Council archive · source document
23247 DA - Request to change a development approval -(Extend Curency Period) [As Published] · 132003.220721.3
rat fami2i =) Application: Update Document Edit Property | Names. ,, Tasks} Payments * Applications: Other Links : Help: . 7 “paths or cling ask foi Help''|: Mapping i) Marios ‘| Desktop View: | mee [Materigl Change of Use ! Precis [23247 OA Change'a Developme Date (03/05/2007. Ya) «Date [Fe 143} T]Oficer FFU estan: si) Pe Location [157 Thursday, May 03, 2007 02:31 PM User: tsweeney Computer: D1935 Os: Windows NT Version: 5.1 Change this text under Options -> Define Footer Text ... NOOSA COUNCIL ABN 97 969 214 121 9 Pelican Street Tewantin PO Box 141 Tewantin Q 4565 Phone: 07 5449 5200 Fax: 07 5447 1062 Email: [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 31 pages
Page 2
NeeLeKy we Checklist - Applications Involving Land
Development & Land Use Sections
IDAS APPLICATION
This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.
Form 1 Part A
1.1.1 Ensure that the form is fully completed.
1.1.2 In the case of an MCU or Op Works below the high-water mark, owners consent is required.
1.1.2.1 If there are multiple owners, the consent of each owner is required.
1.1.2.2 _ Ifthe owner of the land is a company, either ACN No. or Company Seal required.
4.2. Form’ Part B-O Supporting information
1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached. Lt]
1.1.2.4. Ensure that each of Forms B-O which are attached ae ny ee completed. [U]
re Se REFERRAL INFORMATIONS aot Tee UNL ee ee Rf
2.1. Ensure that items 1-23 have been checked and/or completed with regard to referrals. Cy
is ENVIRONMENTALLY. RELEVANT ACTIVITIEST NE, odunseeael
3.1 Ensure that Part G is completed if EPA referral is required.
3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the *speiaen
applicant details and owners consent.
BLP LANS LE ERE TE ea eo eR
5. v Ensure tha at least 6 sets of the Plan of Development (5 for Reconfiguration and Operational
Works) accompanies the application. In addition ensure that each set is complete. Le
6.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or Ad format and.is
unbound.
ORTING:INFORMA TION ganares
6.1 Ensure that at least 6 copies of any report accompanies the application (5 for Reconfi iguration
and Operational Works). If the application is accompanied by a covering letter, ensure that it is
capable of reproduction.
6.2 Inthe case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound.
74 Ensure that the ® apalcation fee, as determined trom the “Counc s adopted scale of fees,
accompanies the application or has been paid.
7.2. Ensure that the fee which has been paid is recorded on the application form.
Receiving Officer AL. 6 eeeeeees Krom vce eeeeeenaeee Date .....7. 3{sfe7 cetdeeeeeeeee
Having completed this form and accepted the apftication, please deliver both to the following IDAS Application Receiving
trays:-
«Ifthe application is for a Material Change of Use exclusively -AOP1's desk in the Land Use Section.
« Ifthe application is for an Material Change of Use & Reconfiguration - AOP1’s desk in the Land Use Section.
¢ — (fthe application is for Operational Works (for parking, access, sewerage or drainage) exclusively - AOD2 in the
Land Development Section.
¢ Inall other circumstances ~ AOP1's desk in the Land Use Section.
Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.
SEP] g:\ant\forms\application checklist.doc
Page 3
3.May. 2007 12:31
INTEGRATED PLANNING ACT 1997
MARTOO CONSULTING
No. 0472 -P. 2
Form 2, Vereton 3.3, 20 May 2006
Form 2 Development Application
Request to change ay
existing approval
Description of land
All land the subject of the application musi be
Kentfed,
Advice for competing O4
A description of the tand Is nol required In
- elation fo amobife ar temporary
eon relevanl activity.
Heng Q2 and Q3
Provide the ‘niomaton (rom the existing
approval thats the subject of this request for
change
Advice for completiria O4
Q4 applies if development fs proposed in a
waler body or walerpourse
Advice for completing QS
Mos\ land can be Wentified by a Jot on plan
description. These details can be obtalned rom
itte documents of trough the local
goverment.
However, Hf the tand on iwhich the development
'S proposed doas 10! have a [ol on plan
__ deseription (Le. the development fs proposed in },
awaler cr watercourse) -
() provide the fol. plan deseripfion forthe
. adjolning/adiaoan| kang; o”
(il) (provide GPS Coordinates whare thate is no
adjoining/adjacén| fand (ie. in Moreton
Bay).
Advice for completing O9
9 does nol apply if the development is
proposed within o Waler body or iwateroourse
Advice for complaling Q10
Q10 only spplies d development is proposed
within a local government area.
Tidal areas arg below high water mark and are
Aofwilhin a tocal goverment area.
