GENERAL NOTES:
- BUILDER / SHOPFITTER TO CHECK EXISTING CONDITIONS PRIOR COMMENCEMENT OF WORK. - ALL ITEMS REQUIRED FOR COMPLETION OF WORKS THAT MAY NOT BE MENTIONED OR DESCRIBED IN - DEMOLITION WORKS CARRIED OUT TO BE PREPARED & READY FOR NEW WORKS AS PER APPROVAL PRIOR TO ORDERING
- BUILDER/SHOP FITTER TO CONTACT & COORDINATE DIRECTLY WITH CENTRE MANAGEMENT / DETAIL IN THE CONSTRUCTION ISSUE DRAWINGS, THAT ARE NECESSARY OR INCIDENTAL FOR THE DOCUMENTATION DRAWINGS REQUIREMENTS & ALL SURFACES BE MADE GOOD FOR NEW WORKS. - REFER TO CLIENT/ EQUIPMENT SUPPLIER FOR EXACT TYPE OF EQUIPMENT/ SPECIFICATIONS & SIZE.
LANDLORD SITE ACCESS & HOURS OF WORK & SECURITY ETC. COMPLETION OF WORKS SHALL BE INCORPORATED AND MUST CONFORM TO GOOD BUILDING TRADE - EXISTING LIGHTS, AIR REGISTERS, EMERGENCY LIGHTS AND SPRINKLERS TO REMAIN, EXCEPT WHERE - SHOP FITTER TO CONFIRM LEAD-TIME FOR SPECIFIED PRODUCTS UPON APPOINTMENT TO PROJECT TO
- COUNCIL /BUILDING APPROVAL APPLIES TO THESE WORKS AND IS THE RESPONSIBILITY OF OTHERS. PRACTICES & N.C.C STANDARDS , MANUFACTURES WRITTEN & RECOMMENDATIONS WHERE INDICATED. AVOID DELAYS IN COMPETITION OF WORKS.
(UNLESS OTHERWISE ADVISED) TENANTS / BUILDER TO ARRANGE FOR FINAL INSPECTION FROM LOCAL APPLICABLE - FINAL LOCATIONS OF EMERGENCY LIGHTS, SWITCHBOARD TO BE IN ACCORDANCE WITH AS 2118.1 - USE NON-TOXIC LOW VOC PAINT FOR ALL PAINTED SURFACES.
LAW AUTHORITIES IE- HEALTH/BUILDING INSPECTOR PRIOR TO OCCUPATION OF PREMISES - ALL MANUFACTURED SYSTEMS EG. SUSPENDED CEILING SYSTEMS, SLIDING DOORS INSTALLATIONS AUTOMATIC FIRE SPRINKLER SYSTEMS GENERAL SYSTEMS. CERTIFICATION OF THESE ALTERATIONS - ELECTRICIAN TO INSTALL RELAY NEXT TO ALARM PANEL LOCATION IN ORDER FOR SHOPS MAIN
- EXISTING SERVICES THAT NEED TO BE RELOCATED ,TERMINATED OR REMOVED ARE TO BE CHECKED AND THE LIKE ARE TO BE INSTALLED STRICTLY IN ACCORDANCE WITH THE MANUFACTURERS ARE TO BE PROVIDED TO THE RELEVANT BUILDING SURVEYOR PRIOR TO OCCUPANCY PERMIT ISSUE. LIGHTS TO COME ON WHEN AN ALARM IS ACTIVATED
ON SITE AGAINST AND OR AGAINST ENGINEERS DRAWINGS PRIOR TO THE COMMENCEMENT OF ANY SPECIFICATIONS FOR THAT SYSTEM. - ALL EXISTING ELECTRICAL SERVICES THAT ARE NOT INDICATED ON PLAN ARE TO BE RELOCATED AND - ELECTRICIAN TO INSTALL PHONE LINE CONNECTION & POWER FOR ALARM PANEL NEXT TO THE PANEL
WORKS - WHERE CHANGE IN CEILINGS/CEILING HEIGHTS IN EXISTING/PROPOSED APPLICATIONS - EXTEND ALL OR REMOVED AND AREA TO BE MADE GOOD FOR NEW WORKS. LOCATION.
