 GENERAL NOTES:
 - BUILDER / SHOPFITTER TO CHECK EXISTING CONDITIONS PRIOR COMMENCEMENT OF WORK.                                                                       - ALL ITEMS REQUIRED FOR COMPLETION OF WORKS THAT MAY NOT BE MENTIONED OR DESCRIBED IN       - DEMOLITION WORKS CARRIED OUT TO BE PREPARED & READY FOR NEW WORKS AS PER                        APPROVAL PRIOR TO ORDERING
 - BUILDER/SHOP FITTER TO CONTACT & COORDINATE DIRECTLY WITH CENTRE MANAGEMENT /                                                                       DETAIL IN THE CONSTRUCTION ISSUE DRAWINGS, THAT ARE NECESSARY OR INCIDENTAL FOR THE          DOCUMENTATION DRAWINGS REQUIREMENTS & ALL SURFACES BE MADE GOOD FOR NEW WORKS.                    - REFER TO CLIENT/ EQUIPMENT SUPPLIER FOR EXACT TYPE OF EQUIPMENT/ SPECIFICATIONS & SIZE.
 LANDLORD SITE ACCESS & HOURS OF WORK & SECURITY ETC.                                                                                                  COMPLETION OF WORKS SHALL BE INCORPORATED AND MUST CONFORM TO GOOD BUILDING TRADE            - EXISTING LIGHTS, AIR REGISTERS, EMERGENCY LIGHTS AND SPRINKLERS TO REMAIN, EXCEPT WHERE         - SHOP FITTER TO CONFIRM LEAD-TIME FOR SPECIFIED PRODUCTS UPON APPOINTMENT TO PROJECT TO
 - COUNCIL /BUILDING APPROVAL APPLIES TO THESE WORKS AND IS THE RESPONSIBILITY OF OTHERS.                                                              PRACTICES & N.C.C STANDARDS , MANUFACTURES WRITTEN & RECOMMENDATIONS WHERE                   INDICATED.                                                                                        AVOID DELAYS IN COMPETITION OF WORKS.
 (UNLESS OTHERWISE ADVISED) TENANTS / BUILDER TO ARRANGE FOR FINAL INSPECTION FROM LOCAL                                                               APPLICABLE                                                                                   - FINAL LOCATIONS OF EMERGENCY LIGHTS, SWITCHBOARD TO BE IN ACCORDANCE WITH AS 2118.1             - USE NON-TOXIC LOW VOC PAINT FOR ALL PAINTED SURFACES.
 LAW AUTHORITIES IE- HEALTH/BUILDING INSPECTOR PRIOR TO OCCUPATION OF PREMISES                                                                         - ALL MANUFACTURED SYSTEMS EG. SUSPENDED CEILING SYSTEMS, SLIDING DOORS INSTALLATIONS        AUTOMATIC FIRE SPRINKLER SYSTEMS GENERAL SYSTEMS. CERTIFICATION OF THESE ALTERATIONS              - ELECTRICIAN TO INSTALL RELAY NEXT TO ALARM PANEL LOCATION IN ORDER FOR SHOPS MAIN
 - EXISTING SERVICES THAT NEED TO BE RELOCATED ,TERMINATED OR REMOVED ARE TO BE CHECKED                                                                AND THE LIKE ARE TO BE INSTALLED STRICTLY IN ACCORDANCE WITH THE MANUFACTURERS               ARE TO BE PROVIDED TO THE RELEVANT BUILDING SURVEYOR PRIOR TO OCCUPANCY PERMIT ISSUE.             LIGHTS TO COME ON WHEN AN ALARM IS ACTIVATED
 ON SITE AGAINST AND OR AGAINST ENGINEERS DRAWINGS PRIOR TO THE COMMENCEMENT OF ANY                                                                    SPECIFICATIONS FOR THAT SYSTEM.                                                              - ALL EXISTING ELECTRICAL SERVICES THAT ARE NOT INDICATED ON PLAN ARE TO BE RELOCATED AND         - ELECTRICIAN TO INSTALL PHONE LINE CONNECTION & POWER FOR ALARM PANEL NEXT TO THE PANEL
 WORKS                                                                                                                                                 - WHERE CHANGE IN CEILINGS/CEILING HEIGHTS IN EXISTING/PROPOSED APPLICATIONS - EXTEND ALL    OR REMOVED AND AREA TO BE MADE GOOD FOR NEW WORKS.                                                LOCATION.