Advice forcompteting Q11
QUT only apples 4 development Is propoend on
strategic part land or a slrategic porl fand tidal
area,
For more Information refer to Guide 14
Davaloment on strategle port land
Note: These details will be included In the
orginal decision notice for the approval you
ow wish to modify,
Sheet address tecuang owe one, steel name, ssbvbeay rane &
[ 39 Duke St, Sunshine Beach
Number on existing development permit or 3, - Date issued: .
. Preliminary approval sought to be changed: _ _-
23247 DA ] [44 August 2003 |
10.
11.
wr of water body or watercourse, within which lhe development is proposed: (f applicable) _
NIA
Lot on plan description (eg. Lot 129 on RP 4567)/GPS coordinates .
[ Lot 387 on RP 48112 ]
The above description is for: (Uck eppicable box)
[XI (i) the tand on which the development Is proposed; or
Ci) the land adjoining the water body or walercouree, within which the development fs
proposed; or
DiGi) the water body or watercourse. .
Shop / tenancy number: (ifepplicable) 8, Slorey//level: fagatcebi) .
[WAT = ° es ee
Total area of land: (mney
[ 707m2 ; . |
Local government area in which the land is situaled (og. Basbane, Esk, Hervey Bay, Woot ett.) (i
ble)
Noosa Shire Council : :
Port aulhorily for the strategic port land or strategic port land tidal area on which the
cc is proposed (6g. Port of Brisbane, Port of Townsyife) (ff appticable) .
NA |
Page 4
3.May. 2007 12:31 MARTOO CONSULTING:
89/85/2007 12:19 a7saaa No. 0472 P.
. hogy oat 3847 een GEORGE SIMARI PAGE inven
t geet fie VASO0 SOA OW : Voy ghee wee
NJEGHATED PLANNING ACT 1997 __ Form, Vorulon 3.3, 20 ap 2005
Applicant detalls . 49, Nama: _ _
ceedyMentiyubo net te apgtontnn. | { George Gimatl o- Narloo Consulting Ply Li
Tho appertcasen onthe oaner ef re * -
visa sasaie “143, Poctal address:
hau elontnpand lodaing ‘his. application {
‘The apatcant bs TASpONER iarensuang the PO Box 1684, Noosa Heads —
ufauniniicn prividod fe onemeel The
aT
assnssment aemnager, any referral agency and 16. Signore: ee 16, Qales
tha Chiot bxecttvo (hart Qpyaleabky) wal ely
i fis fafowmation whoo assessing and May 2007
deciding the optation, ! "
youmuaneamt | cage 7
‘con So Mu . ‘ __.
espn vo real io odes, (rawr _- oOo ~~)
47. Telephone numer: 18 Mobila number: (Pagpbeabls) _
ae) fd
. 19. Fexquaiber: jfepplinula) 20, Email address! (teppfeeby)_.__._—
. ‘ | 5456-5726 . [hannah @mastooe panieulling com _]
‘Land awmerle convonl (# appueatir) 21 Lend owners consent:
Secttan $.8.24(3) of the (PA requltes thal the
turd dm’ cangent mal bo pes .
shanga 08
ran waking the roquedl fo ‘ “ . ' 7
eelng ‘appt! Is nol ro Land owner, () Gaorge Binvalh Y bantawt = Mey 200 |
For information about and gumcrs refer to | | :
Guida | Makita en JD36 dsvoxormgf i) \F _|
eneieaica. { !
Lav quoes’s conser! Is 9) feqv0d for o ® '
Tugba or lemporary ERS. ‘ A —
m [_ 1!
Namie in Full . Signalyre Tote
Harowmer hag slanas inte fest Be
‘opplighht, Www algnatre ‘nol recpued og2'n
nis goction. :
Uprena azo moti’ oveneee, Uy covsent ot
Bath cwnet a Wed. : .
=— ————
Revooree eatilement (ropp’xe? — | 22. At The Gime of the requogl, would 2 davatopment sppscaton for the epprowed have required
+ Sactions 3.5 2244) 3 (5},3.9.2408) BRC). ovidence of resource endzeitieal? :
5.33418) ft} PA rej
asassida hGlaibaPhsay eis, | TRNO-steat Cves-snte
Be rmien ee pmeenelewe (73, Ishsrequsl accompanied by the win o:eement ft ciut neo tom nor te
tgeoureo, Rxben the reauasl was made-a . ot ie ns
deve'wnment eopeason bor Uva Sppaval wen kd pvidence is seabed” (xk Eve expicatle bor) .
‘ae ead viene of reszi me coc NO-py armen lig cet vnscetire rod eocbmpety PRIECTSS!
der S008 92.18) o TPA, Des egret Vtg Net pence Pn
“Watute of the request 96. This requastts for:
Ay person may cogs lo rods en eis Ba Anaatension of the relevant poriod for Ihe development approve! (82.622)
een C) To ehongo or cancel condiens (2252)
(To changs the devetopment aperoval joer lions are ctacontionl WIA1)
LJ A change to cnnctiions of 2 tezoning approval qian under tho PAE Act {s 6.4554)
95. Provide detals of, & justification (or, the proposed modetcaben :
“See corrasoendance dated 23 April 2607 :
|
+ “Concurrence agencies” TA Di the preiove applicalon involve concurrence agencies cr Eviding ceteral merce?
