Council archive · source document
23247 DA - Request to change a development approval -(Extend Curency Period) [As Published] · 132003.220721.3
NOOSA COUNCIL IDAS Development Application Decision Notice 5 26. 27. 28. 29. 30. Each water connection to the water reticulation system shal! extend to the property boundary and be metered. Where multiple units are served by a single service, multiple water meters to each individual unit shall be installed. All fees for the supply of water meters shall be paid to the Council. Service Easements A registered easement shall be created over the existing Sewer main that crosses the northern portion of the site. The easements shall generally be parallel to and centred over the sewer main and be equivalent in width to twice the depth to invert level of the sewer at the deepest point within the allotment (measured _ from the finished surface) and be no less than 3.0 metres wide. In this regard, plans submitted for Operational Works approval shall accurately show the location of the easement. In addition to this the Applicant's Solicitor shall give Council’s Solicitor an appropriate undertaking in writing that the Title Deed and the easement documents will be lodged at the Land Titles Office and any additional Titles Office forms or requisitions requiring the consent of Council will be attended to promptly. A duly executed copy of the easement: shall be submitted to Council for perusal prior to the use commencing. ~ Any changes required by Council's Solicitor must be corrected immediately. No building or other structure shall be constructed or encroach over an easement. Any building, or Structure within proximity of an easement or any other public utility's underground must have its foundations designed so that no surcharge loads are imposed upon such underground infrastructure, - Foundations must be taken down a minimum of 1 metre below a line of influence measured 1 metre in the direction of the foundation from the centreline of the closest underground service and along the natural angle of repose of the foundation soil type(s). Plans, and’supportive documents, detailing these proposed foundations shall be designed by a registered practising Geotechnical Engineer and submitted with the application for a Development Permit’ for Operational. Works. Headworks Contributions shall be paid to Council in accordance with ‘Planning Scheme Policies PSP28 and PSP30 on Water Supply Headworks Contributions and Sewerage Headworks Contributions respectively and at the rates applicable at the time of payment. An estimate only of the contribution rates as of March 2003 under the current policies is as follows: ‘Water Supply . $3,635 Sewerage $2,745 TOTAL $6,380 | ‘All headworks contributions must be paid prior to the issue of a Development Permit for Operational Works. Alternatively a trading bank guarantee shall be submitted to Council Plus 20%. Should the headworks contributions not be paid at the due time, Council shall call upon the trading bank guarantee in full. In the event that the Development Permit for Material Change of Use of Premises lapses or is cancelled, the contribution or trading bank guarantee will be returned. . Erosion and Sediment Control Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site control measures such as silt fencing, controlled gravel access to the site and controlled disposal of waste, will be necessary. In this regard plans detailing the methods of controlling erosion and sediment are required to be submitted to the Council for approval prior to obtaining a Development Permit for Operational Works. Please note that prior to the commencement of any work on site all site control measures shall be installed and the approved plan adhered to. H o:\databaselonestop\decision, doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
23247 DA - Request to change a development approval -(Extend Curency Period) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.