Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

Reference Document - EXE25 0032 (As Published)

of 16

Page text shows just the words. Original shows the document exactly as it was published.

                                                A                                                                               B                                                    C                                      D                                   E                             F                               G                                          H                                                    I
                                                                                          7725                                                         7700                                            7550                                        7725                       6100                          6200                                 6200                                           5300


                                                                                                                                                NEW ACCESSIBLE TOILETS: WALL FLOOR FINISHES                                                                                                       NEW ACCESSIBLE TOILETS: WALL FLOOR FINISHES
                                                                                                                                                WALL TILES: SUPPLY AND FIX 200X200 WHITE CERAMIC TILES,                                                                                           WALL TILES: SUPPLY AND FIX 200X200 WHITE CERAMIC TILES,
                                                                                                                                                             1 ROW ABOVE HAND BASINS, 1 ROW AS SKIRTING.                                                                                                       1 ROW ABOVE HAND BASINS, 1 ROW AS SKIRTING.
                                                                                                                                                FLOOR TILES: SUPPLY AND LAY 200X200 GREY CERAMIC TILES.                                                                                           FLOOR TILES: SUPPLY AND LAY 200X200 GREY CERAMIC TILES.
                                                                                                                                                NOTE:        REFER TO AMENITIES DRAWINGS FOR FURTHER DETAILS                                                                                      NOTE:        REFER TO AMENITIES DRAWINGS FOR FURTHER DETAILS

         1




                                                                                                  ATR




                                                                                                                                                     ATR




                                                                                                                                                                                                            ATR




                                                                                                                                                                                                                                               ATR




                                                                                                                                                                                                                                                                             ATR




                                                                                                                                                                                                                                                                                                               ATR




                                                                                                                                                                                                                                                                                                                                                ATR




                                                                                                                                                                                                                                                                                                                                                                                                       ATR
                 6000




                                                                                                                                                                                                                                                                                                                                                                              PREPARE AND APPLY EPOXY
                                                                                                                                                                                                                                                                                                                                                                               RESIN TO TENANCY FLOOR
         2
                                                                                                                                                                                                                                                                                                                                                                                          FE
                                                                                 Tenancy                                                          Tenancy                                          Tenancy                                   Tenancy                      Tenancy                        Tenancy                             Tenancy                                Tenancy
                                                                                    T8                                                               T7                                               T6                                        T5                          T4                             T3                                  T2                                      T1
                                                                               GLA = 161 m²                                                     GLA = 157 m²                                     GLA = 136 m²                              GLA = 119 m²                 GLA = 74 m²                    GLA = 74 m²                         GLA = 74 m²                            GLA = 44 m²
                                                                                                                                                                                                                                                                                                                                                                             SB
                                                                      PREPARE AND APPLY EPOXY                                             PREPARE AND APPLY EPOXY                            PREPARE AND APPLY EPOXY                  PREPARE AND APPLY EPOXY       PREPARE AND APPLY EPOXY       PREPARE AND APPLY EPOXY           PREPARE AND APPLY EPOXY
                 6400




                                                                       RESIN TO TENANCY FLOOR                                              RESIN TO TENANCY FLOOR                             RESIN TO TENANCY FLOOR                   RESIN TO TENANCY FLOOR        RESIN TO TENANCY FLOOR        RESIN TO TENANCY FLOOR            RESIN TO TENANCY FLOOR

                                                                                          FE                                                               FE                                          FE                                          FE                         FE                             FE                                    FE



         3
                 6000




         4
                                                                                                                                                                                                                                                                                                                                                             COUNCIL ANNOTATION:
                                                                                                                                                                                                                                                                                                                                                        Exemption Certificate EXE25/0032
                                                                                                                                                                                                                                                                                                                                                      only relates to the replacement of the
                 4800




                                                                                                                                                                                                                                                                                                                                                        existing roof and upgrade of ground
                                                                                                                                                                                                                                                                                                                                                      floor toilets from code assessment for
                                                                                                                                                                                                                                                                                                                                                         building works within the Medium
         5                                                                                                                                                                                                                                                                                                                                                      Impact Industry Zone.

