Council archive · source document
Decision Notice - 010.2006.00002554.001 [As Published] · 132006.2554
Form 6 - Decision Notice
INTEGRATED PLANNING ACT 1997, S3.5.15, IDAS DEVELOPMENT APPLICATION
File No: 2006/2554 Date of Decision: 10 January 2007
1. APPLICANT DETAILS
Name: Meredith Lilian McDermott
Postal address: CARE Downes Survey Group
PO Box 39
NAMBOUR QLD 4560
Phone no: 07 5441 6455 Fax no: 07 5441 6307
2. PROPERTY DESCRIPTION
Street address: 51 Tristania Drive, Marcus Beach
Real property Lot 5 M 11113, County of March, Parish of Weyba
description:
3. OWNER DETAILS
Name: Meredith Lilian McDermott
Postal address: 32 Kepnock Road
BUNDABERG QLD 4670
4. REFERRAL AGENCIES
Referral Agency Address Basis
Environmental Protection GPO Box 2771, Brisbane Qld 4001 Concurrence
Agency
5. APPLICATION TYPE
Development Development Details Preliminary Development
Approval Permit
Material Change of Use Detached House No Yes
6. DECISION DETAILS
Council decided to approve the application and grant a Development Permit, subject to conditions.
7. APPLICABLE CODES
The developer must comply with the following codes for self-assessable development related to the development
approved under this Development Permit:-
Detached House Driveways Code.
8. SUBMISSIONS
Not applicable.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 10 pages
Page 2
NOOSA COUNCIL IDAS Development Application Decision Notice 2 of 11 9. CONDITIONS The approval is subject to conditions. Noosa Council’s conditions are attached. Conditions from the Environmental Protection Agency, as a concurrence agency are also attached. 10. FURTHER DEVELOPMENT PERMITS REQUIRED Type of Development Permit required Subject of the required Development Permit Development Permit for Building Works All building works 11. RIGHTS OF APPEAL Rights of appeal in relation to this application are attached. 12. ASSESSMENT MANAGER Name: Noosa Council Signature: Date: 10/01/07 A c:\docume~1\dwallace\locals~1\temp\bcl technologies\easypdf 5\@bcl@200430cf\@[email protected]
Page 3
NOOSA COUNCIL IDAS Development Application Decision Notice 3 of 11
Noosa Council Conditions
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
Land Use
1. Development undertaken in accordance with this approval must generally comply with the approved plans
of development. The approved plans are titled and numbered
Site Plans, PD-02
Existing Levels, PD-03
Basement Floor Plan, PD-04
Ground Floor Plan, PD-05
First Floor Plan, PD-06
Front & Rear Elevations, PD-07
Side Elevations, PD-08
prepared by John Murchie and dated August 2006 and as may be amended by these conditions.
2. The development must be undertaken and operated in a manner that causes no detrimental effect upon
the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other
emissions.
3. The rear property boundary fence must comply with the following requirements:
3.1. no more than 1.2m in height; and
3.2. be of open construction (ie at least 50% transparent); and
3.3. be constructed with lightweight materials (ie timber); and
3.4. be of dark colours to blend with the natural landscape.
4. Gates must not be installed along the rear property boundary.
5. Dense landscaping, comprising a mix of native coastal species of ground cover, scrubs and trees, is
provided for a width of 5m from the seawards or rear boundary of the site to provide adequate landscape
buffering to protect the coastal dune system.
It is noted that the 3000lt rainwater storage tank may need to be relocated to comply with this
requirement.
6. The boat storage shed must comply with the following requirements:
6.1 Have a length no greater than 9m
6.2 Have a maximum height not greater than 4.5m and a mean height not greater than 3.5m as
defined in the Queensland Development Code Part 12 – Design and Siting Standard for Single
Detached Housing – on lots 450m² and over.
7. Plans showing compliance with Condition 6 are to be submitted to Council, prior to obtaining a
Development Permit for Building Works.
8. All hot water systems installed shall be either solar systems; electric heat pump systems; or gas systems
(LPG or natural).
9. A rainwater storage tank with a minimum capacity of 3000 litres shall be provided on site to service the
detached house. The tank is to be installed to ensure water from the tank can be used both:
9.1 for external use such as watering gardens, irrigation, ornamental ponds or water features, topping
up swimming pools, outdoor cleaning; and
9.2 for use in flushing of toilets internal to the building.
A c:\docume~1\dwallace\locals~1\temp\bcl technologies\easypdf 5\@bcl@200430cf\@[email protected]
Page 4
NOOSA COUNCIL IDAS Development Application Decision Notice 4 of 11
10. Buildings and structures (including swimming pools, sheds, tennis courts or outbuildings) are not
constructed under overhead electricity transmission lines, or within any easements.
11. Security in the form of a cash bond or trading bank guarantee to the sum of $5 000 must be submitted, to
secure performance of all conditions of this approval, prior to the issue of a Development Permit for
building works. The cash bond or trading bank guarantee will be returned on performance of the
conditions of approval less any costs incurred by Council in respect of enforcing performance of this
permit.
