RFI (rec. 5.06.26) 2567 - Appendix B - Site-Based Stormwater Management Plan (SBSMP) (Ver. 2)
Original PDF page 16, section 1. The text section number identifies this passage in the reader.
3.3.6 MUSIC Model Results
The model schematic is shown in Figure 3-3. The MUSIC contaminant sources, residual
loading at the discharges from site, and pollutant load reductions are shown in Figure 3-4
below. These results were generated stochastically as per the MUSIC Modelling Guidelines.
Figure 3-3 Pollutant export model schematic for post-development scenario
Figure 3-4 Post-development MUSIC result summary from the site
Discharge targets for the overall site were compliant with the requirements specified in QLD
SPP (2017), Table B in Appendix 2: Stormwater Management Design Objectives, Part G.
2576-SBSMP-01_Version 2.0 (April 2026) Page 11 of 23
SX/TB