Original source · versioned page text
RFI (rec. 5.06.26) 2567 - Appendix B - Site-Based Stormwater Management Plan (SBSMP) (Ver. 2)
Original PDF page 31, section 2. The text section number identifies this passage in the reader.
>
4.8
/
125
12
B2 KERB IN ACCORDANCE
/
/
STAGE 4 BOUNDARY
/
EMT
30 29 28 26 25
OOHH
27 24
124
36 35 34 33 32 31
/
.70
WITH IPWEA STD RS-080
>
/
/
/
124.5 STAGE 5 BOUNDARY
OOHH
/
SW
0.7
/
/
/
124
G SP
>
/
STAGE 4
OOHH
STAGE 2 2
/
SW
5.10
/
/
0
4.6
5.00
12
/
1212
.90
>
/
OOHH
124
.80
/
SP197517
/
SW
0
1975
4.5
124
.70
124.0
/
12 12
124
4.
/
60
OOHH
/
/
LEGEND
>
12 13 14 15 16 17 18 19 20 21 22 23
/
SW
/
0
4.4
SHARED SPACE & BOLLARD IN
/
12
/
OOHH
17
/
>
/
ACCORDANCE WITH AS2890. 2.5%
SW
12
4.
BIN ENCLOSURE
/
50 0
EXISTING LOT BOUNDARIES
/
4.3
OOHH
12
6.1m
/
MAX
/
(3.6m X 2.5m) 122
>
SW
/
/
3.6m .80
/
PROPOSED CONTOURS
20
OOHH
/
12
4.
4.
12
2.5m
40
3.5
/
/
125
/
>
12
1
/
0
OOHH
124.50
12
4.1
.50 EXISTING CONTOURS (INTERVAL 0.20m)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.