Council archive · source document
landscaping · OPW24/0043
W
MATERIALS & FINISHES SCHEDULE
V
CODE / ITEM MANUF. REQUIREMENTS
W
W
Turf Type 1 100mm deep amended site or imported topsoil with 25mm thick A-grade 'Winter Green' Couch.
PEARL STREET
V
Turf Type 2 Turf blocks to permeable concrete pavement. 100mm deep amended site or imported topsoil with
W
25mm thick A-grade 'Empire' Zoysia. Pavement by others.
W
E
Edge Type 1 Timber Edge. Refer to detail.
SW SW
N Garden Bed 1 300mm depth amended site or imported topsoil to specification, cover with 100mm thick forest
VE
W
mulch, refer to detail. Mulch to be coarse with a combination of bark, twigs and chips and maximum
PROPOSED
1 2 3 4 5 PROPOSED
SIGNIFICANT TREE
SIGNIFICANT TREE 10% fines.
S S S
SW
V V V E VE
W
E E VE E E E V E E V E
E
V V PEDESTRIAN FOOTPATH Mulch Only to Areas around street trees to be 100mm thick forest mulch. Mulch to be coarse with a combination
ROOF OVER
W IR W IR W W DRIVEWAY
W PROPOSED W Street Trees of bark, twigs and chips and maximum 10% fines.
S
IR IR IR IR IR
E SIGNIFICANT TREE
UP
CLEAR ZONE
8 7 6 5 4 3 2 1
Landscape Install D&C dripline irrigation system to all areas indicated on the landscape plan. Provide battery
SW
W
AIR LOCK
Z:\ZBD Staff Folder\Projects 2022\22012 - 48 Elm St Cooroy\02_Drawings Issued\22012-48ElmSt_ConceptPlans_INFOREQUEST-16-05-2023-MUTCD_D9-6.svg-3073462.png
STREET
DRIVEWAY AND PARKING
Irrigation powered controller with Bluetooth connectivity, positioned in easily accessible location, to be
IR
E
16
TO ENG. DETAIL
6
TENANCY 3
PWD
confirmed by client. Coordinate water take off point and all necessary conduits with engineer's and
ROOF OVER
S
96 m²
EASEMENT
IR
7 15
builders, prior to commencing landscape works.
STAFF
STORE
IR
E
TENANCY 4
SW
103 m² 14
8
STAFF
ROOF OVER
IR
13
KITCHENETTE
TENANCY 2 9
STAFF
61 m²
S
IR
E
FR MC1 MC2 MC3 MC4
12
STAFF
TENANCY 1
SW
TURN BAY
KITCHENETTE
61 m² KITCHENETTE 11
FR
OFFICE
BIN ENCLOSURE
ELM
E
FR
S
E
PLANTING SCHEDULE
S
S
CONTEXT PLAN
DRAWING SCHEDULE
23123 CD-000 COVER SHEET
23123 CD-001 SPECIFICATION NOTES
23123 CD-100 LANDSCAPE PLAN
23123 CD-200 CONSTRUCTION DETAILS
Revision Date Amendment Drawn Checked
APPROVAL ONLY
COVER SHEET NOT FOR CONSTRUCTION
A
B
21.03.2022
30.05.2023
For Approval
For Approval
XL & PS
XL
PS
CS
CD-000 scale: 1:300@A1; 1:600@A3
ASCOT PLACE - 48 Elm Street, Cooroy QLD
NORTH
JOB NUMBER: 23123 CLIENT NAME: IRONBARK SMSF PTY. LTD.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 3 pages
Page 2
14. Bio-Basin
LANDSCAPE NOTES 10. Containerised Plant Material - Supply and Installation Bio Basin filter media to contain 5% organic matter to support plant growth as per Water by Design Guidelines. Provide filter
EXTENT OF WORKS All planting is to be carried out in a manner consistent with good horticultural practice. All plant stock is to be in accordance with the scheduled media test results to confirm organic content. Plant Macrophytes with pre-soaked water retentive material such as coir and slow
nomenclature, well formed, hardened off nursery stock. They are to be container grown in potting mixture with a healthy root system and not release plant starter fertiliser. In the absence of regular rainfall, ensure basins are watered twice weekly through a 3 month
Contractor shall allow to carry out items of landscaping as detailed on the Landscape Plans listed on 23123 Cover Sheet CD-000. pot bound. All pots shall be free of weeds and plant stock is to be free from living insects, pests and disease. All plants are to be fully sun or establishment period.