12. The Development Permit for a material change of use lapses if the use has not happened by 10 January
2011, unless an application to extend the currency is approved by Council.
Building Services
13. The development must be undertaken and operated in a manner that causes no detrimental effect upon
the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other
emissions.
14. Fences/walls and combined retaining walls shall not exceed 2.0 metres above natural ground level.
15. Where a wall of a building or structure is less than 750mm from the side or rear boundary, the wall is to be
maintenance free.
16. A condition survey is to be carried out of adjoining buildings, structures and services prior to any
demolition works or construction works taking place on site. If distress already exists, a photographic
survey shall be undertaken, the distress measured and a plan to monitor changes to distress shall be
implemented.
17. Infrastructure including reticulated water, sewerage, stormwater, and electricity are to be protected from
damage and made safe to the standard required by the regulatory authority;
18. All infrastructure must be disconnected, capped or sealed including--
18.1 electricity meters removed and electrical wires disconnected; and
18.2 telephone lines are disconnected; and
18.3 high-speed data cables and television provider boxes are disconnected and removed to the
standard required by the regulatory authority;
19. All building materials containing asbestos, including asbestos cement sheeting or roofing and lagging,
must be removed from the building and disposed of in accordance with industry best practice.
20. Waste generated during construction must be stockpiled in a centralised location and covered as required
to prevent material being blown onto adjoining properties including the road reserve or food waste from
generating vermin. All site waste must be disposed of to an approved waste disposal facility either directly
or via an approved waste receptacle and collection service. Storage areas are to be located near the
temporary access to the site so that access can be gained with out damage to infrastructure.
21. A temporary crossing must be provided to protect road reserve infrastructure including kerb and channel;
22. Any damage to footpaths, street plantings, kerb and channel or roadways at the removal site, the
relocation site or between the sites must be repaired or reinstated to at least pre-existing conditions.
23. Sediment and erosion control measures must be placed on site prior to the works commencing and shall
be maintained until all works are complete. The erosion and sediment control measures shall be in
accordance with the “Best practice guidelines for control of stormwater on building sites” prepared by
Healthy Waterways (copy attached or available at www.healthywaterways.org).
24. All disturbed areas must be revegetated or otherwise stabilised at the completion of the works. Disturbed
areas are revegetated using species identified in PSP3 – Landscaping Plants and Guidelines
25. The transportation of all materials to and from the site must be undertaken in a manner such that no
particle matter escapes onto a public road. All vehicles carrying out materials either to or from the site
shall be covered to prevent materials including dust being windblown from the vehicle
A c:\docume~1\dwallace\locals~1\temp\bcl technologies\easypdf 5\@bcl@200430cf\@[email protected]
Page 5
NOOSA COUNCIL IDAS Development Application Decision Notice 5 of 11
26. The works must be undertaken in a manner that causes no detrimental effect upon the amenity of the
neighbourhood by reason of the creation of excessive noise, lighting, air-borne hazards, atmospheric
pollutants (including dust or odours) nuisance or any other emissions in accordance with the nuisance
provisions of the Environmental Protection Regulation 1998 or Council’s Local Law No. 12 – Control of
Nuisances.
27. There is to be no uncontrolled discharge of water onto the slope.
A c:\docume~1\dwallace\locals~1\temp\bcl technologies\easypdf 5\@bcl@200430cf\@[email protected]
Page 6
NOOSA COUNCIL IDAS Development Application Decision Notice 6 of 11
Concurrence Agency Conditions –
Environmental Protection Agency
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
A c:\docume~1\dwallace\locals~1\temp\bcl technologies\easypdf 5\@bcl@200430cf\@[email protected]
Page 7
NOOSA COUNCIL IDAS Development Application Decision Notice 7 of 11 A c:\docume~1\dwallace\locals~1\temp\bcl technologies\easypdf 5\@bcl@200430cf\@[email protected]
Page 8
NOOSA COUNCIL IDAS Development Application Decision Notice 8 of 11 A c:\docume~1\dwallace\locals~1\temp\bcl technologies\easypdf 5\@bcl@200430cf\@[email protected]
Page 9
NOOSA COUNCIL IDAS Development Application Decision Notice 9 of 11
Local Laws, Policies & State
Regulation Requirements
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
THE FOLLOWING ADVICES ARE FOR INFORMATION PURPOSES ONLY AND DO NOT FORM
CONDITIONS OF APPROVAL
1. The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and Local Law
No. 12, prevents a builder or building contractor carrying out building work on a building site in a way that
makes or causes audible noise to be made from the building work:
1.1. On a Sunday or public holiday, at any time; or
1.2. On a Saturday or a business day, before 7.00am or after 6.30pm.
A maximum penalty of $1,500 applies to an offence under this legislation.
2. Prior to the commencement of the development, a plumbing assessment must be obtained from Noosa
Council’s Plumbing Services Section in accordance with the Plumbing & Drainage Act 2002 (as
applicable).
3. Fencing to the swimming pool must comply with the Queensland Building Act 1975 Chapter 8 and Part 4
of Building Regulation 2006 in all respects. Direct access from the dwelling to the pool enclosure is not
permitted.