 - DOCUMENTATION DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ANY STRUCTURAL,                                                                           MECHANICAL DUCTWORK, SPRINKLERS, HYDRAULIC SERVICES ECT. TO SUIT PROPOSED WORKS              - SHOP FITTERS COMMUNICATION CONTRACTORS TO RUN ALL CABLING FOR PHONE LINES AND TO                - ALARM CONTRACTOR TO SUPPLY AND INSTALL SECURITY CAMERAS. SHOP FITTER TO LIAISE WITH
 MECHANICAL AND ELECTRICAL ENGINEER'S DRAWINGS.                                                                                                        - DEMOLITION WORKS-PRIOR TO BEING BE CARRIED OUT IN ACCORDANCE WITH DEMOLITION CODE OF       COORDINATE WITH TELSTRA / SIMILAR APPROVED COMMUNICARIO SUPPLIERS -TO DO FINAL                    CLIENT & SECURITY CONTRACTOR FOR COORDINATION OF THESE WORKS. ALARM EQUIPMENT AND
 - EXISTING LIGHTS, AIR REGISTERS, EMERGENCY LIGHTS AND SPRINKLERS TO REMAIN, EXCEPT WHERE                                                             PRACTICE - SAFE WORK AUSTRALIA.WHS ACT . BUILDER/CONTRACTOR TO READ ANY ENGINEER'S           CONNECTION ONLY AT IDP.                                                                           CABLING WITHIN TENANCY TO BE SUPPLIED AND INSTALLED BY SECURITY CONTRACTOR.
 INDICATED.                                                                                                                                            STRUCTURAL DRAWINGS WHERE DEMOLITION REQUIRED OR ANY RESTRICTIONS TO DEMOLITION              - CLIENT TO COORDINATE THE PHONE / INTERNET LINES WITH COMMUNICATION PROVIDER.
 - BUILDER/SHOP FITTER TO PROVIDE STRUCTURAL ENGINEERS DRAWINGS , COMPUTATIONS &                                                                       WORKS REQUIRED.                                                                              - UPON KNOWLEDGE OF NON STOCKED ITEMS ANY ALTERNATIVE PRODUCTS ARE TO BE SELECTED BY                                        COUNCIL ANNOTATION:
 CERTIFICATE FOR ALL CEILING & SHOP FRONT / GLAZING WORKS AS REQUIRED.                                                                                 - REMOVE ALL EXISTING SHOP FIXTURES TO EXISTING STORE AS REQUIRED / WHERE APPLICABLE.        THE SHOP FITTER AS SOON AS POSSIBLE AND SUBMITTED TO THE DESIGNER AND CENTRE FOR
                                                                                                                                                                                                                                                                                                                                                                           Exemption Certificate EXE25/0032
 STRUCTURAL NOTES:
 - ALL SUSPENDED CEILING DESIGNS TO CONFORM WITH AS 2785- SUSPENDED CEILINGS - DESIGN AND                                                              - SHOP FITTER TO PROVIDE STRUCTURAL ENGINEERS DRAWINGS, COMPUTATIONS & CERTIFICATE FOR       - ANY STEEL STRUCTURAL WORKS TO BE IN ACCORDANCE WITH DESIGN STANDARDS AS 4100 STEEL                                only relates to the replacement of the
 INSTALLATION.                                                                                                                                         ALL SUSPENDED CEILINGS/BULKEADS/ SHOP FRONT /GLAZING WORKS AS REQUIRED.                      STRUCTURES.                                                                                                           existing roof and upgrade of ground
 FIRE NOTES:                                                                                                                                                                                                                                                                                                                                                            floor toilets from code assessment for
 - ALL COMMERCIAL BUILDINGS IN AUSTRALIA ARE REQUIRED TO MEET                                                                                          - BUILDER/ CONTRACTOR TO SUPPLY & INSTALL BUT NOT LIMITED TO - 2A4F (9L) WET CHEMICAL FIRE   - ALTERATIONS TO FIRE ALARM ARE TO BE CARRIED OUT IN ACCORDANCE WITH AS 1670. LOCATION OF         - THE NATIONAL CONSTRUCTION
                                                                                                                                                                                                                                                                                                                                                                            building  CODEworks