- DOCUMENTATION DRAWINGS ARE TO BE READ IN CONJUNCTION WITH ANY STRUCTURAL, MECHANICAL DUCTWORK, SPRINKLERS, HYDRAULIC SERVICES ECT. TO SUIT PROPOSED WORKS - SHOP FITTERS COMMUNICATION CONTRACTORS TO RUN ALL CABLING FOR PHONE LINES AND TO - ALARM CONTRACTOR TO SUPPLY AND INSTALL SECURITY CAMERAS. SHOP FITTER TO LIAISE WITH
MECHANICAL AND ELECTRICAL ENGINEER'S DRAWINGS. - DEMOLITION WORKS-PRIOR TO BEING BE CARRIED OUT IN ACCORDANCE WITH DEMOLITION CODE OF COORDINATE WITH TELSTRA / SIMILAR APPROVED COMMUNICARIO SUPPLIERS -TO DO FINAL CLIENT & SECURITY CONTRACTOR FOR COORDINATION OF THESE WORKS. ALARM EQUIPMENT AND
- EXISTING LIGHTS, AIR REGISTERS, EMERGENCY LIGHTS AND SPRINKLERS TO REMAIN, EXCEPT WHERE PRACTICE - SAFE WORK AUSTRALIA.WHS ACT . BUILDER/CONTRACTOR TO READ ANY ENGINEER'S CONNECTION ONLY AT IDP. CABLING WITHIN TENANCY TO BE SUPPLIED AND INSTALLED BY SECURITY CONTRACTOR.
INDICATED. STRUCTURAL DRAWINGS WHERE DEMOLITION REQUIRED OR ANY RESTRICTIONS TO DEMOLITION - CLIENT TO COORDINATE THE PHONE / INTERNET LINES WITH COMMUNICATION PROVIDER.
- BUILDER/SHOP FITTER TO PROVIDE STRUCTURAL ENGINEERS DRAWINGS , COMPUTATIONS & WORKS REQUIRED. - UPON KNOWLEDGE OF NON STOCKED ITEMS ANY ALTERNATIVE PRODUCTS ARE TO BE SELECTED BY COUNCIL ANNOTATION:
CERTIFICATE FOR ALL CEILING & SHOP FRONT / GLAZING WORKS AS REQUIRED. - REMOVE ALL EXISTING SHOP FIXTURES TO EXISTING STORE AS REQUIRED / WHERE APPLICABLE. THE SHOP FITTER AS SOON AS POSSIBLE AND SUBMITTED TO THE DESIGNER AND CENTRE FOR
Exemption Certificate EXE25/0032
STRUCTURAL NOTES:
- ALL SUSPENDED CEILING DESIGNS TO CONFORM WITH AS 2785- SUSPENDED CEILINGS - DESIGN AND - SHOP FITTER TO PROVIDE STRUCTURAL ENGINEERS DRAWINGS, COMPUTATIONS & CERTIFICATE FOR - ANY STEEL STRUCTURAL WORKS TO BE IN ACCORDANCE WITH DESIGN STANDARDS AS 4100 STEEL only relates to the replacement of the
INSTALLATION. ALL SUSPENDED CEILINGS/BULKEADS/ SHOP FRONT /GLAZING WORKS AS REQUIRED. STRUCTURES. existing roof and upgrade of ground
FIRE NOTES: floor toilets from code assessment for
- ALL COMMERCIAL BUILDINGS IN AUSTRALIA ARE REQUIRED TO MEET - BUILDER/ CONTRACTOR TO SUPPLY & INSTALL BUT NOT LIMITED TO - 2A4F (9L) WET CHEMICAL FIRE - ALTERATIONS TO FIRE ALARM ARE TO BE CARRIED OUT IN ACCORDANCE WITH AS 1670. LOCATION OF - THE NATIONAL CONSTRUCTION
building CODEworks
- FIRE SAFETY ELEMENT
within theMUST BE TESTED TO CERTAIN
Medium
THE STANDARDS LAID OUT IN THE BUILDING CODE OF AUSTRALIA. THIS INCLUDES STRICT EXTINGUISHER OR 40B(E) (4.5 KG.) DRY CHEMICAL POWDER EXTINGUISHER ADJACENT TO COOKING SMOKE DETECTOR & GENERAL SPRINKLER HEADS TO BE DETERMINED BY NOMINATED CONSULTANT SPECIFICATIONS (I.E. AS1530.4) ALL PROPOSED MATERIALS ARE TO MEET RESISTANCE APPROVALS
REGULATIONS REGARDING THE FIRE SAFETY SYSTEMS AND ELEMENTS OF COMMERCIAL BUILDINGS. EQUIPMENT AND 2A20B(E) (2KG) OR 2A 40B(E) (4.5K) DRY CHEMICAL EXTINGUISHER ADJACENT TO ALL NEW AND ALTERATION WORK TO BE CARRIED OUT BY A REGISTERED FIRE SERVICES CONTRACTOR Impact
AND CERTIFICATION. "FIRE RATING" Industry
OR "FIRE RESISTANCE Zone.