4. If soil conditions, ground levels, excavation or filling make it necessary to protect land, buildings or
structures in the neighbourhood of building work—
4.1 retaining walls must be built, or other suitable methods used, to prevent soil movement; and
4.2 drainage of the land, buildings or structures must be provided.
A c:\docume~1\dwallace\locals~1\temp\bcl technologies\easypdf 5\@bcl@200430cf\@[email protected]
Page 10
NOOSA COUNCIL IDAS Development Application Decision Notice 10 of 11
Appeal Rights
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
The following is an extract from the Integrated (6) If an application involves assessment against
Planning Act (Chapter 4). a concurrence agency code, appeal rights for
submitters for the application are not available
Division 8 - Appeals to court relating to against the part of the approval that represents the
development applications concurrence agency’s response for the code.
Appeals by applicants Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application 4.1.29.(1) An advice agency may, within the limits of
may appeal to the court against any of the following- its jurisdiction, appeal to the court about the giving of
(a) the refusal, or the refusal in part, of a a development approval for a development
development application; application if-
(b) a matter stated in a development approval, (a) the development application involves impact
including any condition applying to the assessment; and
development, and the identification of a code (b) the advice agency told the applicant and the
1
under section 3.1.6; assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a application as a submission for an appeal.
development permit was applied for; (2) The appeal must be started within 20 business
(d) the length of a currency period; days after the day the decision notice or negotiated
decision notice is given to the advice agency as a
(e) a deemed refusal. submitter.
(2) An appeal under subsection (1)(a) to (d) must Appeals for matters arising after approval given
be started within 20 business days (the “applicant’s (co-respondents)
appeal period”) after the day the decision notice or
negotiated decision notice is given to the applicant. 4.1.30.(1) For a development approval given for a
development application, a person to whom any of
(3) An appeal under subsection (1)(e) may be the following notices have been given may appeal to
started at any time after the last day a decision on the the court against the decision in the notice-
matter should have been made.
(a) a notice giving a decision on a request for
Appeals by submitters extension of the currency period for an approval;
4.1.28.(1) A submitter for a development application (b) a notice giving a decision on a request to make a
may appeal to the court about- minor change to an approval.
(a) the giving of a development approval, including (2) The appeal must be started within 20 business
any conditions (or lack of conditions) or other days after the day the notice of the decision is given
provisions of the approval; or to the person.
(b) the length of a currency period for the approval. (3) Subsection (1)(a) does not apply if the
approval resulted from a development application
(2) The appeal must be started within 20 business (superseded planning scheme) that was assessed as
days (the “submitters appeal period”) after the day if it were an application under a superseded planning
the decision notice or negotiated decision notice is scheme.
given to the submitter.
(4) Also, a person who has made a request
(3) If a person withdraws a submission before the mentioned in subsection (1) may appeal to the court
application is decided, the person may not appeal the against a deemed refusal of the request.
decision.
(5) An appeal under subsection (4) may be
(4) If an application involves both impact started at any time after the last day the decision on
assessment and code assessment, appeal rights for the matter should have been made.
submitters are available only for the part of the
application involving impact assessment. Division 9 - Appeals to court about other matters
(5) If an application is processed under section Appeals for matters arising after approval given
6.1.28(2), appeal rights for submitters for the (no co-respondents)
application are available only for the aspects of the
development that would have required public 4.1.31.(1) A person to whom any of the following
notification under the repealed Act. notices have been given may appeal to the court
against the decision in the notice-
(a) a notice giving a decision on a request to change
or cancel a condition of a development approval.
1
Section 3.1.6 (Preliminary approval may override local planning
instrument)
A c:\docume~1\dwallace\locals~1\temp\bcl technologies\easypdf 5\@bcl@200430cf\@[email protected]
Page 11
NOOSA COUNCIL IDAS Development Application Decision Notice 11 of 11
2
(b) a notice under section 6.1.44 giving a decision to
change or cancel a condition of a development
approval.
(2) The appeal must be started within 20 business
days after the day the notice of the decision is given
to the person.
(3) Also, a person who has made a request
mentioned in subsection (1)(a) may appeal to the
court against a deemed refusal of the request.
(4) An appeal under subsection (3) may be
started at any time after the last day the decision on
the matter should have been made.
Appeals against decisions to change approval
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
decision made on an application to change the
conditions attached to an approval given under
section 2.19(3)or section 4.4 of the repealed Act may
appeal to the court against-
(a) the decision; or
(b) a deemed refusal of the application.
(2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of
the decision is to be given to the person.
(3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on the
matter should have been made.
Appeals against local laws
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises
or the erection of a building or other structure
permitted by the planning scheme may appeal to the
court against the decision or the conditions applied.
(2) The appeal must be started within 20 business
days after the day notice of the decision is given to
the applicant.
2
Section 6.1.44 (Conditions may be changed or cancelled by
assessment manager or concurrence agency in certain
circumstances)
A c:\docume~1\dwallace\locals~1\temp\bcl technologies\easypdf 5\@bcl@200430cf\@[email protected]
Used in these records
Decision Notice - 010.2006.00002554.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 225 KB (small file)
- File type
No other editions are linked here.