Contractor to ensure they have the latest issue of the documents prior to tendering and construction. Contractor should also shade hardened-off to suit their on-site growing position for a minimum period of 6 weeks. Contractor shall be responsible for replacing failed
take full account of documentation of Architectural, Civil Engineering, Hydraulic Engineering and Electrical Engineering works plant stock within the 12 month maintenance period. It is therefore recommended that the Contractor does not accept below Standard stock 15. Irrigation System
which will be made available on site. Hard surface layout is to be at the discretion of the Project Manager. Where there is from the Nursery/Supplier. Contractor is to install D&C fully automated irrigation system including pumps, valves, controllers and irrigation components.
conflicting information, contact the Landscape Architect. Landscape works for this contract are to include the following: Refer to separate Irrigation Performance Specification, design intent and plans. Connection provided to town water supply and/or
Ensure sufficient supply of each species shown on the drawings is available to achieve the required layout and densities, and in the event of rainwater tanks when available.
1. Co-ordination with Other Trades and Conduit Installation supply for replacement stock due to failure, damage, unhealthy specimens or theft. Prior to plant stock arriving to site, a Nursery inspection
2. Removal of Debris including the Landscape Architect and Landscape Contractor is required. The plant supplier is to ensure all stock (or good selection of stock) is 16. Services
3. Sediment and Erosion Control present during the inspection. It is also recommended that the Landscape Architect is on site to inspect plant stock and plant set out prior to The location of all underground or overhead services shown on these drawings are indicative only. They have been incorporated
4. Excavation and Drainage of Planting Areas planting. at the design or Council Approval stage for general information. The Landscape Contractor shall be responsible for liaising with
5. Topsoil - Supply and Incorporation the Principal Contractor to determine where the 'As Constructed' location of all water, sewer, stormwater, electrical,
6. Soil Amendments Plant stock notes: communication or other existing services before commencing any excavation works.
7. Edging to Planting Areas - where not already supplied - Container sizes are noted as follows:-
8. Shaping of Garden Areas - Pots in millimetres. 17. Inspection Plan & Shop Drawing Review
9. Fences - Bags in litres. The Contractor shall co-ordinate the following inspections with the site superintendent:
10. Containerised Plant Material - Supply and Installation - Stock may be rejected if plants are:- - "Pre-start" - prior to commencement of works, for setout approval and construction timetable
11. Street Tree Planting Location Notes - Undersized proportional to specified container size or if the root system is underdeveloped. confirmation.
12. Garden Mulch - Supply and Spread - Oversized proportional to specified container size or severely root bound. - Excavation inspection - at completion of excavation and drainage works and prior to topsoil addition.
13. Turf - Supply and Lay - Unbalanced or uncharacteristic of normal or specified growth pattern for the species. - Pre-planting inspection - at commencement of placement of advanced plant material.
14. Bio-basin - Not suitably acclimatised for the specific environment. - Setout inspection - at first setout of containerised plant stock.
15. Irrigation System - Diseased, infested with pests or suffering from other form of significant stress. - "On Maintenance" - at practical completion.
16. Services - Have poor root development or root defects. - "Off Maintenance" - 365 days after practical completion.
17. Inspection Plan & Shop Drawing Review - Substitution of specified plant species only by written instruction from Landscape Architect.
18. As Constructed Requirements Contractor to provide shop drawings and structural design certification for review and approval of any custom designed
19. Maintenance of Landscape Works (12 months) Implementation notes: structures, furniture or fencing.
20. Landscape Carbon Emissions Ensure all planting procedures result in healthy plant species within the prevailing soil, climatic and management environment of this project.
