Original source · versioned page text
Appendix D - traffic impact assessment
Attached to the e-mail MCU15/0111 & REC15/0031 Development Application D - Traffic Impact assessment Email 5 of 8.
2.3 EXISTING TRAFFIC CONDITIONS
The existing roadway network in the immediate vicinity of the site is comprised of the arterial roads Elm Street (Cooroy
Connection Road) and Tewantin Road (Cooroy-Noosa Road). Both of these routes are within the jurisdiction of the
Queensland Department of Transport and Main Roads. Elm Street (Cooroy Connection Road) fronts the western
boundary of the site. Tewantin Road (Cooroy-Noosa Road) begins as Diamond Street, at the intersection with Elm Street
approximately 1.5km south of the site. Refer Figure 2.1.
North
Trading
Lamonts Road Post Road
Elm Street (Cooroy
Connection Road)
Pearsons Road
Diamond
Street
Figure 2.1: Site Locality (Source: Google Maps)
Elm Street (Cooroy Connection Road) is a two-way arterial that is sealed single lane carriageway along its length.
Adjacent to the site boundary, Elm Street has a posted speed environment of 100km/h, however the section of Elm Street
south of Pearsons Road has a posted speed environment of 60km/h. Further south of Pearsons Road along Elm Street
there is a school zone with warning signage and speed reductions applicable during school periods. Along its route, Elm
B14158ER01 | TRAFFIC IMPACT ASSESSMENT | PALM LAKES RESORTS COOROY RETIREMENT COMMUNITY | 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.