LEVEL" (FRL). ALL PERMANENT FINISHES EG.
ALL FIRE-RATED MATERIALS USED IN COMMERCIAL BUILDINGS MUST COMPLY WITH AS4072.1 AND ELECTRICAL SWITCHBOARD IN ACCORDANCE TO AS. 2444 & BCA E1.6. TENANT CONTRACTOR TO AND ARE TO COMPLY STRICTLY WITH AS 1668.2 7 AS3666.1 VINYL, FABRICS/LAMINATES/ACOUSTIC CEILING TILES/ FLOORING MATERIALS - WALL MATERIALS
AS1530.4. INSTALL APPROPRIATE SIGNAGE AS REQUIRED - ENSURE SPRINKLER HEADS NOT TO BE PAINTED. -CLADDING ETC ARE REQUIRED TO COMPLY WITH SPECIFICATION C1.10 OF THE BCA / NCC
MECHANICAL NOTES:
- ANY ALTERATIONS TO THE MECHANICAL VENTILATION AND EXHAUST SYSTEM TO BE CARRIED OUT IN Mechanical ventilation for acceptable indoor-air quality AS 3666.1 & AS 1668.2. CONTRACTORS/CONSULTANTS BASED ON THERE ADVISE AND OR DRAWINGS/REPORTS/SPECIFICATIONS PROVIDED TO THE RELEVANT BUILDING SURVEYOR PRIOR TO OCCUPANCY PERMIT ISSUE.
ACCORDANCE WITH AS 1668 & AS 3666. & NCC PART 3.8.5 HEALTH & AMMENITITY - VENTILATION. - CERTIFICATION OF THESE ALTERATIONS ARE TO BE PROVIDED TO THE RELEVANT BUILDING SURVEYOR PROVIDED -WHERE APPLICABLE .
- ALTERATIONS TO THE MECHANICAL VENTILATION SYSTEM ARE TO BE CARRIED OUT IN ACCORDANCE PRIOR TO OCCUPANCY PERMIT ISSUE. - ALTERATIONS TO THE SPRINKLER SYSTEM ARE TO BE CARRIED OUT IN ACCORDANCE WITH AS 2118.1
WITH THE USE OF MECHANICAL VENTILATION AND AIR - CONDITIONING IN BUILDINGS PART 2: - MODIFICATIONS TO MECHANICAL/ SPRINKLER SERVICES TO BE ADVISED BY THE RELEVANT BY A REGISTERED FIRE SERVICE CONTRACTOR. CERTIFICATION OF THESE ALTERATIONS ARE TO BE
HYDRAULIC / WATERPROOFING NOTES:
- ENSURE THAT ALL HYDRAULIC WORKS COMPLY WITH RELEVANT AUSTRALIAN STANDARDS AND BCA - WET AREAS TO BE IMPERVIOUS TO WATER IF WITHIN 75MM OF A WALL TO A HEIGHT OF 150MM - BATHROOM, SHOWER, SINK , LAUNDRY OR SANITARY COMPARTMENT TO BE WATER RESISTANT OR - INTERNAL HOT WATER SYSTEMS ARE TO BE MOUNTED ON METAL LEGS 200MM ABOVE FFL. OR AS
/N.C.C WATERPROOFINGS MEMBRANES Part 1 Materials (AS 4654.1-2012) IS TO ENSURE THAT THE ABOVE FIXTURES.WATERPROOF MEMBRANE TO BE INSTALLED AS REQUIRED WATER PROOF IN ACCORDANCE WITH AS 3740 REQUIRED BY MANUFACTURER.