21. Podium Soils The following minimum is expected: 18. As Constructed Requirements
- Excavate a hole for each plant twice the diameter of the rootball and 100mm deeper than the root ball. Break up the base of the hole to The Landscape Contractor is to clearly mark up and provide the Landscape Architect any changes to the built landscape from the
1. Co-ordination with Other Trades a further depth of 100mm and loosen the sides of the hole. issued construction drawings. As Constructed information is to include dimensions, materials and depths which vary from and/or
Contractor is to make full allowance for the reasonable activities of other trades. Where directed by the Principal Contractor all - Remove the plant from the container with minimum disturbance to the root ball, place in final position, ensure it is central are not included on the construction issue plans. Contributed Landscape Assets are to be captured and included in the ADAC
must comply with soil and erosion control measures. Contractor shall allow for the installation of electrical services for and plumb. Ensure the root ball is level with the finished surface of the soil surrounding the hole or bed. survey for the development as per the Sunshine Coast Council As Constructed Data Standards and Guidelines. The Landscape
- Ensure correct placement of fertiliser requirements such as Nutri-Tech Solutions 'Life-Force Gold' + Life Force Carbon is Contractor is to coordinate asset capture with the Project Surveyor and allow for hold points accordingly, especially with
landscape lighting at the appropriate time in the construction program. Contractor shall pay due consideration to installation of
ameliorated into existing or imported topsoil and that any water retention additive and the above fertilisers are installed as per the underground services. Landscape contractor is to provide the following documentation as relevant:
irrigation lines so as to minimise disturbance to planted areas. The coordination of appropriate conduit lines forms part of this
manufactures specification. - Certification that all street trees comply with AS2303:2018.
contract. Contractor shall take due care with any machinery to site. Particular care is to be taken with newly poured concrete
- Thoroughly water plants immediately after planting with sea change KFF and at such times during the contract period - Contractor to provide MDS or Product Data Sheet of any proprietary furniture or structural items.
curbing and with newly laid A.C. road surfacing. Any damage to existing structures or services will be rectified at the contractors
as required. All large stock will require a minimum of 10ltrs of water and smaller stock 5ltrs of water at the time of planting. - Certification of supplied topsoil to AS4419
expense. Any disputes will be settled by the site Superintendent.
- Backfill with topsoil as specified. Lightly tamp and water thoroughly to eliminate any air pockets. Ensure that - For amended site topsoil provide delivery dockets of ameliorant to confirm quantities supplied.
topsoil is not placed over the top of the rootball.
2. Removal of Debris
19. Maintenance of Landscape Works
Site is to be cleared and is to remain clear of any deleterious material prior to commencement and throughout construction of
All advanced trees 25L or greater are to be certified as AS2303 compliant. Contractor to sight and supply certification to superintendent The Maintenance Period commences at the date of Practical Completion of Works. During the Establishment Period maintain best
landscape works. Planting areas are to contain planting and selected drainage materials only and are not to contain any
prior to accepting trees from the nursery. Contractor is to review all tree stock at unloading and prior to planting to ensure the compliance with horticultural practices including (but not limited to) the following items where required: watering, weeding, fertilising, pest and
building material waste.
the below. Trees that fail these criteria should not be planted and are to be returned to nursery disease control, mulching, pruning, rubbish removal and keeping the site neat and tidy. Rectify defects that become apparent in
- Roots should be of good form and free from circling, girdling, J-rooting or other defects/abnormalities. Contractor the works under normal use.
3. Sediment and Erosion Control
to tease out roots and prune as required to encourage healthy root development.
Where directed by the Principal Contractor all must comply with soil and erosion control measures. Refer Civil Engineers
- Trees are to be self supporting, of good form and health with single undamaged leader, no bifurcations or bark inclusions. The Landscape Contractor is to allow for topping up mulch, rectifying defects, top dressing sunken edges, replacing failed or
drawings for all sediment and erosion control measures. under-performing plant stock at the end of the Maintenance Period. All Council controlled works to be inclusive of a twelve (12)
- Ensure trunk is not buried below flare in trunk at top of roots, contractor to scrape off excess potting mix as required.
month maintenance program.
