Skip to the record
The only place to find full transcripts.

Original source · versioned page text

RFI (rec. 5.06.26) 2567 - Appendix B - Site-Based Stormwater Management Plan (SBSMP) (Ver. 2)

of 90

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 43, section 1. The text section number identifies this passage in the reader.

 

 

Cod Flo: G:\41\.17021\ Document _Tronsfer\ Incoming 45~113\ CHAK ACAD 45113-COA_CO4A COSA Earthwosks.¢wo{C03)

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 
 

 

 

 

 

 

 

 

 

NO’

 

TE;

 

 

 

 

 

 

  
   
  

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Plot Oale: 27/07/07 - 14:34

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BOULDER RETAINING WALL SCHEDULE Surface water is not |/~ 120m Choinire Secu
H 15m to flow over wall. Fence, refer IPWEA Drg Uy N S:
A 0.5m G-0041 for details 1, ALL FOUNDATIONS ARE TO BE CONSTRUCTED OF 100mm CBR1S MATERIAL
8 1.2m y FULLY COMPACTED
c 0.3m Sh. 2. THE FOLLOWING GEOTECHNICAL PARAMETERS AND MATERIAL PROPERTIES
@PSM 101689 9
RL 119.899 A.H.D o 2.0m gla SHALL BE CONFIRMED ON SITE GY A GEOTECHNICAL ENGINEER PRIOR TO
(TOP OF BRIDGE) £ 0.25m ES CONSTRUCTION:
F 0.6m VARIES , 8a ‘SGIL UNIT WEIGHT = 18 kN/mS
¢ 1.0m i | SOIL FRICTION ANGLE = 25 DEGREES
J 1.0m ALLOWABLE BEARING CAPACITY = 100 kPa
MaDuMuy, BoUtDER BOULDER UNIT WEIGHT = 25. kN/m3
3, BOULDERS MUST COMPRISE SOUND, CONPETENT, DENSE, HARD ROCK. ANY
a —o BOULDERS THAT ARE WEAK, PRONE TO WEATHERING OR CONTAIN FRACTURES
x = WOULD NOT BE ACCEPTABLE,
CH WO off. 0.30 iz aoe R ba | 1 4, BOULDERS MUST BE PLACED SO THAT THEY HAVE CONSIDERABLE PHYSICAL
1 1816.556 LINE OF SETOUT SLOPE (MIN. 4 INTERLOCK, ANO PROVIDE A FACE WITH MINIMUM VOID SPACES. BOULDERS
N'5402.820 COORDINATES SHOWN = SHOULD BE PLACED SO THAT THE LARGEST SURFACE IS SLOPED INTO THE
| provIDE Nia *e* pars at GEOFABRIC LAID WALL AT A MINIMUM SLOPE OF 1(V):5(H). THE FRONT FACE OF THE WALL
&® Yay BOO CENTRAL WIT AGAINST RETAINED SHALL BE BUILT TO SLOPE BACK FROM THE VERTICAL A MINIMUM OF 4(V):
3N12 HORIZONTAL BARS SOIL AND AROUND — 1H)
AS SHOWN 5. THE MINIMUM SIZE OF BOULDERS SHOULD BE 0.5m. LARGER BOULOERS
PSM47250 IL 122.284! hg,
End of Ferrels Rd Of - SHALL BE USED AT THE MID AND LOWER LEVELS TO BE APPROXIMATELY
jo ——~Y THE WIDTH OF THE WALL AT EACH LOCATION.
4g, MIN 100mm SLOTTED 8. THE CONCRETE FOOTING SHALL BE CONSTRUCTED FROM 25 NPo CONCRETE
0 BEM s3 $18 AH.D DETAIL PIE ROMIDE AND THE BASE SHALL BE INCLINED A MINIMUM OF 1(L):5(H).
by . NTS MAX. INTERVALS co oF 7. THE LOWER COURSES OF BOULDERS SHALL BE SET INTO THE CONCRETE
© j Le FOOTING AND ALL VOID SHALL BE REMOVED BELOW THE FINISHED LEVEL
CH W680 off. 0.30 t 25MPa CONCRETE A 8. AN AGGREGATE DRAINAGE LAYER SHALL BE PLACED BEHIND THE WALL,
E 1774.568 f \ 7 WRAPPED IN GEOFABRIC OVER THE ENTIRE HEIGHT OF THE WALL A 100mm
N §034.725 SN Le SLOTTED AGRICULTURAL PIPE SHALL BE PLACED AT THE GASE OF THE
Lot 1 DRAINAGE {AYER AND DRAINED TOWARDS THE END OF THE WALL
‘3 Y Lot 3 TYPICAL BOULDER RETAINING WALL
{ we \ Y > nies COUNCIL we
CH UTI 727 gL O50} roe ee
0. \ weep ADIT O,
~s\, e ieekea0 vy l/\ ei ::F PERMIT GPERATIONAL WORKS Woz Fe o7