                                                                                                                                                                                                                                                                                                                                                                                           - FIRE SAFETY ELEMENT
                                                                                                                                                                                                                                                                                                                                                                                                     within   theMUST  BE TESTED TO CERTAIN
                                                                                                                                                                                                                                                                                                                                                                                                                     Medium
 THE STANDARDS LAID OUT IN THE BUILDING CODE OF AUSTRALIA. THIS INCLUDES STRICT                                                                        EXTINGUISHER OR 40B(E) (4.5 KG.) DRY CHEMICAL POWDER EXTINGUISHER ADJACENT TO COOKING        SMOKE DETECTOR & GENERAL SPRINKLER HEADS TO BE DETERMINED BY NOMINATED CONSULTANT                 SPECIFICATIONS (I.E. AS1530.4) ALL PROPOSED MATERIALS ARE TO MEET RESISTANCE APPROVALS
 REGULATIONS REGARDING THE FIRE SAFETY SYSTEMS AND ELEMENTS OF COMMERCIAL BUILDINGS.                                                                   EQUIPMENT AND 2A20B(E) (2KG) OR 2A 40B(E) (4.5K) DRY CHEMICAL EXTINGUISHER ADJACENT TO       ALL NEW AND ALTERATION WORK TO BE CARRIED OUT BY A REGISTERED FIRE SERVICES CONTRACTOR                                           Impact
                                                                                                                                                                                                                                                                                                                                                      AND CERTIFICATION. "FIRE RATING"            Industry
                                                                                                                                                                                                                                                                                                                                                                                        OR "FIRE RESISTANCE    Zone.
                                                                                                                                                                                                                                                                                                                                                                                                            LEVEL" (FRL). ALL PERMANENT FINISHES EG.
 ALL FIRE-RATED MATERIALS USED IN COMMERCIAL BUILDINGS MUST COMPLY WITH AS4072.1 AND                                                                   ELECTRICAL SWITCHBOARD IN ACCORDANCE TO AS. 2444 & BCA E1.6. TENANT CONTRACTOR TO            AND ARE TO COMPLY STRICTLY WITH AS 1668.2 7 AS3666.1                                              VINYL, FABRICS/LAMINATES/ACOUSTIC CEILING TILES/ FLOORING MATERIALS - WALL MATERIALS
 AS1530.4.                                                                                                                                             INSTALL APPROPRIATE SIGNAGE AS REQUIRED                                                      - ENSURE SPRINKLER HEADS NOT TO BE PAINTED.                                                       -CLADDING ETC ARE REQUIRED TO COMPLY WITH SPECIFICATION C1.10 OF THE BCA / NCC

 MECHANICAL NOTES:
 - ANY ALTERATIONS TO THE MECHANICAL VENTILATION AND EXHAUST SYSTEM TO BE CARRIED OUT IN                                                               Mechanical ventilation for acceptable indoor-air quality AS 3666.1 & AS 1668.2.              CONTRACTORS/CONSULTANTS BASED ON THERE ADVISE AND OR DRAWINGS/REPORTS/SPECIFICATIONS              PROVIDED TO THE RELEVANT BUILDING SURVEYOR PRIOR TO OCCUPANCY PERMIT ISSUE.
 ACCORDANCE WITH AS 1668 & AS 3666. & NCC PART 3.8.5 HEALTH & AMMENITITY - VENTILATION.                                                                - CERTIFICATION OF THESE ALTERATIONS ARE TO BE PROVIDED TO THE RELEVANT BUILDING SURVEYOR    PROVIDED -WHERE APPLICABLE .