4. Excavation and Drainage of Planting Areas Collect all empty plant containers daily during planting operations, remove from site and return for nursery to re-use. Do not vary the plant
Break up and remove any asphalt, roadbase material or excess concrete slurry from kerbing works to achieve required planting locations from those specified on the drawings unless otherwise directed by the Superintendent. Should it be necessary to vary the locations and Maintenance and Inspection Program:
depths. Excavate site soil as required to ensure consistent high quality planting material. Break up existing subgrade to a depth spacing for any reason, immediately apply for directions by the Superintendent. Replace failed or damaged plants. This does not include Responsibility Weeks after practical completion Maintenance Inspection Frequency
of 300mm. Any excavated planting areas are to be scarified at sides to provide anchorage for future root development. vandalised or stolen plant material - this will be replaced prior to practical completion. Trees are to be planted 20-30mm above finish level to Contractor 0-2 3 per week
Additional excavation works will be required in areas of advanced plant material. Drainage is to be incorporated to all planting allow for settling. Contractor 3-4 2 per week
areas that are enclosed by hard edging and not otherwise drained. Contractor should allow for drainage to all garden areas. Contractor 5 - 13 1 per week
11. Street Tree Planting Location Notes. Contractor 14 - onwards As per established maintenance regime
5. Topsoil - Supply and Incorporation Locate road verge street trees in accordance with Local Authority Requirements or as indicated below:
All soils are to comply with AS 4419 Table 1 (both site topsoil and imported topsoil) - Minimum 2.0 metres from driveway cross over. Maintenance Program General Notes
Topsoil for garden areas should be a minimum 300mm depth. Where available maximise the use of soil from on site. Site topsoil - A minimum of 1.0 metre from all services to prevent root/service conflict and to provide future ease of maintenance requirements. - Maintenance inspection frequencies are minimum.
shall be screened to break up clumps, remove unwanted material and ensure soil is easy to work. Screening to take place within - A minimum of 2.0 metres from stormwater pit. - Monitor plant performance and stress constantly and take appropriate remedial action. Soil moisture
2 weeks of requiring soil for use. Top soils are to be tested for horticultural suitability and receive appropriate amelioration if - A minimum of 4.0 metres from street lights. levels are critical during early establishment. Avoid over irrigating planting areas.
required. All topsoil must be free from noxious weeds, rocks, roots, nut grass, rubbish or any other deleterious material. - A minimum of 750mm behind the kerb or centrally if between footpath and back of kerb.. - Mow turf every 2 weeks.
Place all topsoil in the areas directed and specified. Ensure that the topsoil is spread and graded evenly to prevent any ponding. - Prune and shape all shrubs and trees on a monthly basis as required.
Prevent excess compaction by construction plant. Stripped site topsoil needs to be stored in piles no greater than 2m high x 3m 12. Garden Mulch - Supply and Spread - Remove all stakes at 90 day inspection, or after satisfactory establishment.
wide. Topsoil storage piles for storage greater than 4 months should be seeded with a suitable grass mix and screened prior to All mulch is to be free of deleterious or extraneous matter such as soil, weeds, rocks, and twigs. The finish level of the mulch is to be level with - Fertilise all garden beds and street trees at 3 monthly intervals.
use. Eradicate weeds using environmentally acceptable methods. Project Urban discourages the use of Glyphosate and is happy the finish level of all adjacent surfaces after settlement allowances of the topsoil and mulch. Ensure all mulch is placed clear of plant stems to - Contractor shall maintain an up to date written log book to record inspection observations and actions.
to discuss alternative options with the Landscape Contractor. Noxious weeds need to be screened out of the topsoil prior to avoid rotting at ground level. Mulch is to be coarse chipped forest mulch (a combination of wood, leaves and bark) with no more than 10% fines - The log will be made available to the site superintendent, upon request, at any time for examination.