Upiers9 6 22( 1) S824 (1¥a) IPA, S NO :
copy of ig equest trust bo Forwarded 0 tah :
eonerrense foe re previous LI YES - eth ecieane epnctenxtn hve Ses sta a capy ate mes moe
appa pee to krdyérenl off form we { =
the asoeszment anage?, TQ |
Holes "No" wil obtaye epply 10m requect RD (i): :
uae conditions af a rezoning approval given i) —_——_ '
wuvdorthe PSE Act . - se
Page 5
*3May. 2007 12:31 MARTOO CONSULTING No. 0472 P. 4 INTEGRATED PLANNING ACT 1997 : ; | Form 2, Version 3.3, 29 May 2008 Plang and documents 27. . ‘An application should be accontpanied by delails to suppor the proposal & enable the Plan! Date assessmenl manager, referral agencies and 00256 L08 HB 23/4107 any parson viewing lhé application during public Scrutiny or public notificalion to . understand tha scope O/ the proposal and any polandallmpact _ OFFICE USE ONLY feppicabie to assessment manager) [ DATERECENED | [REFERENCE NUMBERS |
Page 6
23" April 2007 Noosa
SHIRE CouNCy,
Chief Executive Officer Yee
Noosa Shire Council
P.O. Box 141
TEWANTIN Q 4565
~ Attention: Land Use Section
Dear Sir/Madam
RE: Application for Request to Change an Existing Approval (extend currency period)
situated at 39 Duke Street, Sunshine Beach described as Lot 387 on RP 48112, Parish of
Weyba: George Simari
Martoo Consulting Pty Ltd has been engaged by George Simari, as applicant for the above proposal to
submit a development application to Noosa Shire Council under the Integrated Planning Act 1997. This
application seeks approval to extend the currency period for an approved 3 storey duplex dwelling ~
situated at 39 Duke Street, Sunshine Beach. :
This letter provides a comparison of the proposal against the relevant provisions of The Noosa Plan.
1. THE SUBJECT SITE
The subject site is a rectangular parcel of land located on the western side of Duke Street, Sunshine Beach. It
is currently occupied by a single storey brick and tile dwelling with significant vegetation located across the
site. A locality plan is included as Attachment 1. .
The subject site is included in the Attached Housing Zone under The Noosa Plan, and no overlays are
applicable to the site.
2. SURROUNDING PREMISES
The site is located in an area characterised by three storey unit developments. Land on the northern
boundary of the site contains a two storey duplex, whilst land to the south contains a four storey holiday
complex. Opposite the-site are a number of two storey commercial premises.
SUNSHINE COAST OFFICE GYMPIE OFFICE
1/199 GYMPIE TERRACE, NOOSAVILLE | PO BOX 1684 NOOSA HEADS Q 4567 1/28 REEF STREET GYMPIE | PO BOX 391 GYMPIE Q 4570
TELEPHONE | 0754555425 FACSIMILE 1 0754555725 TELEPHONE | 0754827440 FACSIMILE | 07 5482 4952
[email protected]
[email protected]
s
Our Reference: 00256 LO6 HB | Y la rtoo
consulting m
pty Itd
town planners +
urban designers
abn | 86 120 928 707
*
ous fae, 4
Page 7
@ Page 2 3. THE DEVELOPMENT APPLICATION This application seeks a Development Permit for a Request to Change an Existing Approval for an Extension to the Currency Period. The following details are considered retevant to the application: + An application for a 3 storey Duplex Dwelling (Council reference 23247 DA) was approved by Council on 14 August 2003; + On 29 June 2004 Council approved a ‘changes application’ and issued a Complied Decision Notice (refer Attachment 2). This application allowed for the construction of a toof top swimming pool; + Unfortunately due to unforeseen financial constraints the applicant has not been able to proceed with the construction of the duplex; + Accordingly, the applicant has been required to list the property on the real estate market; : + The applicant has advised that he is currently negotiating with a potential purchaser for the entire ‘site, however these negotiations and associated due diligence periods will not be completed until after the expiration of the currency period. 4. ASSESSMENT The Noosa Plan includes the site in the Eastern Beaches locality and provides the site with an Attached Housing zone. Under the superseded Planning Scheme the site was provided with a Residential Medium Density zoning. An assessment of the approved development against alll critical Noosa Plan requirements is provided below. Eastern Beaches Locality Code . Requirement EEE The Noosa Pian Zine Approved Development i Complies i 3 Density 160 persons/ha = 11.312 persons 2.x 3 bedroom units = 6.6 persons y 04 Building Height 3 storeys 3 storeys v 12 metres 12 metres v OS Setbacks Frontage - 6 metres 7.5 metres v - 10 metres 10.5 metres v Side — 1.5 metres 1.5 metres y —2 metes 2.5 metres v —2.5 metres 3.4 metres Rear —6 metres 11.5 metres Y 06 Site Cover, GFA Site Cover ~ 35% 39% «x & Plot Ratio Piot Ratio - 0.6:1 0.5:1 v 013 Roof Form 5 degrees pitch & 600mm overhangs Combination of skillion roof & flat roof x No roof terrace Roof terrace proposed x 043 Streetscape Wall length — max 15 metres 15 metres v Character
Page 8