 - ALTERATIONS TO THE MECHANICAL VENTILATION SYSTEM ARE TO BE CARRIED OUT IN ACCORDANCE                                                                PRIOR TO OCCUPANCY PERMIT ISSUE.                                                             - ALTERATIONS TO THE SPRINKLER SYSTEM ARE TO BE CARRIED OUT IN ACCORDANCE WITH AS 2118.1
 WITH THE USE OF MECHANICAL VENTILATION AND AIR - CONDITIONING IN BUILDINGS PART 2:                                                                    - MODIFICATIONS TO MECHANICAL/ SPRINKLER SERVICES TO BE ADVISED BY THE RELEVANT              BY A REGISTERED FIRE SERVICE CONTRACTOR. CERTIFICATION OF THESE ALTERATIONS ARE TO BE
 HYDRAULIC / WATERPROOFING NOTES:
 - ENSURE THAT ALL HYDRAULIC WORKS COMPLY WITH RELEVANT AUSTRALIAN STANDARDS AND BCA                                                                   - WET AREAS TO BE IMPERVIOUS TO WATER IF WITHIN 75MM OF A WALL TO A HEIGHT OF 150MM          - BATHROOM, SHOWER, SINK , LAUNDRY OR SANITARY COMPARTMENT TO BE WATER RESISTANT OR               - INTERNAL HOT WATER SYSTEMS ARE TO BE MOUNTED ON METAL LEGS 200MM ABOVE FFL. OR AS
 /N.C.C WATERPROOFINGS MEMBRANES Part 1 Materials (AS 4654.1-2012) IS TO ENSURE THAT THE                                                               ABOVE FIXTURES.WATERPROOF MEMBRANE TO BE INSTALLED AS REQUIRED                               WATER PROOF IN ACCORDANCE WITH AS 3740                                                            REQUIRED BY MANUFACTURER.
 MATERIAL PROPERTY OF THE MEBRANE IS WATERPROOF - IMPERVIOUS TO MOISTURE , AND REMAINS                                                                 - PROVIDE WATER PROOF MEMBRANE & OR WATERPROOF SEALER TO FULL EXTENT OF WET AREAS /          - HAND WASH BASIN TO HAVE FLOW CONTROL OF 2L/MIN WITH TIME CONTROL OF 7.5 SECONDS. EACH           - TOILETS TO BE DUAL FLUSH WITH MAXIMUM OF 3.5 L FLUSH.
 WATERPROOF UNDER A VARIETY OF SITUATIONS EXPOSURES AND CONDITIONS.                                                                                    WALLS & FLOOR SURFACE- WRAP MEMBRANE UP WALLS 1 METER MIN FROM FFL.                          HAND WASH BASIN MUST BE PROVIDED WITH A LIQUID SOAP DISPENSER TOGETHER WITH A HAND                - ALL MR MDF MATERIALS TO BE USED IN WET ARES /WATER RESISTANT TO WET AREAS.
 - BATHROOM, SHOWER, SLOP HOPPER, SINK COMPARTMENT, LAUNDRY OR SANITARY COMPARTMENT                                                                    - ALL WALL AREAS IN WET AREAS , ARE TO BE FINISHED WITH SUITABLE IMPERVIOUS MATERIAL TO A    TOWEL DISPENSER
 TO BE WATER RESISTANT OR WATER PROOF IN ACCORDANCE WITH AS 3740. & NCC PART 3.8.1 HEALTH                                                              MINIMUM HEIGHT OF 1.8M ABOVE FFL. WALL AREAS ABOVE 1.8M ARE REQUIRED TO BE PAINTED WITH      - MEDIUM USE KITCHEN SINK TAP TO HAVE FLOW CONTROL OF MAXIMUM 8L/MIN WITH ACTUATED
 & AMENITY -WET AREAS AND EXTERNAL WATERPROOFING                                                                                                       WASHABLE PAINT                                                                               CONTROL.
