Original source · versioned page text
Appendix D - traffic impact assessment
Attached to the e-mail MCU15/0111 & REC15/0031 Development Application D - Traffic Impact assessment Email 5 of 8.
Traffic Analysis and Reporting System
AADT Segment Report TARS
Region 207 - North Coast Road Section 145 - Cooroy Connection Road
14-Nov-2014 11:54 Road Segment from 1.960km to 3.090km Segment Site 21130 Traffic Year 2013 Data Collection Year 2013 Page 2 of 2 (2 of 7)
Site 21130. Point 220000301.
Cooroy School Pedestrian Crossing.
2.19 km
The width of each Road Segment is proportional to its AADT.
1.96 km 3.09 km
Start Point 220000102. End Point 220000104.
All Vehicles (00)
G 3,676 100%
A 6,199 100%
B 9,875 100%
No Traffic Class data found.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.