7725 7700 7550 7725 6100 6200 6200 5300
NEW ACCESSIBLE TOILETS: WALL FLOOR FINISHES NEW ACCESSIBLE TOILETS: WALL FLOOR FINISHES
WALL TILES: SUPPLY AND FIX 200X200 WHITE CERAMIC TILES, WALL TILES: SUPPLY AND FIX 200X200 WHITE CERAMIC TILES,
1 ROW ABOVE HAND BASINS, 1 ROW AS SKIRTING. 1 ROW ABOVE HAND BASINS, 1 ROW AS SKIRTING.
FLOOR TILES: SUPPLY AND LAY 200X200 GREY CERAMIC TILES. FLOOR TILES: SUPPLY AND LAY 200X200 GREY CERAMIC TILES.
NOTE: REFER TO AMENITIES DRAWINGS FOR FURTHER DETAILS NOTE: REFER TO AMENITIES DRAWINGS FOR FURTHER DETAILS
1
ATR
ATR
ATR
ATR
ATR
ATR
ATR
ATR
6000
PREPARE AND APPLY EPOXY
RESIN TO TENANCY FLOOR
2
FE
Tenancy Tenancy Tenancy Tenancy Tenancy Tenancy Tenancy Tenancy
T8 T7 T6 T5 T4 T3 T2 T1
GLA = 161 m² GLA = 157 m² GLA = 136 m² GLA = 119 m² GLA = 74 m² GLA = 74 m² GLA = 74 m² GLA = 44 m²
SB
PREPARE AND APPLY EPOXY PREPARE AND APPLY EPOXY PREPARE AND APPLY EPOXY PREPARE AND APPLY EPOXY PREPARE AND APPLY EPOXY PREPARE AND APPLY EPOXY PREPARE AND APPLY EPOXY
6400
RESIN TO TENANCY FLOOR RESIN TO TENANCY FLOOR RESIN TO TENANCY FLOOR RESIN TO TENANCY FLOOR RESIN TO TENANCY FLOOR RESIN TO TENANCY FLOOR RESIN TO TENANCY FLOOR
FE FE FE FE FE FE FE
3
6000
4
COUNCIL ANNOTATION:
Exemption Certificate EXE25/0032
only relates to the replacement of the
4800
existing roof and upgrade of ground
floor toilets from code assessment for
building works within the Medium
5 Impact Industry Zone.
A FLOOR PLAN: PROPOSED FLOOR FINISHES
- Scale 1:150 @ A3
PROPOSED SCOPE OF WORKS: CERAMIC TILES
All works will be carried out to Australian ATR:
Standards, the works include and are limited to: ALUMINIUM TRANSITION STRIP
Wall tiles: Supply and fix 200x200 white ceramic PROVIDE TRANSITION STRIP AS
REQUIRED AT TRANSITION OF 2
tiles, 1 row above hand basins, 1 row as skirting.
DIFFERENT FLOOR FINISHES
Floor tiles: Supply and lay 200x200 grey ceramic
tiles.
NOOSA COUNCIL
PROPOSED SCOPE OF WORKS: FLOOR FINISHES
REFERENCE DOCUMENT Prepare and apply grey epoxy paint to tenancy
EXE25/0032 25 AUG 2025 floors.
REFER TO DRAWING A040 FOR FINISHES SCHEDULE
PROJECT ISSUE: FOR CONSTRUCTION
GENERAL NOTES No. AMENDMENT DATE IN ASSOCIATION WITH: project :
Architectural documents to be read in conjunction with relevant Structural, Fire Service, Mechanical, Hydraulic, JANE PROPERTY
Electrical, Civil and Landscaping documents. Technical drawings to be read in conjunction with appropriate C1 TITLE BLOCK REVISED; ISSUED FOR CONSTRUCTION 09.12.2024 Project No. Drawing No. north
sections of technical specification.
144 Eumundi Noosa Rd, Noosaville QLD 4566 address : AS74
N
Contractor to verify all dimensions / condition on site prior to commencement of works. Contractor to seek
Total Area
clarification of all inconsistencies and resolve all discrepancies on plans and site conditions prior to
description : - A105
commencement of any works on site. Commencement of works on site by the contractor is deemed to be
acceptance of all conditions and plans and any variations will be the responsibility of the contractor expense. INTERNATIONAL First Drawn Scale Revision
Figured dimensions shall take precedence to scaled dimensions. TOTAL PROPERTY DEVELOPMENT SOLUTIONS drawing title : September 2024
Copyright of designs shown herein is retained by Allister Sarris. Written authority is required for any reproduction.
FLOOR PLAN: FLOOR FINISHES Date Issued Paper Size
Notify SARRIS ARCHITECTURE of any changes. No changes to occur without SARRIS approval.
Document Set ID: 24027286 CHECKED BY: S.E. HARDY (QBSA LICENCE NUMBER 65539) - A3 C1
Version: 1, Version Date: 13/08/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.