MATERIAL PROPERTY OF THE MEBRANE IS WATERPROOF - IMPERVIOUS TO MOISTURE , AND REMAINS - PROVIDE WATER PROOF MEMBRANE & OR WATERPROOF SEALER TO FULL EXTENT OF WET AREAS / - HAND WASH BASIN TO HAVE FLOW CONTROL OF 2L/MIN WITH TIME CONTROL OF 7.5 SECONDS. EACH - TOILETS TO BE DUAL FLUSH WITH MAXIMUM OF 3.5 L FLUSH.
WATERPROOF UNDER A VARIETY OF SITUATIONS EXPOSURES AND CONDITIONS. WALLS & FLOOR SURFACE- WRAP MEMBRANE UP WALLS 1 METER MIN FROM FFL. HAND WASH BASIN MUST BE PROVIDED WITH A LIQUID SOAP DISPENSER TOGETHER WITH A HAND - ALL MR MDF MATERIALS TO BE USED IN WET ARES /WATER RESISTANT TO WET AREAS.
- BATHROOM, SHOWER, SLOP HOPPER, SINK COMPARTMENT, LAUNDRY OR SANITARY COMPARTMENT - ALL WALL AREAS IN WET AREAS , ARE TO BE FINISHED WITH SUITABLE IMPERVIOUS MATERIAL TO A TOWEL DISPENSER
TO BE WATER RESISTANT OR WATER PROOF IN ACCORDANCE WITH AS 3740. & NCC PART 3.8.1 HEALTH MINIMUM HEIGHT OF 1.8M ABOVE FFL. WALL AREAS ABOVE 1.8M ARE REQUIRED TO BE PAINTED WITH - MEDIUM USE KITCHEN SINK TAP TO HAVE FLOW CONTROL OF MAXIMUM 8L/MIN WITH ACTUATED
& AMENITY -WET AREAS AND EXTERNAL WATERPROOFING WASHABLE PAINT CONTROL.
ELECTRICAL / LIGHTING COMPLIANCE:
- ALL ARTIFICIAL LIGHTING TO COMPLY WITH AS 1680 INTERIOR ADN WORKPLACE LIGHTING & NCC AS 3000.ELECTRICAL INSTALLATIONS (KNOWN AS THE AUSTRALIAN / NEW ZEALAND WIRING RULES). - EXIT & EMERGENCY LIGHT TO BE ON SEPARATE CIRCUIT & HAVE SEPARATE TIMER FOR TESTING. - SWITCHING OF LIGHTS TO BE ZONED AS INDICATED ON DRAWINGS OR TO BE CONFIRMED WITH
PART J6.2 ARITIFICIAL LIGHTING REQUIREMENTS AND POWER & PART 3.8.4 HEALTH & AMMENITY - - ANY ELECTRICAL OUTLET REQUIRED FOR CLIENT SUPPLIED EQUIPMENT - REFER TO THE - BUILDER TO SUPPLY & INSTALL EMERGENCY LIGHTS & EXIT LIGHTS.WHERE APPLICABLE. DESIGNER
LIGHT. LIGHTING AT ENTRANCES THAT HAS A HIGHER LUX LEVEL THAN THE SURROUNDING LIGHTING MANUFACTURES /SUPPLIERS REQUIRMENTS SPECIFIC LOCATIONS OF THE GPO/DATA OUTLETS. ALLOW - ALL ELECTRICAL INSTALLATIONS MUST BE INSTALLED ACCORDING TO AUSTRALIAN STANDARDS AS - PROVIDE AFTER HOURS DISPLAY LIGHTING TO SHOP FRONT AND INTERNAL DISPLAY COLUMNS.
TO ASSIST WITH IDENTIFICATION AND SAFETY. FOR SUPPLY AND INSTALLATION OF ALL GPOS/DATA TO ALL EQUIPMENT/MACHINERY REQUIRING 3000. WHERE APPLICABLE/TIMER TO BE FITTED TO AFTER HOURS LIGHTING WHERE/IF REQUIRED.