 ELECTRICAL / LIGHTING COMPLIANCE:
 - ALL ARTIFICIAL LIGHTING TO COMPLY WITH AS 1680 INTERIOR ADN WORKPLACE LIGHTING & NCC                                                                AS 3000.ELECTRICAL INSTALLATIONS (KNOWN AS THE AUSTRALIAN / NEW ZEALAND WIRING RULES).       - EXIT & EMERGENCY LIGHT TO BE ON SEPARATE CIRCUIT & HAVE SEPARATE TIMER FOR TESTING.             - SWITCHING OF LIGHTS TO BE ZONED AS INDICATED ON DRAWINGS OR TO BE CONFIRMED WITH
 PART J6.2 ARITIFICIAL LIGHTING REQUIREMENTS AND POWER & PART 3.8.4 HEALTH & AMMENITY -                                                                - ANY ELECTRICAL OUTLET REQUIRED FOR CLIENT SUPPLIED EQUIPMENT - REFER TO THE                - BUILDER TO SUPPLY & INSTALL EMERGENCY LIGHTS & EXIT LIGHTS.WHERE APPLICABLE.                    DESIGNER
 LIGHT. LIGHTING AT ENTRANCES THAT HAS A HIGHER LUX LEVEL THAN THE SURROUNDING LIGHTING                                                                MANUFACTURES /SUPPLIERS REQUIRMENTS SPECIFIC LOCATIONS OF THE GPO/DATA OUTLETS. ALLOW        - ALL ELECTRICAL INSTALLATIONS MUST BE INSTALLED ACCORDING TO AUSTRALIAN STANDARDS AS             - PROVIDE AFTER HOURS DISPLAY LIGHTING TO SHOP FRONT AND INTERNAL DISPLAY COLUMNS.
 TO ASSIST WITH IDENTIFICATION AND SAFETY.                                                                                                             FOR SUPPLY AND INSTALLATION OF ALL GPOS/DATA TO ALL EQUIPMENT/MACHINERY REQUIRING            3000.                                                                                             WHERE APPLICABLE/TIMER TO BE FITTED TO AFTER HOURS LIGHTING WHERE/IF REQUIRED.
 - LIGHTING LAYOUT TO BE APPROVED BY TENANT (CLIENT) & TENANT TO ENGAGE A LIGHTING ENGINEER                                                            POWER/DATA . CONFIRM ALL GPO/DATA LOCATIONS WITHIN JOINERY UNITS WITH THE CLIENT             - ALL EXISTING ELECTRICAL SERVICES THAT ARE NOT INDICATED ON PLAN ARE TO BE RELOCATED AND         - EMERGENCY LIGHTS & EXIT SIGNS TO BE IN ACCORDANCE WITH BCA E4.2,E4.4, E4.5, E4.6, AND AS
 TO PREPARE APPROPRIATELY DESIGNED LIGHTING LAYOUT .                                                                                                   PRIOR TO INSTALLATION/CONSTRUCTION. ALL ELECTRICAL / DATA WIRING/OTHER CABLING TO BE         OR REMOVED AND AREA TO BE MADE GOOD FOR NEW WORKS.                                                2293.1
 - INSTALLATION OF EMERGENCY LIGHTING & ILLUMINATED EXIT SIGNS TO BE IN ACCORDANCE WITH AS                                                             CONCEALED WITHIN WALLS/FLOORS / JOINERY WHERE REQUIRED.IF CHASING REQUIRED TO FLOOR          - NEW SWITCHBOARDS LOCATED WITHIN A PATH OF TRAVEL TO AN EXIT ARE TO ENCLOSED IN NON
 2293. ALL ELECTRICAL INSTALLATIONS MUST BE INSTALLED ACCORDING TO AUSTRALIAN STANDARDS                                                                -STRUCTURAL ENGINEERS TO CHECK IF CAN BE ACHIEVED WITHIN STRUCTURE.                          COMBUSTIBLE CONSTRUCTION WITH SMOKE PROOF DOORS. (WHERE APPLICABLE).
 DDA / ACCESSIBILITY / EGRESS / DOORS / RAMPS & STAIRS:
 - NEW BUILDINGS, AND EXISTING BUILDINGS UNDERGOING BUILDING WORK, MUST                                                                                TO BE CAPABLE OF BEING OPENED AT ALL TIMES FROM THE SIDE FACING THE PERSON SEEKING EGRESS    ANY FULLY GLAZED DOOR OR GLASS WALL THAT COULD BE MISTAKEN FOR AN ENTRANCE. A MINIMUM             CLOSING.
