Appendix D - traffic impact assessment
Attached to the e-mail MCU15/0111 & REC15/0031 Development Application D - Traffic Impact assessment Email 5 of 8.
3 TRANSPORT NETWORK ASSESSMENT
The traffic and transport impact of the proposed development will be considered in this section. For the purposes of the
assessment, it is anticipated that the proposed development will likely be fully developed by the beginning of year 2018.
The 10 year post-construction design horizon will therefore be 2028.
3.1 TRAFFIC GENERATION
The trip generation rate and development traffic for each of the site uses is shown in Table 3-1.
The trip generation rates have been based on the RTA Guide to Traffic Generating Developments. The trip generation
rate for ‘Housing for aged and disabled persons’ is 1 – 2 daily vehicle trips per dwelling, or 0.1 – 0.2 evening peak hour
vehicle trips per dwelling. The guidelines indicate that the trip generation rates of resident funded facilities are generally
greater than subsidised facilities as indicated by the higher end of the range. Therefore a rate of 0.2 evening peak hour
vehicle trips per dwelling has been adopted for the 120 bed aged care facility within the site. A higher trip generation rate
has been applied to the ILUs within the site that is consistent with the RTA Guidelines in relation to medium density
residential flat buildings for smaller units and flats (up to two bedrooms), that is up to 0.5 weekday peak hour vehicle trips
per dwelling. The trip generation rates for the retirement community do not assume a level of self-containment (within the
site), although it is highly probable that some trips will be social visits or recreational trips internal to the retirement
community. Do note that the following assessment is conservative in this regard.
The community facilities within the site are intended for use by the residents and their visitors only. Therefore all trips
associated with the community facilities at the site are internal trips only.
Table 3-1: AM and PM Period Weekday Trip Generation Rates
Proposed Site Activity Number of Units/Beds Final AM Period Trips Final PM Period Trips
Aged Care Facility 120 beds = 0.2 * 120 = 0.2 * 120
=24vph =24vph
Independent Living Units (ILUs) 164 units = 0.5 * 164 = 0.5 * 164
= 82vph = 82vph
Total 284 units/beds 106vph 106vph
1
RTA or Roads and Traffic Authority NSW, “Guide to Traffic Generating Developments” (2002).
Note that there are three proposed accesses to the site, with development traffic proposed to access the site as follows:
Person Road access: proposed access for the 120 bed facility only
Trading Post Road: proposed access for approximately 50% of all trips associated with the ILUs
Lamonts Road: proposed access for approximately 50% of all trips associated with the ILUs
The directionality of trips in/out of the site is as follows:
In/out split of 30/70 during the AM peak hour, with the reverse during the PM peak hour
B14158ER01 | TRAFFIC IMPACT ASSESSMENT | PALM LAKES RESORTS COOROY RETIREMENT COMMUNITY | 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.