- LIGHTING LAYOUT TO BE APPROVED BY TENANT (CLIENT) & TENANT TO ENGAGE A LIGHTING ENGINEER POWER/DATA . CONFIRM ALL GPO/DATA LOCATIONS WITHIN JOINERY UNITS WITH THE CLIENT - ALL EXISTING ELECTRICAL SERVICES THAT ARE NOT INDICATED ON PLAN ARE TO BE RELOCATED AND - EMERGENCY LIGHTS & EXIT SIGNS TO BE IN ACCORDANCE WITH BCA E4.2,E4.4, E4.5, E4.6, AND AS
TO PREPARE APPROPRIATELY DESIGNED LIGHTING LAYOUT . PRIOR TO INSTALLATION/CONSTRUCTION. ALL ELECTRICAL / DATA WIRING/OTHER CABLING TO BE OR REMOVED AND AREA TO BE MADE GOOD FOR NEW WORKS. 2293.1
- INSTALLATION OF EMERGENCY LIGHTING & ILLUMINATED EXIT SIGNS TO BE IN ACCORDANCE WITH AS CONCEALED WITHIN WALLS/FLOORS / JOINERY WHERE REQUIRED.IF CHASING REQUIRED TO FLOOR - NEW SWITCHBOARDS LOCATED WITHIN A PATH OF TRAVEL TO AN EXIT ARE TO ENCLOSED IN NON
2293. ALL ELECTRICAL INSTALLATIONS MUST BE INSTALLED ACCORDING TO AUSTRALIAN STANDARDS -STRUCTURAL ENGINEERS TO CHECK IF CAN BE ACHIEVED WITHIN STRUCTURE. COMBUSTIBLE CONSTRUCTION WITH SMOKE PROOF DOORS. (WHERE APPLICABLE).
DDA / ACCESSIBILITY / EGRESS / DOORS / RAMPS & STAIRS:
- NEW BUILDINGS, AND EXISTING BUILDINGS UNDERGOING BUILDING WORK, MUST TO BE CAPABLE OF BEING OPENED AT ALL TIMES FROM THE SIDE FACING THE PERSON SEEKING EGRESS ANY FULLY GLAZED DOOR OR GLASS WALL THAT COULD BE MISTAKEN FOR AN ENTRANCE. A MINIMUM CLOSING.
COMPLY WITH THE COMMONWEALTH DISABILITY (ACCESS TO PREMISES - BUILDINGS) FROM THE BUILDING WITH A SINGLE HANDED DOWNWARD ACTION ON A SINGLE DEVICE WITHOUT THE 30% LUMINANCE CONTRAST TO THE BACKGROUND IS ALSO REQUIRED. A MAXIMUM FORCE OF 20N AT - A 1M CLEAR PATH IS REQUIRED TO BE MAINTAINED THROUGHOUT TENANCY AS A MINIMUM UNLESS
STANDARDS 2010 (PREMISES STANDARDS) THE USE OF A KEY AND LOCATED BETWEEN 900MM AND 1200MM ABOVE FFL IN ACCORDANCE WITH CLAUSE THE ENTRANCE DOOR HANDLE TO OPEN DOORS, AND DOOR CLOSERS THAT ARE ADJUSTABLE. OTHERWISE REQUIRED TO COMPLY WITH CIRCULATION. A CONTINUOUS ACCESSIBLE PATH OF TRAVEL
PREMISES STANDARDS HAVE BEEN MADE UNDER THE COMMONWEALTH DISABILITY D2.21, BCA 2016 Volume 1 Amendment 1. ANY ENTRANCE BUZZER OR INTERCOM 900 - 1100mm HIGH. FROM THE PROPERTY ENTRANCE AND ANY ONSITE CAR PARK TO PRINCIPAL ENTRANCES.
DISCRIMINATION ACT 1992 (DDA) - DOOR HANDLES WITH 35MM AND NOT MORE THAN 45MM CLEARANCE BETWEEN THE HANDLE (IN THE - INSTALL WEATHER STRIPS TO THE BOTTOM OF ALL EXTERNAL DOORS (IF APPLICABLE) (FOR - ENTRANCE DOORS THAT CAN BE OPENED FROM THE OUTSIDE OF A ROOM IN AN EMERGENCY.
