Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

RFI (rec. 5.06.26) 2567 - Appendix B - Site-Based Stormwater Management Plan (SBSMP) (Ver. 2)

of 90

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 4, section 1. The text section number identifies this passage in the reader.

CONTENTS


1.0    INTRODUCTION..................................................................................................... 1

2.0    SITE DESCRIPTION ............................................................................................... 2
 2.1      Reference Standards and Guidelines .............................................................. 3
 2.2      Catchment Hydrology ....................................................................................... 3

3.0    STORMWATER QUALITY MANAGEMENT ........................................................... 5
 3.1      Construction Phase .......................................................................................... 5
 3.2      Post-Construction Phase ................................................................................. 6
 3.3      MUSIC Modelling ............................................................................................... 8
 3.4      Stormwater Assets – Maintenance ................................................................ 12

4.0    STORMWATER QUANTITY MANAGEMENT ...................................................... 14
 4.1      Summary.......................................................................................................... 14
 4.2      Design Storm Events ...................................................................................... 15
 4.3      WBNM Hydrologic Model ................................................................................ 16
 4.4      WBNM Analysis Pre-Development Scenario ................................................. 17
 4.5      WBNM Analysis Post-Development, Unmitigated Scenario......................... 18
 4.6      WBNM Analysis Post-Development, Mitigated Scenario.............................. 19

5.0    FLOODING ........................................................................................................... 21

6.0    CONCLUSION ...................................................................................................... 22

7.0    LIMITATIONS AND CLOSURE ............................................................................ 23

Log in to download the original (RFI (rec. 5.06.26) 2567 - Appendix B - Site-Based Stormwater Management Plan (SBSMP) (Ver. 2).pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.