 COMPLY WITH THE COMMONWEALTH DISABILITY (ACCESS TO PREMISES - BUILDINGS)                                                                              FROM THE BUILDING WITH A SINGLE HANDED DOWNWARD ACTION ON A SINGLE DEVICE WITHOUT THE        30% LUMINANCE CONTRAST TO THE BACKGROUND IS ALSO REQUIRED. A MAXIMUM FORCE OF 20N AT              - A 1M CLEAR PATH IS REQUIRED TO BE MAINTAINED THROUGHOUT TENANCY AS A MINIMUM UNLESS
 STANDARDS 2010 (PREMISES STANDARDS) THE                                                                                                               USE OF A KEY AND LOCATED BETWEEN 900MM AND 1200MM ABOVE FFL IN ACCORDANCE WITH CLAUSE        THE ENTRANCE DOOR HANDLE TO OPEN DOORS, AND DOOR CLOSERS THAT ARE ADJUSTABLE.                     OTHERWISE REQUIRED TO COMPLY WITH CIRCULATION. A CONTINUOUS ACCESSIBLE PATH OF TRAVEL
 PREMISES STANDARDS HAVE BEEN MADE UNDER THE COMMONWEALTH DISABILITY                                                                                   D2.21, BCA 2016 Volume 1 Amendment 1.                                                        ANY ENTRANCE BUZZER OR INTERCOM 900 - 1100mm HIGH.                                                FROM THE PROPERTY ENTRANCE AND ANY ONSITE CAR PARK TO PRINCIPAL ENTRANCES.
 DISCRIMINATION ACT 1992 (DDA)                                                                                                                         - DOOR HANDLES WITH 35MM AND NOT MORE THAN 45MM CLEARANCE BETWEEN THE HANDLE (IN THE         - INSTALL WEATHER STRIPS TO THE BOTTOM OF ALL EXTERNAL DOORS (IF APPLICABLE) (FOR                 - ENTRANCE DOORS THAT CAN BE OPENED FROM THE OUTSIDE OF A ROOM IN AN EMERGENCY.
 - ACCESS PROVISION PERFORMANCE REQUIREMENT TO BE THAT CONTAINED IN SECTION D, PART E3                                                                 CENTRE) AND THE BACK PLATE OR DOOR FACE                                                      EXTERNALLY FACING TENANCIES) & TO NEW DOORS ONLY                                                  - DOOR CONTROLS THAT CAN BE REACHED BY A PERSON WHEN STANDING OR
 AND PART F2 OF THE BCA FOR WHICH THERE IS AN EQUIVALENT PERFORMANCE REQUIREMENT IN THE                                                                D OD D STYLE DOOR HANDLE WITH RETURN, INSTALLED AT HEIGHT OF 900 - 1100mm ABOVE FLOOR        - RAMPS TO BE CONSTRUCTED ACCORDING TO AS 1428.1- 2009 & N.C.C Part 3.9.1 Stairway and ramp       SEATED AND USED WITH A CLOSED FIST OR OPEN PALM AND INCORPORATING RAISED TACTILE AND
 ACCESS CODE WITHIN THE MEANING OF THE PREMISES STANDARDS. THE ACCESS CODE REFERENCES                                                                  LEVEL                                                                                        construction - SAFE MOVEMENT AND ACCESS / STAIRWAY & RAMP CONSTRUCTION                            BRAILLE ELEMENTS, FOR EXAMPLE, ENTRY BUZZER AND AFTER HOURS ACCESS.