- ACCESS PROVISION PERFORMANCE REQUIREMENT TO BE THAT CONTAINED IN SECTION D, PART E3 CENTRE) AND THE BACK PLATE OR DOOR FACE EXTERNALLY FACING TENANCIES) & TO NEW DOORS ONLY - DOOR CONTROLS THAT CAN BE REACHED BY A PERSON WHEN STANDING OR
AND PART F2 OF THE BCA FOR WHICH THERE IS AN EQUIVALENT PERFORMANCE REQUIREMENT IN THE D OD D STYLE DOOR HANDLE WITH RETURN, INSTALLED AT HEIGHT OF 900 - 1100mm ABOVE FLOOR - RAMPS TO BE CONSTRUCTED ACCORDING TO AS 1428.1- 2009 & N.C.C Part 3.9.1 Stairway and ramp SEATED AND USED WITH A CLOSED FIST OR OPEN PALM AND INCORPORATING RAISED TACTILE AND
ACCESS CODE WITHIN THE MEANING OF THE PREMISES STANDARDS. THE ACCESS CODE REFERENCES LEVEL construction - SAFE MOVEMENT AND ACCESS / STAIRWAY & RAMP CONSTRUCTION BRAILLE ELEMENTS, FOR EXAMPLE, ENTRY BUZZER AND AFTER HOURS ACCESS.
DP1, DP4, DP6, DP8 AND DP9 A MINIMUM 850MM CLEAR OPENING WIDTH AT ENTRANCES WITH CIRCULATION SPACE ON BOTH SIDES - ALL DO0RS AND WINDOWS RO BE INSTALLED IN ACCORDANCE WITH AS2047.1-1996 - DOORS AND - EXIT DOORS WHICH SWING AGAINST THE DIRECTION OF EXIT TRAVEL ARE TO BE CAPABLE OF BEING
RAMPS TO MEET CIRCULATION SPACES AND ANGLES OF APPROACH AT DOORWAYS IN ACCORDANCE THAT CONSIDERS ANGLES OF APPROACH AND INCORPORATES LEVEL LANDINGS (INCLUDING THE WINDOWS / WINDOWS IN BUILDINGS - SELECTION AND INSTALLATION. HELD IN AN OPEN POSITION.
WITH THE RANGE IN AUSTRALIAN STANDARDS. OPERATIVE LEAF OF A MULTIPLE LEAF DOOR). SOLID STRIP A MINIMUM OF 75MM WIDE INSTALLED - DOOR CONTROLS THAT ARE LOCATED ON THE PATH OF TRAVEL TO THE DOOR, TO ALLOW ADEQUATE
- ALL EXIT DOORS AND DOOR IN THE PATH OF TRAVEL TO EXITS (INCLUDING ROLLER SHUTTERS) ARE WITH THE LOWER EDGE AT A HEIGHT OF 900 - 1000mm ABOVE FLOOR LEVEL ACROSS THE WIDTH OF TIME WHEN IN OPERATION FOR A PERSON TO MOVE FULLY THROUGH THE DOOR PRIOR TO THE DOOR
WALLS:
- ALL EXISTING PLASTERBOARD STUD WALLS TO BE RE SANDED & PREPARED AVOID DIFFERENTIAL SHRINKAGE BETWEEN DISSIMILAR MATERIALS, E.G. STEEL TO TIMBER; TIMBER TO - Part C1: Fire resistance and stability AS1170.2 STRUCTURAL DESIGN ACTIONS - WIND ACTIONS
TO BE REPAINTED. MASONRY; AND - ALLOWING FOR SHRINKAGE WITH RESPECT TO PLUMBING. IT IS RECOMMENDED THAT - Part C2 - Compartmentalisation & separation AS1170.4 STRUCTURAL DESIGN ACTIONS - EARTHQUAKE ACTIONS
- TIMBER FRAMING SHALL COMPLY WITH AS 1684 AS APPLICABLE. MUST BE CONSTRUCTED USING A PROFESSIONAL STRUCTURAL ENGINEER BE EMPLOYED TO ADDRESS THE ABOVE ISSUES AND - Part C3 - Protection of openings AS1720.1 TIMBER STRUCTURES - DESIGN METHODS
SPECIFIC METHODS FOR ATTACHMENT OF LININGS TO ACHIEVE FIRE RATINGS GREATER POTENTIAL FOR STRUCTURAL PERFORMANCE IN GENERAL. - THE FOLLOWING STANDARDS AND GUIDELINES SHOULD BE CALLED UPON TO ASSIST:
SHRINKAGE IN TALLER TIMBER BUILDINGS. SHRINKAGE CAN BE MINIMISED BY: - UNSEASONED TIMBER - FIRE - DESIGN REQUIREMENTS Deemed to Satisfy Provisions that meet the above Performance AS1170.0 STRUCTURAL DESIGN ACTIONS - GENERAL PRINCIPLES