                                                                                                                          A    FLOOR PLAN: PROPOSED FLOOR FINISHES
                                                                                                                          -     Scale 1:150 @ A3
                                                                                                                                                                                                                                                                                                                                  PROPOSED SCOPE OF WORKS: CERAMIC TILES
                                                                                                                                                                                                                                                                                                                                  All works will be carried out to Australian                       ATR:
                                                                                                                                                                                                                                                                                                                                  Standards, the works include and are limited to:                  ALUMINIUM TRANSITION STRIP
                                                                                                                                                                                                                                                                                                                                  Wall tiles: Supply and fix 200x200 white ceramic                  PROVIDE TRANSITION STRIP AS
                                                                                                                                                                                                                                                                                                                                                                                                    REQUIRED AT TRANSITION OF 2
                                                                                                                                                                                                                                                                                                                                  tiles, 1 row above hand basins, 1 row as skirting.
                                                                                                                                                                                                                                                                                                                                                                                                    DIFFERENT FLOOR FINISHES
                                                                                                                                                                                                                                                                                                                                  Floor tiles: Supply and lay 200x200 grey ceramic
                                                                                                                                                                                                                                                                                                                                  tiles.
                                                                                                                                                                                                                                                                                  NOOSA COUNCIL
                                                                                                                                                                                                                                                                                                                                  PROPOSED SCOPE OF WORKS: FLOOR FINISHES
                                                                                                                                                                                                                                                                               REFERENCE DOCUMENT                                 Prepare and apply grey epoxy paint to tenancy
                                                                                                                                                                                                                                                                               EXE25/0032 25 AUG 2025                             floors.


                                                                                                                                                                                                                                                                                                                                                               REFER TO DRAWING A040 FOR FINISHES SCHEDULE
                                                                                                                                                                                                                                                                                                                        PROJECT                                                               ISSUE: FOR CONSTRUCTION
  GENERAL NOTES                                                                                                           No. AMENDMENT                                       DATE           IN ASSOCIATION WITH:                                                                                                                                                            project :
  Architectural documents to be read in conjunction with relevant Structural, Fire Service, Mechanical, Hydraulic,                                                                                                                                                                                                     JANE PROPERTY
  Electrical, Civil and Landscaping documents. Technical drawings to be read in conjunction with appropriate              C1   TITLE BLOCK REVISED; ISSUED FOR CONSTRUCTION     09.12.2024                                                                                                                                                                                                                 Project No.        Drawing No.       north
  sections of technical specification.
                                                                                                                                                                                                                                                                                                                       144 Eumundi Noosa Rd, Noosaville QLD 4566 address :                AS74




                                                                                                                                                                                                                                                                                                                                                                                                                                               N
  Contractor to verify all dimensions / condition on site prior to commencement of works. Contractor to seek
                                                                                                                                                                                                                                                                                                                                                                                                            Total Area
  clarification of all inconsistencies and resolve all discrepancies on plans and site conditions prior to
                                                                                                                                                                                                                                                                                                                                                                         description :    -                              A105
  commencement of any works on site. Commencement of works on site by the contractor is deemed to be
  acceptance of all conditions and plans and any variations will be the responsibility of the contractor expense.                                                                                   INTERNATIONAL                                                                                                                                                                                          First Drawn                 Scale   Revision
  Figured dimensions shall take precedence to scaled dimensions.                                                                                                                                     TOTAL PROPERTY DEVELOPMENT SOLUTIONS                                                                                                                               drawing title :   September 2024
  Copyright of designs shown herein is retained by Allister Sarris. Written authority is required for any reproduction.
                                                                                                                                                                                                                                                                                                                       FLOOR PLAN: FLOOR FINISHES                                                          Date Issued            Paper Size
  Notify SARRIS ARCHITECTURE of any changes. No changes to occur without SARRIS approval.
Document Set ID: 24027286                                                                                                                                                                     CHECKED BY: S.E. HARDY (QBSA LICENCE NUMBER 65539)                                                                                                                                          -                              A3                    C1
Version: 1, Version Date: 13/08/2025
Log in to download the original file

Reference Document - EXE25 0032 (As Published).pdf · 3.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.