@ Page 3 O46 Garages & Roof form similar to building Basement car parking provided v Carports Minimum width to streetscape —6m § metre opening to basement v Residential Uses Code wuunmees Approved Developmont =! Complies mg 04 Hot Water Solar, electric heat pump and/or natural gas The applicant submits an additional condition v . Systems may be recommended. ” O5 Water Supply & 3000L water tank per dwelling unit The applicant submits an add tional condition y Conservation - may be recommended. * 08 Garages & Stepped 600mm from each other Basement car parking provided v Carports Landscaping Code § Requirement Syma The Noosa Pan a -_—___ Approved Development Complies mj 01 Streetscape & Proposed population multiplied by 30m? 390m? landscaped area x Amenity = 198m* 02 Building Design & Below ground components do not extend Below ground components in line with above ¥ Landscape beyond above ground components~ ~ ~ ground components ~~ _— - - Design 010 Private Open Each unit 25m? / 12m? Large open space component for each unit, v Space including roof top terrace & pool, landscaped Minimum dimension 4m / 2.5m areas and balconies overlooking Duke Street 5. AREAS OF NON-COMPLIANCE Site Cover The approved development has a site cover of 39%. It is considered that this non-compliance is acceptable as the following is noted: + The superseded planning scheme allowed a site coverage of 40%; +. The approved development provides almost twice the amount of landscaped area than that required by The Noosa Plan; ¢ The approved development provides setbacks in excess of that required by The Noosa Plan; + The approved development provides a gross floor area 20m’ less than that required by The Noosa Plan. In this regard it is noted that the decks have been designed in accordance with the previous 2.5 metre distance requirements; and + All surrounding multi-residential and duplex construction have a site cover of 40%, and accordingly the approved duplex is consistent with the scale and bulk of this development.
Page 9
@ Page4 Roof Form The superseded Planning Scheme allowed for the establishment of roof terraces and developments with roof pitching less than 5 degrees and overhangs less than 600mm. Accordingly, the approved development complied with the planning scheme requirements current at the time the Decision Notice and Complied Decision Notice were issued. It is considered the approved development complies with the Specific Outcome O13 as follows:- a) Contribute positively to the local skyline The approved development relates well to the local skyline as it incorporates a mixture of traditional (skillion) and modern features. The roofline, although not providing a pitch of 5 degrees for its entirety, is compatible with the skyline of Sunshine Beach, particularly the Duke / Henderson / Elanda Street locality of this suburb. Photographs of recently constructed developments within the immediate locale are included below. As can be seen, the majority of modern multiple housing developments in Sunshine Beach incorporate flat roofs and roof terraces. The provision of a roof with pitching greater than 5 degrees would create a ‘Chinese hat’ effect on top of the building, and detract from the clean, perpendicular lines of the approved building. Furthermore, the dominant character of quality modern design in Queensland is low, to no roof pitching. In support of this, Attachment 3 contains a selection of images from the Royal Australian Institute of Architects showing award winning dwellings and multiple dwellings which feature similar design features as the approved development. It is noted that a number of these are located within the Noosa Shire.
Page 10
@ Page5 b) complement the beachside character of the locality As detailed above, the beachside character of Sunshine Beach has long departed from the ‘beach shack / pitched roof style of development. The current character of this beachside locality now i! comprises a mixture of modern 2 & 3 storey detached houses, duplexes and multi-residential premises with low to no pitching. Accordingly it is considered that the approved development compliments the beachside character of the locality. ¢) use soft and articulated pitched or curved roof forms The proposed main roof structure utilises a lightweight building material, and is of a soft pitched form. d) avoid low pitched (eg. less than 5 degrees) or box profiles/parapets; and The proposed main roof structure has a pitch of greater than 5 degrees. No box parapets are proposed. e) do not create opportunities for residents to overlook the private open space areas of neighbouring properties Due to the slope and orientation of the site, the approved development was designed with all view lines towards the north east. The Sunshine Beach commercial centre is located in this area, and accordingly the roof terrace does not create opportunities to overlook private open space areas. 6. CONCLUSION The approved development is considered to be consistent with the scale and design characteristics of the Sunshine Beach locality. Furthermore, the approved design is generally in accordance with the provisions of ‘The Noosa Plan. Accordingly, Council is requested to support the requested extension of time. Please contact our office if you require any further information and/or clarification with respect to the above application. Yours sincerely Hannah Blue Senior Planner Martoo Consulting Pty. Ltd.
