASTRUCTURE ™ ; ™ 4
1.6 Is any part of the premises designated for community infrastructure?
No - Goto.01.7
OD Yes
IP Regutation, schedule 2, table 3. lem 7
WASTE WATER MANAGEMENT _ I
17 Does the proposal involve the establishment or expansion of a waste water disposal system?
[X] No -End of Section? (_] Yes
IP Regulation. schedule 2, table 3, item §
SECTION 4 - Section 4 must be completed when the application seeks approval to carry out operational work.
PLANNING SCHEME ae _»
41 Is any of the proposed operational work assessable under a planning scheme?
LX] No - Goto. Q4.2 (1 Yes - (Complete Form 1, Part E) Answar Qs4.1.1 - 4.1.7 below.
ASSOCIATED WITH RECONFIGURING A LOT; RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT INA WILD RIVER J
AREA |
4.2 {s any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is also assessable?
No -Gotoa4.3 (_] Yes
IPA schedule 8, part 1, table 4, dem 2; IP Regulation, schedule 1, part 2, table 5, item tc}
Wild Rivers code (Note: the code does nat custenily contain applicable provisions for residential, industrial or commercial development inside a designated urban
area)
‘VEGETATION CLEARING; KOALA CONSERVATION; WILD RIVER AREA __ oo
43 Is any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999
applies?
DX] No -Gotoas4 (J Yes
IPA, schedule 8. part 1, lable 4. items 1A-1G: IP Regulation, schedule 2, table 2. item 5 (vegetation cleaning), IP Regulation, schedule 2, table 2, tem 3¢ (koala
conservation): IP Regulation, schedule 1. part 3. table 4. item (vegetation clearing/wild river area); Vegetation Management Act 1999, section 224 (vegetation
clearing/wild river area): Wild Rivers Act 2005, sections 1F aixt 43A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0530 - Operational Works - Transport Type 5 - Domestic Marine (Jetty) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.