 DP1, DP4, DP6, DP8 AND DP9                                                                                                                            A MINIMUM 850MM CLEAR OPENING WIDTH AT ENTRANCES WITH CIRCULATION SPACE ON BOTH SIDES        - ALL DO0RS AND WINDOWS RO BE INSTALLED IN ACCORDANCE WITH AS2047.1-1996 - DOORS AND              - EXIT DOORS WHICH SWING AGAINST THE DIRECTION OF EXIT TRAVEL ARE TO BE CAPABLE OF BEING
 RAMPS TO MEET CIRCULATION SPACES AND ANGLES OF APPROACH AT DOORWAYS IN ACCORDANCE                                                                     THAT CONSIDERS ANGLES OF APPROACH AND INCORPORATES LEVEL LANDINGS (INCLUDING THE             WINDOWS / WINDOWS IN BUILDINGS - SELECTION AND INSTALLATION.                                      HELD IN AN OPEN POSITION.
 WITH THE RANGE IN AUSTRALIAN STANDARDS.                                                                                                               OPERATIVE LEAF OF A MULTIPLE LEAF DOOR). SOLID STRIP A MINIMUM OF 75MM WIDE INSTALLED        - DOOR CONTROLS THAT ARE LOCATED ON THE PATH OF TRAVEL TO THE DOOR, TO ALLOW ADEQUATE
 - ALL EXIT DOORS AND DOOR IN THE PATH OF TRAVEL TO EXITS (INCLUDING ROLLER SHUTTERS) ARE                                                              WITH THE LOWER EDGE AT A HEIGHT OF 900 - 1000mm ABOVE FLOOR LEVEL ACROSS THE WIDTH OF        TIME WHEN IN OPERATION FOR A PERSON TO MOVE FULLY THROUGH THE DOOR PRIOR TO THE DOOR
 WALLS:
 - ALL EXISTING PLASTERBOARD STUD WALLS TO BE RE SANDED & PREPARED                                                                                     AVOID DIFFERENTIAL SHRINKAGE BETWEEN DISSIMILAR MATERIALS, E.G. STEEL TO TIMBER; TIMBER TO          - Part C1: Fire resistance and stability                                                   AS1170.2 STRUCTURAL DESIGN ACTIONS - WIND ACTIONS
 TO BE REPAINTED.                                                                                                                                      MASONRY; AND - ALLOWING FOR SHRINKAGE WITH RESPECT TO PLUMBING. IT IS RECOMMENDED THAT              - Part C2 - Compartmentalisation & separation                                              AS1170.4 STRUCTURAL DESIGN ACTIONS - EARTHQUAKE ACTIONS
 - TIMBER FRAMING SHALL COMPLY WITH AS 1684 AS APPLICABLE. MUST BE CONSTRUCTED USING                                                                   A PROFESSIONAL STRUCTURAL ENGINEER BE EMPLOYED TO ADDRESS THE ABOVE ISSUES AND                      - Part C3 - Protection of openings                                                         AS1720.1 TIMBER STRUCTURES - DESIGN METHODS
 SPECIFIC METHODS FOR ATTACHMENT OF LININGS TO ACHIEVE FIRE RATINGS GREATER POTENTIAL FOR                                                              STRUCTURAL PERFORMANCE IN GENERAL.                                                           - THE FOLLOWING STANDARDS AND GUIDELINES SHOULD BE CALLED UPON TO ASSIST:
 SHRINKAGE IN TALLER TIMBER BUILDINGS. SHRINKAGE CAN BE MINIMISED BY: - UNSEASONED TIMBER                                                              - FIRE - DESIGN REQUIREMENTS Deemed to Satisfy Provisions that meet the above Performance    AS1170.0 STRUCTURAL DESIGN ACTIONS - GENERAL PRINCIPLES
 OR ENGINEERED TIMBER; CONSTRUCTION BEARERS & JOISTS AT THE SAME PLANE- DETAILING TO                                                                   Requirements are detailed in the BCA under:                                                  AS1170.1 STRUCTURAL DESIGN ACTIONS - PERMANENT, IMPOSED AND OTHER ACTIONS (2002)
 GLAZING:
 - ALL GLAZING TO COMPLY WITH AS 1288,& AS 2047 & SECTION 'J' - GLASS IN BUILDINGS - SELECTION                                                         - VISUAL INDICATORS ON GLAZING AS PER AS1428.1:2009 WHERE THERE IS NO CHAIR RAIL, HANDRAIL   SHALL BE NOT LESS THAN 75 MM WIDE AND SHALL EXTEND ACROSS THE FULL WIDTH OF THE GLAZING           WHEN VIEWED AGAINST THE FLOOR SURFACE OR SURFACES WITHIN 2 M OF THE GLAZING ON THE
 AND INSTALLATION.                                                                                                                                     OR TRANSOM, ALL FRAMELESS OR FULLY GLAZED DOORS, SIDELIGHTS, INCLUDING ANY GLAZING           PANEL. THE LOWER EDGE OF THE CONTRASTING LINE SHALL BE LOCATED                                    OPPOSITE SIDE. FROSTED OR TRANSPARENT FILMS MUST NOT BE USED.