Page 11
@ Pageé Attachments Attachment 1 — Location Map
Page 12
™@ TOWN PLANNERS martoo DEVELOPMENT CONSULTANTS Consultingm =m URBAN DESIGNERS Request to Extend the Currency Period for a Duplex Dwelling lo- cated at 38 Duke Street, Sunshine Beach LOCATION MAP PLANNING ASSESSMENT REPORT FILE NAME> LOCATION MAP DATE > April 2007 JOB NO> 00256 AMENDED> N/A SCALE > “see above” VERSION> 1.0 _SOURCE> —__NOOSA SHIRE COUNCIL FIGURE [J
Page 13
@ Page7 Attachments Attachment 2 —- Complied Decision Notice & Proposal! Plans Te
Page 14
MOXORES = Form 6 — Compiled Decision Notice
INTEGRATED PLANNING ACT 1997, S3.5.15, IDAS DEVELOPMENT APPLICATION
File No: 23247 DA Date of Decision: 21 June 2004
14. APPLICANT DETAILS ]
Name: GEORGE SIMARI
Postal address: UNIT 57, 89-97 "CLUBB COOLUM" DAVID LOW WAY COOLUM BEACH QLD 4573
Phone no: 0425 327782 Fax no: 5473.9349 Mobile:
{2. _ PROPERTY DESCRIPTION 1
Street address: 39 DUKE STREET
Suburb/locality © SUNSHINE BEACH
Real property LOT 387 RP 48112 PARISH WEYBA COUNTY MARCH
description:
j3.___ OWNER DETAILS |
Name: ROSS A KNIGHT
Postal address: UNIT 801 206 BEN BOYD ROAD NEUTRAL BAY NSW . Postcode: 2089
}4, REFERRAL AGENCIES |
Referral Agency Address Basis
Nil
[5 APPLICATION TYPE ]
Development . Development Details Preliminary Development
Approval Permit
Material Change of Use - Duplex Dwelling NO . YES
- [6. DECISION DETAILS ]
Council on 14 August 2003 decided to approve the application and grant a Development Permit, subject to
conditions.
In relation to a request to change the approved plans, Council on 21 June 2004 decided to: .
A. Approve the change with an amendment to Condition 1 and one additional condition;
B. Issue a Compiled Decision Notice.
{7 APPLICABLE CODES i
The developer must comply with the following codes for self-assessable development related to the development
approved under ‘this Development Permit:-
e Not applicable.
[8. SUBMISSIONS ; ]
Three properly made submissions were received.
Page 15
NOOSA COUNCIL IDAS Development Application Decision Notice 3 NTCKORS = Noosa Council Conditions INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION Land Use 1. 10. 11. 12. Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are numbered 10.0303.1A - 3A prepared by Andrew McKellar Design dated March 2003, and amended plans numbered 07.0404.1 and 07.0404.2 prepared by Andrew McKellar Designs dated March 2004, and as may be amended by these conditions. The development must be undertaken and operated in a manner that causes no detrimental effect upon the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other emissions. The open space and setback areas are to be landscaped in accordance with Council's Policy on Landscaping Guidelines and a properly prepared landscape plan. Such landscaping is to be completed prior to the premises being occupied and maintained at all times thereafter. Existing trees on the site and within road reserves are.to be retained, except where required to be removed due to building operations or the conduct of the approved use. The landscaping plans referred to above are to denote areas of existing vegetation or existing trees proposed to be retained and shall include the retention of the existing mature trees located between the building and the front boundary. Any fencing provided in conjunction with the development is to be setback an average of two (2) metres to any road frontage. The basement car park shall be located a minimum of 1.2 metres below the natural ground level and the finished ground level, apart from the driveway (basement opening). Balustrading to all decks is to be of an open transparent material. ° All decks shall not be enclosed with shutters, screens, glass panels or the like, thus remaining as open structures, The proposed development shall have all kitchen, laundry and bathroom fittings that comply with the AAA " Water Conservation Rating System as defined by the AS/NZS 6400 (Water Efficient Products - Rating ~ and Labelling 2003) and AS/NZS 3500 (National Plumbing and Drainage Standard Part 1.2). All tap ware . and shower roses shall not exceed a maximum floor of 9 Vmin. Dishwashers and washing machines are excluded from this requirement. Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if the cost of operational works exceeds $80,000, then a portable long service levy is required to be paid. In accordance with Section 77.(1) of the Act, Council is required to site the approved form issued by the Building and Construction Industry (Portable Long Service Leave) Authority that confirms that the requirements of the Act have been satisfied. A statutory declaration outlining the cost of the‘operational works must be submitted to Council with the lodgement of any application for operational works over the site. This Development Permit for a material change of use of premises lapses if:- 11.1. the use or erection of a building or other structure associated with the use, has not been commenced by 14 August 2007, unless application is made and approved by Council for an extension; or . 14.2. the use of any premises pursuant to the Development Permit ceases. The developer must obtain all of the other Development Permits referred to in the Decision Notice, prior to obtaining a Development Permit for building works. H o:\databaselonestop\decision.dac
Page 16