placement. nominal 25-50mm size or approved equal. Mulch shall be to a predominant depth of 100mm as described above. Mulch is to be formed to avoid
placement against green plant stems and overflow from purpose formed edges, kerbs and pathways. Samples of all mulch types to be provided 20. Landscape Carbon Emissions
6. Soil Amendments to Landscape Architect for approval prior to installation. Reduction of greenhouse gasses created during the construction or maintenance of the landscape works and embodied
The Contractor shall allow to amend the garden and podium soil with the following components, to be confirmed by soils test: greenhouse gasses in materials is strongly encouraged. Contractors are to provide a written statement outlining carbon reduction
- Nutri-Tech Solutions 'Life Force Carbon' - Spread a 3 - 5 mm layer of Life Force® Carbon™ over garden beds. Work into 13. Turf - Supply and Lay measures adopted by their business which are applicable to this project. These could include items such as the following:
the top 10- 15 cm of soil where practical and water in well. Apply 2-3 times a year for best results. Planting New Trees: 1 - Obtain turf from a specialist grower of cultivated turf. · Use of electric powered equipment for construction and maintenance
2 cups per tree in the hole. Turf notes: · Use of electric or hybrid vehicles or fleet for transportation and construction
- Nutri-Tech Solutions 'Life Force Gold' - For Landscapes - 200 g (or 1 cup) per square metre and for Podium Media - 15 - "A" Grade turf as per Material Schedule with a minimum sod depth of 25 mm · Purchase of power from sustainable sources or production of own power through Solar PV cells
grams per litre - Turf to be laid within 24 hours of being cut and on day of delivery. · Use of organic fertilisers rather than petrochemical products
- Grade turf areas evenly with falls to drains. · Use of low carbon concrete or materials fabricated through low carbon supply chains
7. Edging to Planting Areas- where not already supplied - Allow for ground preparation and placement of 100mm topsoil to specification requirements. · Use of local materials with low transport carbon costs.
All planting areas adjoining turf are to be edged as specified on the landscape plans or detail sheets. Edging should finish flush - Apply 'turf starter' fertiliser prior to laying (as per Manufacturer's specifications). · Offsetting greenhouse gas emissions through accredited offset schemes
with adjoining finished levels and hard pavements. Round / Ease all edges where applicable. - Lay turf parallel to slope contours with staggered, close-butted joints so that the finished turf surface is flush with
adjacent finished surfaces. Project Urban is in the process of reviewing products that we specify to favour the use of low embodied greenhouse gas
8. Shaping of Garden Areas - Turf to be laid 10mm proud of adjoining surfaces to allow for settling of topsoil and to ensure there is a flush finish at at emissions materials. Contractors should review materials schedules and ensure their pricing reflects the specified materials.
Planting areas are to be finished in a well mounded fashion to facilitate drainage of excess water and to show planting to best the end of the maintenance period. Substitutions of materials should consider the embodied greenhouse gas in those materials. We are happy to consider alternative
advantage. Mounds to be generally of 1:3 max and 1:5 minimum at time of practical completion. - Water in well and roll after laying to remove undulations - ensure all joins are gap-free. Top-dress any gaps or lower carbon footprint products suggested by the contractor.
undulations with coarse washed sand.
9. Fences - Keep lawn moist until established and rooted in. Install temporary barriers (flagging tape) to ensure walking and driving on turf areas is
All fences and footings to be located within private property where applicable. Fencing to common boundaries are to be prevented and avoided.
located on the boundary line as determined by a registered surveyor. Refer to Fencing notes and specification. Where new - Replace failed turf and relay with new turf.
fences are indicated on the drawings, existing fences are to be demolished, unless otherwise noted.
Revision Date Amendment Drawn Checked
APPROVAL ONLY
SPECIFICATION NOTES NOT FOR CONSTRUCTION
A
B
21.03.2022
30.05.2023
For Approval
For Approval
XL & PS
XL
PS
CS
CD-001 scale: N/A
ASCOT PLACE - 48 Elm Street, Cooroy QLD
JOB NUMBER: 23123 CLIENT NAME: IRONBARK SMSF PTY. LTD.