> \ \ iN 437.508
S\~s | [Nag5taea % GH 44.841 off. 0.30 St .. DATE.
= Ly CHL 0,30 E 1943.028
Pess\_> 1 7825.348 0 OR See DATE
% N 4921.445 Se8.026
AMEN DATE
U/ Pep NECOMMESSYED FOR APPROVAL .
S ~ CHES. 010K O30 sessasssnesee
“ E 4037.571 ) eS A cert RR .
J Nv 3S oa N.4927: HO ce STANCES MAY THE PLAN & RETAINING WALL LEVEL SETOUT
ey, zt CATIONS | 8B SEPARTED FROM WITHOUT E | fhainage Surface Top RL | Height Chainage Surface Top RL | Height
gts DEV 1
ERS P PRG ff. AGER LAND DEV * [South side - S East Side -
— ay 6.425 60 123.106 | 123.332 | 0.226 Q woot | 16371 | 1440
Y 3.603 10 124.829 122.615 1,086 0 115,327 116,768 Wb
. 80 120.164 | ra27a— | at09 20 15.619 | 11068 | 1.449
5 ot\ 6 90 119.295 120,578 | 1.303 30 115,831 197.316 1483
° 100 esta | 9840 | 4327 40 6.123 | 112.447] 4324
ot 2 Ww 117.773 199.120 1.347 so 116.906 117,513 0.607
7] Lot 5 20 17.226 {118435 | 1.209 60 17405 | 117555 | 0.150
Ot 130 116.659 11756, 1.095,
‘ 140 116.093 17.230 4437 Around Lot -L
200. 8 <_ 180 115.688 17.015 4327 30 123.242 123.468 0,206
oT wo 115.464 16,913 Wao ao 122.761 123.118 0.357
J aa eA no 115.327 16.824, 1497 st 122.286 122.780 0,469
<— 160 115.258, 116,736 481 60 12710 122.507 0.197
x pe Wy 190 115.156 116.656 1500 w 121.078 122.616 1.338
az 7 \ \ 4 ‘a 200 115.157 116.637 1480 80 120,830 122.320 1.490
> 2? A &> oO 210 115.065 16.587 Wah? 0 121.090 122.426 1.336
| cis? wr a4 oO CH $311.104 off. 0.30 220 115.019 =f 116.519 1500 100 yauase | 122577 | 1.219
_—- ~ o E 2063.710 230 1) 114920 | 16.420 | 1500 v0 121556 | 122.712 | 1.456
uw —_ o 240 114.855, 116.345, 1.490 420 121,182 122.789 0.977
| ae C—O NASB 747 250 gr | 16.220 | 1308 3 ra19e7 | 122818
- 5 2 mo oO 116.91. e Ws 130 ! 81 0.831
. eG me aeons 260 meno | 6197 | 1487 mr) w2.22%6 | 122.829 | 0.605
A — oa 3 ° cHsso0 210 1903 | 116.309 | 1.401 450 wenee | 122.930 | 0.482
v nt (72) S Oo Drainage Swale refer E 2052.884 280 116,992 16.616 12h West side - W
BS Q detail, (451 13-C07) N 4836.276 290 118.092, 116.549 1.457 o 124.655, 123.165, 1490
Earthworks YD S . 300 915,187 116.649 11462 w wrzeo =| 123een | 1180
Grid Setout | . 0 14.931] 116.374 1.440 20 y2245B | 123.700 | 1.242
CH SO 30 122533 | 123.690 | 1.157
E 1761,066 CH 63.005 offset 0.30 . 40 122.653 | 923.686 | 1.033
N 4766.594 E 1621.83! 50 122490 123.679, 0.969
N 4783537 60 nesses | a6 | 0.07
| ew 123,303 123.655, 0.382
SexES oRMAN | Ba leddy sergiacomi & cueT LOCATION ORAEING WO,
. on oaoes | oF associates pty. itd. | DEPT. OF INFRASTRUCTURE HOLTS ROAD, NANDROYA 45113-C03
40 ENGINEERING & ENVIRONMENTAL CONSULTANTS SHEET
[ISSUE FOR TENOR | 07707 pesiceo | ew) PRORECT ime ~
— 1:2000 © PROJECT MANAGERS!'& PLANNERS @
aN. SESERUPTION oY | owe , mom | a sensi toity Fee > cennarBctrcrved > PROPOSED INDUSTRIAL EARTHWORKS LAYOUT PLAN 3
pe, zr oT, STIRS Em EES WoL CTE 7.0. cox 1256 CALOURD A, GUD. 4551 SHEET 1 of 3 oF A
Piemonte mse | esa | 2040005 Gar) I OE ay ESTATE 36

 

 

 

 

 

 

 

 

 

 

 

 

Log in to download the original (RFI (rec. 5.06.26) 2567 - Appendix B - Site-Based Stormwater Management Plan (SBSMP) (Ver. 2).pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.