NOOSA COUNCIL IDAS Development Application Decision Notice 5 26. 27. 28. 29. 30. Each water connection to the water reticulation system shal! extend to the property boundary and be metered. Where multiple units are served by a single service, multiple water meters to each individual unit shall be installed. All fees for the supply of water meters shall be paid to the Council. Service Easements A registered easement shall be created over the existing Sewer main that crosses the northern portion of the site. The easements shall generally be parallel to and centred over the sewer main and be equivalent in width to twice the depth to invert level of the sewer at the deepest point within the allotment (measured _ from the finished surface) and be no less than 3.0 metres wide. In this regard, plans submitted for Operational Works approval shall accurately show the location of the easement. In addition to this the Applicant's Solicitor shall give Council’s Solicitor an appropriate undertaking in writing that the Title Deed and the easement documents will be lodged at the Land Titles Office and any additional Titles Office forms or requisitions requiring the consent of Council will be attended to promptly. A duly executed copy of the easement: shall be submitted to Council for perusal prior to the use commencing. ~ Any changes required by Council's Solicitor must be corrected immediately. No building or other structure shall be constructed or encroach over an easement. Any building, or Structure within proximity of an easement or any other public utility's underground must have its foundations designed so that no surcharge loads are imposed upon such underground infrastructure, - Foundations must be taken down a minimum of 1 metre below a line of influence measured 1 metre in the direction of the foundation from the centreline of the closest underground service and along the natural angle of repose of the foundation soil type(s). Plans, and’supportive documents, detailing these proposed foundations shall be designed by a registered practising Geotechnical Engineer and submitted with the application for a Development Permit’ for Operational. Works. Headworks Contributions shall be paid to Council in accordance with ‘Planning Scheme Policies PSP28 and PSP30 on Water Supply Headworks Contributions and Sewerage Headworks Contributions respectively and at the rates applicable at the time of payment. An estimate only of the contribution rates as of March 2003 under the current policies is as follows: ‘Water Supply . $3,635 Sewerage $2,745 TOTAL $6,380 | ‘All headworks contributions must be paid prior to the issue of a Development Permit for Operational Works. Alternatively a trading bank guarantee shall be submitted to Council Plus 20%. Should the headworks contributions not be paid at the due time, Council shall call upon the trading bank guarantee in full. In the event that the Development Permit for Material Change of Use of Premises lapses or is cancelled, the contribution or trading bank guarantee will be returned. . Erosion and Sediment Control Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site control measures such as silt fencing, controlled gravel access to the site and controlled disposal of waste, will be necessary. In this regard plans detailing the methods of controlling erosion and sediment are required to be submitted to the Council for approval prior to obtaining a Development Permit for Operational Works. Please note that prior to the commencement of any work on site all site control measures shall be installed and the approved plan adhered to. H o:\databaselonestop\decision, doc
Page 17
NOOSA COUNCIL IDAS Development Application Decision Notice 7 ' Local Laws, Policies & State Regulation Requirements INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION Advice 1. The Environmental Protection Regulation 1998 and Local Law No.12 prohibit a builder from making noise from:- 1.1. | Monday to Saturday, before 7:00am or after 6:30pm 1.2. Sunday or public holiday, at any time. 1.3. A maximum penalty of $1,500 applies to an offence under these provisions. 2. !n accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint, cement, concrete, builders waste or rubbish shall not be permitted to enter or be placed where it could reasonably be expected to move into a roadside gutter, stormwater drain or a water course. On the spot fines apply for such offences. H o:\databaselonestopidecision.doc
Page 18
beg t . crore: ‘ov Bulmen xanana 9906 6rrs (20) «= S9Sb NILNVM2L
zdoL sBeg | vouneW 120 Frovo 20 MEG HOW39 3NIHSNNS assodod ala xe yauegd Zz X0G Od
LaaoLS ayNG 6e oe ubl sep
ool: = o1eag wy usee a0VUHAL 400 Bupeesg UONEIOT TVS 'S A wed SELEY SU MEd Bue
= i =
ao :
y—— :
O87 { WEA {foe 3s Se
50 =
= ue|d soedts} 46 > 32 =
1 Oe at
20, Se
- - -—— - 3 - x= at 2
posdieem xaysdns, | [ . t ain topper ec paUNds MOWIOND | 2 z & :
gers 0s e1a19UD + optwot 404 seauC0 . myn sumpdoows coreng ayn peauges puoasna;oo a B :
Q s “tt wo
g | sree | 2m. & me
3 a _ “ vane dry ped peyoud punos i 2 Aa
owy_|| 905 ty foreer iots
= e al q zg sore oN
tg - Ziyo_. _. ” yous 01 I 1
| “Ey: elm fy varn
ke wit B | r zw oe '
io = Al : t
8 AR enero sth
Ey ST S76 Gr 14 Ss
Ss 8 : sue gf - _ | ttboo
is |e & nos i sn wack
iS |e 5 w\, : joyeAugsqo sanre bn
is . A . sr seg ween : ees
— ~ a - a
aE 3 |: {yond
eee Ley he _—_—
Lo i -woses sho
: \
a
° ! } \
‘uy oom 009 POby mopuem jaqaH 10 A pas ardsatmemieevoss —! | + = wre aun Jo |
Supentiyeg ster esapeurey,
os
hee ae ~ 1p
Sher
cme, bis awe awn 2A,
SES
ee
|
OE
Page 19
colourtond custom blue ovb murvad roofing
RL 53.116 _.
