Skip to the record
Beware of cheap imitations.

Council archive · source document

08/0530 - Operational Works - Transport Type 5 - Domestic Marine (Jetty) [As Published] · 142008.530

of 23

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 Part E, Version 3.1, 3 March 2008

   

Form 1 Development Application

Part E

Building &/or operational works assessable
against a planning scheme

 

 

 

 

‘Nature of the works , j
1. Nature of work that requires assessment against a planning scheme:
(CZ Building work - Complete Table A IX] Operational work - Complete Table 8
Table B
(i) Whats the nature of the operational work?

(1 Roadworks {CJ Stormwater (C1) Water infrastructure (C1 Sewerage infrastructure
(7) Landscaping CD Earthworks (J Drainage Works CO Signage
(C1 Clearing vegetation under the planning scheme [X] Other - Specify befow
PONTOON FOR PRIVATE USE

 

 

 

(ii) What type of approval is being sought? (NOTE: if you have indicated multiple operational works in question (i) above and your answers to this
question would be different for different operational work, it may be more appropriate to provide these details in an attachment to this form)

BX) Development Permit (Preliminary approval CC] Both (specify below)

(iii) Is the operational work necessary to facilitate the creation of new lots (ie. subdivision)?
No {[] Yes - Specify the number of lots being created

(iv) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring
abl)

KX) No = [_) Yes - Complete Table Bia)

 

 

 

2. What is the dollar value of this operational work? (ie. the total value including GST, materials and labour) |$ 24000

9

‘Mandatory Information St , " |
3. Confirm that the following mandatory information accompanies this application

 

 

 

 

 

 

 

 

 

 

 

 

Confirmation of
lodgement - Method of todgement
Plans, andspecifications if applicable, showing the nature and location of the proposed works (including the
lextent of any cut and fit) BX) Confirmed
OFFICE USE ONLY
Date Received Reference Numbers |

 

 

 

 

Advice for completing Part E

General advice
> Part A must also be completed for all IDAS development applications.
= The applicant is responsible for answering all questions fully and correctly, untess following a response there is a statement to go directly to anather question.

 

 

Qi A development permit authorises development to occur, white a preliminary approval is a step in the approval process and does not authorise development to occur!

 

 

 

Used in these records

About this file

File size
1.7 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0530 - Operational Works - Transport Type 5 - Domestic Marine (Jetty) [As Published].pdf · 1.7 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.