OPW16/0050 - Approved Plans

of 6

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
          -

   NOOSA COUNCIL
   APPROVED PLAN
OPW16/0050 23 MAY 2016


[OCR of page images]
 

 

 

 

Dive &

 

 

| NOOSA COUNCIL

 

APPROVED PLAN

 

NOTE:

 

DEPENDING ON GROUND CONDITIONS AND _ IF
REACTIVE SOIL IS FOUND ALL PENETRATIONS,
VERTICAL AND HORIZONTAL SHALL BE

DRAWING SCHEDULE

 

PROVIDED WITH SWIVEL JOINTS AND
EXPANSION JOINTS. ALL SUBSURFACE DRAINS

OPERATIONAL

WORKS

 

 

REQUIRE EXPANSION JOINTS AT 10m SPACING.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

OPW16/0050 23 MAY 2016 3105-1_| COVER SHEET
STREET ADDRESS:
3105-2 STORMWATER DRAINAGE AND MANAGEMENT PLAN
5 1 CORSAIR CRESCENT 3105-3 EROSION AND SEDIMENT CONTROL PLAN (ESC)
D 3105-4 ESC NOTES
SUNRISE BEACH
REAL PROPERTY DESCRIPTION:
CLIENT NAME: Obs 4
55 a!
CONNECTIVITY P/L ee UE 3S
S age *
o
ie
@)
i i — = 4>
| | | | | Cc
= ° ; O
a | | | | | | | | \ LJ
a a o | | | | | | | | | WY
a < | | | | | | | | | Q
ro < !
m lo =: . | Po
Q ye =o & C
oO < a x “ | | | | | | | |
a o poe ° j j CO
oO por :
z 5 a | | | | |
a To Bor 2 , C
OQ a g j —
PROPOSED DUPLEX Qe Soe 8 | OC
a > Joos Ss | |
x paar 2 | VW)
Zz pH He 3 | | | | ¢
A |g poss Po | | i C
= pros é ! | )
+ mM po e | I | O
g Zz Sees @ J Cy
4 a 2 | { | L
a BEES : em a eh
a 3 ©
x 2 po=zat 5 g & g S 8 N N
a < Poros. — ——__
5 EEEE: = 7]
a 9
PORES soe
a £25
SoS Site 698 m?
SITE PLAN & EXISITNG SERVICES Roof 256. me
Driveway 95 m?
LOCALITY MAP Landscape 257 m?
SCALE NTIS. New impervious 351 m?
CATCHMENT AREAS
DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED
FOR ASSESSMENT, TENDERING AND CONSTRUCTION.
LEGEND GENERAL NOTES WATER SUPPLY Amd Description Date
aw Ron Water 3 Diameter 1. DO NOT SCALE FROM THESE DRAWINGS. 1, PIPEWORK SHALL BE IN ACCORDANCE WITH AS4020, FOR EXAMPLE: ABS (ACRYLONITRITE STYTRENE), PP (POLY PROPYLENE), PE
Existing Water tos.  Cleanoat to surface 2. DONOT RELY ON THESE DRAWINGS FOR ALIGNMENT AND LEVELS OF EXISTING INFRASTRUCTURE. (POLYETHYLENE) OR COPPER U.N.O.
s Existing Sewer CJ Capped junction 3. ITIS THE OBLIGATION OF THE CONTRACTOR AND/OR PLUMBING CONTRACTOR TO SURVEY ALL EXISTING SERVICES PRIOR TO 2. WATER SUPPLY PIPEWORK SHALL BE @20 U.N.O. EXCEPTION: ONE FITTING ONLY MAY BE @15. MAX. LENGTH 3000 MM. HOT WATER PIPEWORK
Existing Storm water cv Conrol valve CONSTRUCTION. SHALL BE LAGGED. HOT WATER RECIRCULATING LINES TO BE INSULATED WITH 20MM "ARMAFLEX" OR SIMILAR.
HD Existing House drain cs Cleaners. sink 4. THE PLUMBING CONTRACTOR IS OBLIGED TO OBTAIN REAL SIZE PRINT OUTS (A1 U.N.O.) FOR THE PREPERATION OF TENDER. ANY 3. PROVIDE TEMPERING VALVES ON HOT WATER TO PERSONAL HYGIENE FIXTURES.
Sanitary Drainage Se Gold Woter  anel CLAIMS REFERED TO AS "DRAWING COPIES" NOT READABLE SHALL BE REFUSED. 4. UNDERGROUND COPPER PIPEWORK SHALL BE "KEMLAGGED" OR OTHERWISE PROTECTED. UNDERGROUND PIPEWORK NOT UNDER
Grey Water Bev Double check walve 5. ALL KITCHEN, LAUNDRY & BATHROOM FITTINGS AND TOILETS SHALL COMPLY WITH THE MINIMUM WELS WATER RATING LEVEL 4 CONCRETE SLAB MAY BE POLYPIPE CLASS PN20, ONE SIZE LARGER THAN SHOWN.
fant oe Een Eccentric Enlarger STAR (FORMER AAAA WATER CONSERVATION RATING AS PER AS/NZ6400). 5. EXPOSED PIPEWORK IN AMENITIES AREAS, SHALL BE CHROME PLATED.
aT GO yuater Elev Dge Evevated Drainage 6. PROVIDE FLOW RESTRICTOR VALVES TO TAPS AND SHOWER ROSES WHERE REQUIRED. 6. SUBMETERS SHALL COMPLY WITH APPROVED DEVICES. REFER LOCAL AUTHORITY REGULATIONS. SUBMETERS SHALL BE LOCATED IN
————— Storm Water Drainage Fe False. ceiling 7. THE FLOW SHALL NOT EXCEED A MAXIMUM OF 9L/MIN. COMMON AREAS ONLY.