 - SHOP FITTER TO PROVIDE STRUCTURAL ENGINEERS DRAWINGS , COMPUTATIONS & CERTIFICATE FOR                                                               CAPABLE OF BEING MISTAKEN FOR A DOORWAY OR OPENING, SHALL BE CLEARLY MARKED FOR THEIR        BETWEEN 900 MM AND 1000 MM ABOVE THE PLANE OF THE FINISHED FLOOR LEVEL.                           - ENSURE ALL EDGES ARE BEVELED AND POLISHED SMOOTH. (WHERE APPLICABLE).
 GLAZING WORKS                                                                                                                                         FULL WIDTH WITH A SOLID AND NON-TRANSPARENT CONTRASTING LINE. THE CONTRASTING LINE           - ANY CONTRASTING LINE ON THE GLAZING SHALL PROVIDE A MINIMUM OF 30% LUMINANCE CONTRAST



                                                                                                                                                                                                                                               NOOSA COUNCIL
                                                                                                                                                                                                                                            REFERENCE DOCUMENT
                                                                                                                                                                                                                                            EXE25/0032 25 AUG 2025
                                                                                                                                                                                                                                                                                                                                                  PROJECT                                                            ISSUE: FOR CONSTRUCTION
  GENERAL NOTES                                                                                                           No. AMENDMENT                                       DATE           IN ASSOCIATION WITH:                                                                                                                                                                                   project :
  Architectural documents to be read in conjunction with relevant Structural, Fire Service, Mechanical, Hydraulic,                                                                                                                                                                                                                            JANE PROPERTY
  Electrical, Civil and Landscaping documents. Technical drawings to be read in conjunction with appropriate              C1   TITLE BLOCK REVISED; ISSUED FOR CONSTRUCTION     09.12.2024                                                                                                                                                                                                                                        Project No.        Drawing No.
  sections of technical specification.
                                                                                                                                                                                                                                                                                                                                             144 Eumundi Noosa Rd, Noosaville QLD 4566 address :                 AS74
  Contractor to verify all dimensions / condition on site prior to commencement of works. Contractor to seek
                                                                                                                                                                                                                                                                                                                                                                                                                                   Total Area
  clarification of all inconsistencies and resolve all discrepancies on plans and site conditions prior to
                                                                                                                                                                                                                                                                                                                                                                                                description :    -                              A001
  commencement of any works on site. Commencement of works on site by the contractor is deemed to be
  acceptance of all conditions and plans and any variations will be the responsibility of the contractor expense.                                                                                   INTERNATIONAL                                                                                                                                                                                                                 First Drawn                 Scale   Revision
  Figured dimensions shall take precedence to scaled dimensions.                                                                                                                                     TOTAL PROPERTY DEVELOPMENT SOLUTIONS                                                                                                                                                      drawing title :   September 2024
  Copyright of designs shown herein is retained by Allister Sarris. Written authority is required for any reproduction.
                                                                                                                                                                                                                                                                                                                                              GENERAL NOTES                                                                       Date Issued            Paper Size
  Notify SARRIS ARCHITECTURE of any changes. No changes to occur without SARRIS approval.
Document Set ID: 24027286                                                                                                                                                                    CHECKED BY: S.E. HARDY (QBSA LICENCE NUMBER 65539)                                                                                                                                                                  -                              A3                    C1
Version: 1, Version Date: 13/08/2025
Log in to download the original file

Reference Document - EXE25 0032 (As Published).pdf · 3.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.