Page 3
LEGEND
LANDSCAPE
TURF TYPE 1
T1 Refer details drawings
Bio-basin Base Planting
BB1
General Planting Type 1
GB1 Deep Planting
EG-1 Edge Type 1
Refer to detail
E
IRRIGATION
IR REFER TO MATERIALS
PEARL STREET & FINISHES SCHEDULE
E
MULCH ONLY
1 WAT SWE
GROUNDCOVERS/SHRUBS
E
1 WAT SWE
SW SW SW HEDGES
SW
E
SW
12 LOM VER MULCH
T1 6 DIE GS 12 LOM hys 8 DIE GS EG-1 ACCENT SHRUBS
12 LOM hys
E
10 LOM VER 1 CAL vim
SW
1 CAL vim 2 BAN BC MULCH
1 CAL vim
EG-1 TREES
E
2 CAL AW
GB1 GB1 8 DIE GS GB1
Overhead powerlines. 12 LOM VER
SW
1 EXISTING TREE TO BE REMOVED
T1
G-
E
S S S S S S S S
T1 E
EG-1
EG-1
EG-1
EG-1
EG-1
T1 T1 T1
E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E
E
E
2 CAL AW 12 LIR AME
SW
E
S
E
E 12 LOM hys 60 LIR AME 12 LIR AME 3 XAN LP 3 XAN LP 12 LOM VER
E
20 LIR AME 4 CAL AW Overhead powerlines.
1 BAN BC 5 COR RUB 1 BAN BC
IR IR IR IR IR IR IR IR IR IR IR IR IR IR IR IR IR IR IR IR IR IR IR 12 LOM hys
SW
E
GB1 GB1 56 LOM hys
S
IR
IR
EG-1
T1
4 LOM VER 6 LOM VER
5 COR NEG 3 BAN rob
E
5 COR NEG 5 COR RUB 1 WAT SWE
STREET
UP
3 XAN LP 3 XAN LP
SW
5 LOM VER GB1
S
8 7 6 5 4 3 2 1
4 LOM VER
E
1 WAT SWE
IR
5 CAS CI 6 VIO hed
8 LIR AME
IR
3 CAL vim 1 BAN BC 1 CAL sal
SW
ADJOINING LOTS
S
E
6 PHI XAN 6 LIR AME
IR
1 ALP cae
5 COR KIW
3 BAN rob
IR
5 LOM VER GB1 TENANCY 3
3 DRA fra
E
IR
96 m²
SW
S
1 ASP nid Stormwater Easement. Refer engineer's drawings.
IR
BUILDING 5 COR RUB Blockwork wall. Refer engineer's drawings.
E
IR
7 SCA ame
Refer Architect's Drawings Masonry Retaining Wall & vehicle barrier.
6 PHI XAN 1 BAN BC
IR
SW
S
5 COR NEG TENANCY 4 1 CAL sal
GB1
E
12 BLE ind
IR
5 LOM VER GB1 103 m²
1 ASP nid
IR
6 SEN ser
3 DRA fra
E
1 ALP cae
IR
SW
S
5 CAS CI
IR
GB1
6 PHI XAN 1 BAN BC TENANCY 2 3 BAN rob
E
IR
5 COR KIW 6 LIR AME 61 m²
6 VIO hed
5 LOM VER 9 LIR AME
SW
IR
S
GB1 1 CAL sal
E
IR
1 ALP cae
IR
3 BAN rob
12 PHI XAN 5 SCA ame
SW
E
S
3 XAN LP TENANCY 1
ELM
6 SEN ser 6 CAR app
61 m² 15 LOM hys 12 FIC nod
E
GB1 30 LOM hys
SW
S
BB1 6 CAR fas
6 JUN usi
E
SW
S
E
ADJOINING LOTS
E
S
E
S
E
S
Revision Date Amendment Drawn Checked
APPROVAL ONLY
LANDSCAPE PLAN NOT FOR CONSTRUCTION
A
B
21.03.2022
30.05.2023
For Approval
For Approval
XL & PS
XL
PS
CS
CD-100 scale: 1:100@A1; 1:200@A3
ASCOT PLACE - 48 Elm Street, Cooroy QLD
NORTH
JOB NUMBER: 23123 CLIENT NAME: IRONBARK SMSF PTY. LTD.
Page 4
Notes:
- Place the rootball on a firm base.
- Thoroughly water the root ball immediately after planting.
- Cultivate sides of excavated hole 50mm deep. Notes:
- Do not disturb kerb, road pavement or road side drainage works. - Place the rootball on a firm base.
Notes: - Tease out roots on side of rootball when planting. - Thoroughly water the root ball immediately after planting.
- Place the rootball on a firmed base to achieve required FSL. - Ensure top of rootball is not buried; expose and set flush with finished level. - Cultivate sides of excavated hole 50mm deep.
- Thoroughly water the root ball immediately after planting. - Do not disturb kerb, road pavement or road side drainage works.
- Number of stakes will vary with pot size. Refer plant schedule. Set soil level at top of - Tease out roots on side of rootball when planting.
- Cultivate sides of excavated hole 50mm. rootball (at flare of trunk) - Ensure top of rootball is not buried; expose and set flush with finished level.