OR ENGINEERED TIMBER; CONSTRUCTION BEARERS & JOISTS AT THE SAME PLANE- DETAILING TO Requirements are detailed in the BCA under: AS1170.1 STRUCTURAL DESIGN ACTIONS - PERMANENT, IMPOSED AND OTHER ACTIONS (2002)
GLAZING:
- ALL GLAZING TO COMPLY WITH AS 1288,& AS 2047 & SECTION 'J' - GLASS IN BUILDINGS - SELECTION - VISUAL INDICATORS ON GLAZING AS PER AS1428.1:2009 WHERE THERE IS NO CHAIR RAIL, HANDRAIL SHALL BE NOT LESS THAN 75 MM WIDE AND SHALL EXTEND ACROSS THE FULL WIDTH OF THE GLAZING WHEN VIEWED AGAINST THE FLOOR SURFACE OR SURFACES WITHIN 2 M OF THE GLAZING ON THE
AND INSTALLATION. OR TRANSOM, ALL FRAMELESS OR FULLY GLAZED DOORS, SIDELIGHTS, INCLUDING ANY GLAZING PANEL. THE LOWER EDGE OF THE CONTRASTING LINE SHALL BE LOCATED OPPOSITE SIDE. FROSTED OR TRANSPARENT FILMS MUST NOT BE USED.
- SHOP FITTER TO PROVIDE STRUCTURAL ENGINEERS DRAWINGS , COMPUTATIONS & CERTIFICATE FOR CAPABLE OF BEING MISTAKEN FOR A DOORWAY OR OPENING, SHALL BE CLEARLY MARKED FOR THEIR BETWEEN 900 MM AND 1000 MM ABOVE THE PLANE OF THE FINISHED FLOOR LEVEL. - ENSURE ALL EDGES ARE BEVELED AND POLISHED SMOOTH. (WHERE APPLICABLE).
GLAZING WORKS FULL WIDTH WITH A SOLID AND NON-TRANSPARENT CONTRASTING LINE. THE CONTRASTING LINE - ANY CONTRASTING LINE ON THE GLAZING SHALL PROVIDE A MINIMUM OF 30% LUMINANCE CONTRAST
NOOSA COUNCIL
REFERENCE DOCUMENT
EXE25/0032 25 AUG 2025
PROJECT ISSUE: FOR CONSTRUCTION
GENERAL NOTES No. AMENDMENT DATE IN ASSOCIATION WITH: project :
Architectural documents to be read in conjunction with relevant Structural, Fire Service, Mechanical, Hydraulic, JANE PROPERTY
Electrical, Civil and Landscaping documents. Technical drawings to be read in conjunction with appropriate C1 TITLE BLOCK REVISED; ISSUED FOR CONSTRUCTION 09.12.2024 Project No. Drawing No.
sections of technical specification.
144 Eumundi Noosa Rd, Noosaville QLD 4566 address : AS74
Contractor to verify all dimensions / condition on site prior to commencement of works. Contractor to seek
Total Area
clarification of all inconsistencies and resolve all discrepancies on plans and site conditions prior to
description : - A001
commencement of any works on site. Commencement of works on site by the contractor is deemed to be
acceptance of all conditions and plans and any variations will be the responsibility of the contractor expense. INTERNATIONAL First Drawn Scale Revision
Figured dimensions shall take precedence to scaled dimensions. TOTAL PROPERTY DEVELOPMENT SOLUTIONS drawing title : September 2024
Copyright of designs shown herein is retained by Allister Sarris. Written authority is required for any reproduction.
GENERAL NOTES Date Issued Paper Size
Notify SARRIS ARCHITECTURE of any changes. No changes to occur without SARRIS approval.
Document Set ID: 24027286 CHECKED BY: S.E. HARDY (QBSA LICENCE NUMBER 65539) - A3 C1
Version: 1, Version Date: 13/08/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.