1. Nature of work that requires assessment against a planning scheme:
(CZ Building work - Complete Table A IX] Operational work - Complete Table 8
Table B
(i) Whats the nature of the operational work?
(1 Roadworks {CJ Stormwater (C1) Water infrastructure (C1 Sewerage infrastructure
(7) Landscaping CD Earthworks (J Drainage Works CO Signage
(C1 Clearing vegetation under the planning scheme [X] Other - Specify befow
PONTOON FOR PRIVATE USE
(ii) What type of approval is being sought? (NOTE: if you have indicated multiple operational works in question (i) above and your answers to this
question would be different for different operational work, it may be more appropriate to provide these details in an attachment to this form)
BX) Development Permit (Preliminary approval CC] Both (specify below)
(iii) Is the operational work necessary to facilitate the creation of new lots (ie. subdivision)?
No {[] Yes - Specify the number of lots being created
(iv) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring
abl)
KX) No = [_) Yes - Complete Table Bia)
2. What is the dollar value of this operational work? (ie. the total value including GST, materials and labour) |$ 24000
9
‘Mandatory Information St , " |
3. Confirm that the following mandatory information accompanies this application
Confirmation of
lodgement - Method of todgement
Plans, andspecifications if applicable, showing the nature and location of the proposed works (including the
lextent of any cut and fit) BX) Confirmed
OFFICE USE ONLY
Date Received Reference Numbers |
Advice for completing Part E
General advice
> Part A must also be completed for all IDAS development applications.
= The applicant is responsible for answering all questions fully and correctly, untess following a response there is a statement to go directly to anather question.
Qi A development permit authorises development to occur, white a preliminary approval is a step in the approval process and does not authorise development to occur!
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0530 - Operational Works - Transport Type 5 - Domestic Marine (Jetty) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.