(Optional) Drainage holes can be drilled to help trapped water flow out of the bottom Wall Channels. After assembling the
Walls, drill 6mm holes spaced approximately 350mm apart through the bottom Wall Channels of each Wall. Ensure holes are
located in-between Sheet crests. Ensure metal filings are removed from the channels as to prevent rust spots from forming.
Drain Hole
350
mm
Wall Channel
FIGURE 1.2
WALL CHANNEL ASSEMBLY
Slide two Wall Channels into a Wall Channel Joiner. Ensure the six middle pre-punched holes of the Wall Channel Joiner and
Wall Channels line up. Fasten four 10x16 Hex-Head Screws through the four middle pilot holes of the Wall Channel Joiner and
into the Wall Channels (Figure 2.0).
Assemble three more Wall Channel Assemblies in the same manner so that there are four Wall Channel Assemblies.
Wall Channel
10x16 Hex-Head Screw
Wall Channel Joiner
Wall Channels fit
into Wall Channel Joiner
Wall Channel
FIGURE 2.0