Original source · versioned page text
Appendix D - traffic impact assessment
Attached to the e-mail MCU15/0111 & REC15/0031 Development Application D - Traffic Impact assessment Email 5 of 8.
3.3 LINK ASSESSMENT The key road corridor for the proposed development site is Elm Street (Cooroy Connection Road) that runs along the site frontage. This route is single lane carriageway within the development area of interest. The location of the route within the local road hierarchy is an arterial route. Arterial routes consisting of single lane carriageway can typically accommodate an “amenity” volume of 950 vehicles per hour per lane. Further south of the site at Diamond Street eventually becomes the Cooroy – Noosa Road arterial link to the east. Similar to Elm Street, this arterial road is single lane carriageway and can typically accommodate an “amenity” volume of 950 vehicles per hour per lane. The local roads Lamonts Road and Trading Post Road within the vicinity of the site are no-through routes. Since these routes currently provide property access to local residents only, and are lowly trafficked (anticipated <200vpd) Lamonts Road and Trading Post Road have not been included in the following road link assessment. However do note that Lamonts Road is currently unsealed along its entire length, and provides access to several residential dwellings (estimated to be less than 5) as well as the heli-aviation company. Austroads Guidelines indicate that unsealed road links may accommodate up to 150vpd. It is anticipated that the background traffic volumes along Lamonts Road currently exceed this threshold. The development traffic along Lamonts Road may vary up to 410vpd along the western extent of the route. The existing 2014 estimated through traffic volumes and the future 2028 traffic volumes have been obtained from traffic counts as well as traffic survey data obtained from the Department of Transport and Main Roads. The road link assessment in Table 3-5 indicates that the road corridors surround the site are generally operating with reserve capacity at the link level. However, the capacity of the major arterial route Elm Street in the southbound direction is constrained from Pearsons Road south to Diamond Street. The development traffic is anticipated to have minimal impact on the practical capacity of the existing major road corridors during peak periods. The proportion of heavy vehicles accessing the site is negligible with only about 2 service vehicles per day expected. The road corridors in the vicinity of the proposed development site are anticipated to provide good emergency vehicle access surrounding the proposed site. There are many passing opportunities for private vehicles to allow for emergency vehicle priority, as all of the streets and roads surrounding the site are two-lane or their width allows for stopping opportunities. B14158ER01 | TRAFFIC IMPACT ASSESSMENT | PALM LAKES RESORTS COOROY RETIREMENT COMMUNITY | 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.