RFI (rec. 5.06.26) 2567 - Appendix B - Site-Based Stormwater Management Plan (SBSMP) (Ver. 2)
Original PDF page 28, section 1. The text section number identifies this passage in the reader.
7.0 LIMITATIONS AND CLOSURE This report has been commissioned by RMD Capital Pty Ltd and specifically investigates the subject site as described in this report. We consider that the study addresses the requirements for development of the subject site at the time the study was undertaken. If these conditions are known to change, the results of this study should be reviewed. This report is only to be used in full and may not be used to support objectives other than those set out herein, except where written approval is provided by Barlow Shelley Pty Ltd. Barlow Shelley Pty Ltd accept no responsibility for the accuracy of information supplied to them by second and third parties. Should further information be required please contact the undersigned. AUTHORED BY SHENG XIE – Senior Civil Engineer BEng (Civil) APPROVED BY TIM BURKE – Director BEng (Civil), CPEng, MIEAust, RPEQ (25245), NER For and on behalf of: BARLOW SHELLEY PTY LTD 2576-SBSMP-01_Version 2.0 (April 2026) Page 23 of 23 SX/TB
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.