Pull away mulch
from base of plant
50x50x2400 HW Timber stake: Form mulch berm
Place 600mm into the ground. Do to the perimeter of
not place through rootball. Secure the rootball
Hardwood Stake:
25x25x90mm Place 600mm with hessian ties by looping in a
figure eight pattern. Hardwood stake: Place 600mm
into the ground. Do not
into the ground. Do not place
place through rootball.
through rootball. Secure with
Secure with ties by looping Distance to local
Raise plant 20-30mm above ties by looping in a figure eight
in a figure eight pattern. authority
top of kerb. pattern.
requirments
Mulch: Pull away from Raise plant 50mm above
base of plant. Do not excavate finished surface level.
within 50mm of
Mulch: Pull away from base
Form an earthen basin edge restraint or
of plant.
around base of plant. pavement. 100
Top of Kerb Form an earthen basin
FSL around base of plant.
Topsoil blend
50
300
Fertiliser: Do not allow 2
contact with roots. Topsoil blend
min 300
Topsoil blend 1 1
1 Water retention additive
Water retention additive
Bio-degradable Geo-fabric Fertiliser: Do not allow 1
Water retention fertiliser to come in 1
additive contact with roots.
01 140-300mm PLANTING 100mm drainage gravel in width (w)
CD-200 1:10@A1, 1:20@A3 10 - 20mm Drainage gravel
heavy or poor draining soils. Connect drainage gravel 2xw
to back of kerb, subsoil
Incorporate slow release organic drainage where
fertilizer and water retention applicable
additives to backfill per
Manufacturer's recommendations
03 45-200ltr PLANTING
CD-200 1:10@A1, 1:20@A3
FSL
Mulch
- to 100mm depth
Soil blend or site topsoil
- to 300mm depth
02 STREET TREE PLANTING
CD-200 1:10@A1, 1:20@A3
All trees to have 100% NATSPEC inspection prior to delivery to site
Cultivated subgrade
- to 150mm depth
Notes: FSL
(X)
- All timber to be CCA pressure treated to Macrophyte planting with Jute mesh/coir netting. With
AS1604, Hazard 5, rough sawn pine. root ball fully into media and 300mm long pins at twice
Timber edge pull foliage through netting
- All timber edges to be arissed to comply recommended rate to prevent
with council standards. the mesh from lifting.
04 GARDEN BED PROFILE - All timber ends to have one coat of Stakes
CD-200 1:10@A1, 1:20@A3 Cuprinol or equal prior to installation. Filter media and drainage per
- Stakes to be 400mm into ground at max. engineer. Filter media to contain
1200mm centres, or as required to obtain Existing/compacted 75mm thick coarse
5% organics per water by
smooth curves. Top of stake to finish /subgrade/subase straw/ sugar cane mulch
design guidelines
20mm below top of timber edge. Where with minimal fines.
timber edges meet at corners provide
double stakes.
- All fixings to be hot dipped galv.
Turf as specified
- Leading edge is to be free of burrs and
splinters. 07 BIO-BASIN PROFILE
Topsoil CD-200 1:10@A1, 1:20@A3
- to 100mm depth
Cultivate subgrade TIMBER EDGE STAKES (X) = Height above
- to 150mm depth 38 50 finished surface level FIXINGS
Existing subgrade 50mm Bugle Headed
FLUSH
Batten Screws.
100
20mm 75mm Bugle Headed
Batten Screws.
100mm
05 TURF PROFILE 150mm
100mm Bugle Headed
Batten screws.
CD-200 1:5@A1, 1:10@A3 100x38mm
50x50mm
06 EDGE TYPE 1
CD-200 1:5@A1, 1:10@A3
Timber garden edge Revision Date Amendment Drawn Checked
APPROVAL ONLY
CONSTRUCTION DETAILS NOT FOR CONSTRUCTION
A
B
21.03.2022
30.05.2023
For Approval
For Approval
XL & PS
XL
PS
CS
CD-200 scale as noted
ASCOT PLACE - 48 Elm Street, Cooroy QLD
JOB NUMBER: 23123 CLIENT NAME: IRONBARK SMSF PTY. LTD.
Used in these records
landscaping.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.9 MB (small file)
- File type
No other editions are linked here.