100 three x 450w habet
——— suntood
render & pant feist
semitrametess gizas balustiading
16 10008
FL 51.20
ee
gi
FLs0.00 |
FL 47.00
glass Blacks fo schedule ——— - ——--
FL 44.00
5 2B
a
nH Zz we
i” > ro
i a mo
i S$ =f
i & @&S
3 : = 3 .
=e east elevation
Zs
cca
: Lt =z
ech Ene ERT ey;
ant ray ii oR iar Client Mr. G. SIMARI Location 1 Drawing EAST ELEVATION Drawn AM | Scale 1:00
Hesigs [
design Soja PROPOSED 39 DUKE STREET | . 4
PO 222 PhonelF: rojec'
Box 1 fury 3ag9 9066 DUPLEX SUNSHINE BEACH ! Drawing no. 07.0404.2 Date March 04 Page 20F2
ai I
TEWANTIN 4565
Page 20
sae
a
witty,
we
JIBYS aynp
y
f
lee
3
. +
he 3
= a
S 3
B wn
: =~
rc
mM
NOOSA SHIRE COUNC {i
PLANS APPROVED
sIGNATITRE: AH
T SUNSHINE BEACH
2. .
ve ANOS EW Wie ELLAR Sit.
Page 21
— wee _— t.
‘ rumpus ere . :
font y RLAS. SG 44 i i
£ LL 4
i
i
wee . we ee cen ~— eens a “ a \-
SECOND FLOOR
third storey -
ef =} Say
ad
living i
FL &&.59 .
bale"
' 799
4 )
. ste wae BE
NOOSA SHIRE COUNCHL
PLANS APPROVED
PROPOSED DUPLEX ™=—24
FIRST FLOOR FOR G SIMARI
serand sere a LOT 387 DUKE ST. SUNSHINE BEACH
oo: . SCALE 1706 MARCH 2002 a
16 9303.24 ers 165) S449 FOES
te - : }
Page 22
“het > a UTH x ree / i 3 re | 43 eatin ches b ney cement nl « tbe, PLANS APPROVED SIGKATURRE fern DATE nnn AA) f Hor ys.
Page 23
NOOSA COUNCIL IDAS Development Application Decision Notice
Appeal Rights
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
The following is an extract from the integrated |
Planning Act (Chapter 4). i
Division 8 - Appeals .to court relating to
development applications
Appeals by applicants
4.1.27.(1) An applicant fora development application
may appeal to the court against any of the following-
{a) the refusal, or the refusal in part, of a
development application;
(b) a matter stated in a development approval,
including any condition applying to the
development, and the identification of a code
under section 3.1.6;°
(c) the decision to give a preliminary approval when a
development permit was applied for;
(d} the length of a currency period;
(e) a deemed refusal.
{2) An appeal under subsection (1)(a) to (d) must
be started within 20 business days (the “applicant’s
appeal period”) after the day the decision notice or /
negotiated decision notice is given to the applicant.
(3) An appeal under subsection (1)(e) may be
started at any time after the last day a decision on the
matter should have been made.
Appeals by submitters
4.1.28.(1) A submitter for a development application
may appeal to the court about-
{a) the giving of a development approval, including
any conditions (or lack of conditions) or other
provisions of the approval; or
(b) the length of a currency period for the approval.
{2) The appeal must be started within 20 business
days (the “submitters appeal period”) after the day
the decision notice or negotiated decision notice is
given to the submitter.
~ (3) If a person withdraws a submission before the
application is decided, the person may not appeal the
decision.
(4) If an application involves both impact
assessment and code assessment, appeal rights for
submitters are available only for the part of the
application involving impact assessment.
" Section 3.1.6 (Preliminary approval may override local planning
instrument)
H o:\databaselonestop\decision.doc
(5) If an application is processed under section
6.1.28(2), appeal rights for submitters for the
application are available only for the aspects of the
development that would have required public
Notification under the repealed Act. ‘
(6) If an application involves assessment against
a concurrence agency code, appeal rights for —
submitters for the application are not available
_ against the part of the approval that represents the
concurrence agency’s response for the code.
Appeals by advice agency submitters
4.1.29.(1) An advice agency may, within the limits of
its jurisdiction, appeal to the court about the giving of
a development approval for a development
application if-
(a) the development application involves impact
assessment; and
(b) the advice agency told the applicant and the
assessment manager to treat its response to the
application as a submission for an appeal.
(2) The appeal must be started within 20 business
days after the day the decision notice or negotiated
decision notice is given to the advice agency as a
submitter.
Appeals for matters arising after approval given
(co-respondents)
4.1.30.(1) For a development approval given for a
development application, a person to whom any of
the following notices have been given may appeal to
the court against the decision in the notice-
(a) a notice giving a decision on a request for
extension of the currency period for an approval;
(b) a notice giving a decision on a request to make a
minor change to an approval.
(2) The appeal must be started within 20 business
days after the day the notice of the decision is given
to the person. .
(3) Subsection (1)(a) does not apply if the
approval resulted from a development application
(superseded planning scheme) that was assessed as
if it were an application under a superseded planning
scheme.
(4) Also, a person who-has made: a request
mentioned in subsection (1) may appeal to the court
against a deemed refusal of the request.
{5) An appeal under subsection (4) may be
started at any time after the last day the decision on
the matter should have been-made.
17/04/07
Page 24
NOOSA COUNCIL IDAS Development Application Decision Notice . : 7 om NOOSA ’ Local Laws, Policies & State Regulation me Requirements INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION Advice 1. The Environmental Protection Regulation 1998 and Local Law No.12 prohibit a builder from making noise from:- 1.1. Monday to Saturday, before 7:00am or after 6:30pm 1.2. Sunday or public holiday, at any time. * 1.3. Amaximum penalty of $1,500 applies to an offence under these provisions. 4 2. In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint, cement, concrete, builders waste or rubbish shall not be permitted to enter or be placed where it could reasonably be expected to move into a roadside gutter, stormwater drain or a water course. On the spot fines apply ‘for such offences. H o:\database\onestop\Wacision.doc
Page 25
- NOOSA COUNCIL IDAS Development Application Decision Notice
Division 9 - Appeals to court about other matters
Appeals for matters arising after approval given
(no co-respondents)
4.1.31.(1} A person to whom any of the following
notices have been given may appeal to the court
against the decision in the notice-
(a) a notice giving a decision on a request to change
or cancel a condition of a development approval.
(b) a notice under section 6.1.44? giving a decision to
change or cancel a condition of a development
approval. .
(2) The appeal must be started within 20 business
days after the day the notice of the decision is given
to the person. :
(3) Aliso, a person who has made a request
mentioned in subsection (1)(a) may appeal to the
court against a deemed refusal of the request.
(4) An appeal under subsection (3) may be
started at any time after the last day the decision on
the matter should have been made.
Appeals against decisions to change approval
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
decision made on an application to change the
conditions attached to: an approval given under
section 2.19(3)or section 4.4 of the repealed Act may
appeal to the court against-
(a) the decision; or
(b) a deemed refusal of the application.
{2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of
the decision is to be given to the person.
(3) An appeal under subsection (1)(b}) may be
started at any time after the last day a decision on the
matter should have been made.
Appeals against local laws
4.1.33B.(1} An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises
or the erection of a building or other structure -
permitted by the planning scheme may appeal to the
court against the decision or the conditions applied.
i (2) The appeal must be started within 20 business
days after the day notice of the decision is given to
the applicant.
2 Section 6.1.44 (Conditions may be changed or cancelled by
assessment manager or concurrence agency in certain
circumstances)
Hozldatabaselonestop\decision.doc
17704707
Page 26
@ Page8 Attachments Attachment 3 — RAIA Award Winning Detached Dwelling & Multiple Dwellings
Page 27
Page 28
Page 29
Page 30
Page 31
aGu a . _ TAND USE SECTION FEES iw MNICleNtn | — RECEIPT TYPE SALE OF DOCUMENTS Superseded Planning Scheme Documentation . 520 Copy of Permit/Approval Letter 110 The Noosa Plan Documentation . 111 APPLICATION FEES: , Material Change of Use - Code/tmpact Consistent 521 inconsistent - §21 - Assessment under Superseded Planning Scheme . 521 Modification to a Development Permit . 521 Extension of a Currency Period vio 521 Operational Works - Landscaping §21 Bldg Work assessable against the Planning Scheme : $21 PRE LODGEMENT REVIEW Half Hour 522 . One Hour / . 522 ADVERTISING : / . Purchase Advertised Applications 523 JETTIES © . Jetty Application Fee 524 Jetty Bond , : 51 : (Category 4) BONDS . Performance Bond . . . 51 (Category 9) SIGNS : . . Registration Fee o . . 222 SEARCHFEE Search of Land Use Section file , 112 © Liquor Licensing Request 113 TOTAL. $ Ss NAME: CG. Suan _. ADDRESS: e- NMaste-= Cu Tr hAwr " v Po Bo (Gee Rion deoet, FILENO: . 2. 2RBezu > LSA DATE: 21s ]o5 RECEIPTNO: 2eFi235% - - Signature of TP Officer: 7] 7» S~. AUTHORITY NO: /2 2or3(2a2 74/3
Page 32
CALCULATION OF FEES APPLICATION FEE TOTAL FEES MCU - CODE ASSESSMENT Details of Development Consistent 1.0 Inconsistent 3.0 FEE CALCULATION — MCU - IMPACT ASSESSMENT Details of Development Consistent 1.0 Inconsistent 3.0 FEE CALCULATION OPERATIONAL WORKS Details of Development FEE CALCULATION TOTAL FEES
Used in these records
23247 DA - Request to change a development approval -(Extend Curency Period) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.