lll Fire FH Fire Hydrant 8. WATER SUPPLY AND SANITARY DRAINAGE HAS BEEN DESIGNED AND SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE Q'LD
cot Agi Drain FHR Fire hose reel STANDARD SEWERAGE LAW, Q'LD STANDARD WATER SUPPLY LAW, THE NATIONAL PLUMBING, DRAINAGE CODE AS 3500, THE meus Noles Dale
FFL Finished floor level Q'LAND DEVELOPMENT CODE QDC, THE FIRE HYDRANT CODE AS2419, ALL RELEVANT AUSTRALIAN STANDARDS, AND THE BACKFLOW PREVENTION
; ; FU Fixture units REQUIREMENTS OF THE LOCAL AUTHORITY. 1. PROVIDE HOSE CONNECTION VACUUM BREAKERS TO ALL HOSE COCKS PROVIDE RPZD TO ANY IRRIGATION CONNECTIONS, For Development Approval
(*" © Rain Water Riser GIT Grease Interceptor trap ildi x 01-03-16
' ep Gully pit 9. THESE DRAWINGS ARE DIAGRAMMATIC ONLY AND SHALL BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECTURAL AND/OR HAZARD ZONES. For Building Approval
Cold Water Riser GMH Gully Man Hole DRAWINGS, OTHER CONSULTANTS DRAWINGS, SPECIFICATIONS AND OTHER WRITTEN INSTRUCTIONS THAT MAY BE ISSUED 2. PROVIDE APPROVED BACK FLOW PREVENTION TO FIRE SERVICES, HYDRANT SUPPLY (TESTABLE SINGLE CHECK VALVE U.N.O.), For Tender
Down Pipe gv Gate valve DURING THE COURSE OF THE CONTRACT. ANY DISCREPANCIES SHALL BE REFERRED TO THE SUPERVISING OFFICER FOR ALL FIRE HOSE REELS WHICH MAY BE USED FOR OTHER THAN FIRE FIGHTING SHALL BE EQUIPPED WITH DOUBLE CHECK VALVES For Construction
Stack HW Hot water tion branch DECISION BEFORE PROCEEDING WITH THE WORK. CONTRACTOR'S SHALL VERIFY ALL FIXTURE LOCATIONS, INVERT LEVELS, (DCV) U.N.O. hs Constructed
Vent Pipe HD House drain SURFACE LEVELS, AND COVER TO PIPES ARE CORRECT AND OBTAINABLE PRIOR TO COMMENCEMENT OF THE WORK. THE EXACT
@) 3 HL High level LOCATION OF EXISTING, AND PROPOSED SERVICES, SHALL BE VERIFIED WITH THE RELEVANT AUTHORITY, OR OTHER TRADES AS
@) S) ° Group Vent IC Inspection Chamber APPLICABLE. FIRE STOP COLLARS TO BE USED ON ALL PLASTIC PIPEWORK PENETRATING FIRE RESISTANT CONSTRUCTION. COVERS 8 FRA NES Os TO VEHICULAR TRAFFIC TO BE 0535 CAST IRON. MEDIUM DUTY UNO
@)- Educt Vent IL Invert Level . : , NU.
Induct Vent io Inspection opening 2. COVERS IN GRASSED OR CONC. AREAS TO BE 535 CAST IRON, CONCRETE INFILL LIGHT DUTY.
. ios Inspection Opening to Surface SANITARY DRAINAGE 3. COVERS IN PAVED AREAS TO BE 600 SQ. INFILL TO MATCH PAVING PATTERN. .
Cg} ° a ner Riser Kec Kerb & Channel 1. UNDERGROUND PIPEWORK SHALL BE @100 PVC DWV, AND UPVC WHERE EXPOSED, MIN GRADE 1:60 U.N.O. 4. COVERS IN TILED AREAS TO BE AS FOR PAVED AREAS WITH BRASS EDGING. Hyd raulic =:
= Fire Dropper 2. SUSPENDED PIPEWORK SHALL BE PVC CLASS DWV. 5. CONCRETE INFILL COVERS TO BE STAMPED "SWD" OR "SEW" AS APPROPRIATE.
NRV N t I
Fire Riser BB Bath ‘box 3. TRADE WASTE PIPEWORK TO GREASE TRAP SUSPENDED SHALL BE "COESPRENE" OR HDPE. Va
PLV Pressure limiting valve 4. UNDERGROUND SHALL BE VITREOUS CLAY OR HDPE. contact: Reinhold Koenning MlAust RPEQ No 7023
PO Planter outlet 5. TRADE WASTE PIPEWORK TO OIL SEPARATOR SHALL BE HDPE, OR VITREOUS CLAY WITH"NITRILE" RUBBER RINGS. GRATINGS BO Box 181 9g
=~ Vv Val , " ” Ox
Te he Hose Cock Ree Reel Property seeeaetn 6. CLEANOUTS OR INSPECTION OPENINGS BROUGHT TO SURFACE IN PAVED OR CONCRETE AREAS, OR WITHIN BUILDINGS TO HAVE 1. See OS SO COROT NON TER TO BE "FASTON, GATIC" OR APPROVED EQUAL DUTY TO MATCH MANUFACTURERS RECOMMENDATIONS Moffat Beach, QLD, 4551
RPZD Reduce Pressure Zone device BRASS CAPS, SEALED AND SCREWED. - email: [email protected]
———-_ een Eccentric Enlarger RWO Rai i tlet 2. TRENCH GRATE TO BE TRANSVERSE BAR. PH: (07) 5491 4333
me-che-— on Enlarger RWH Rain water head 3. FLOOR WASTE GRATES TO BE CHROME PLATED BRASS CLIENT :
8p Sanitary Drainage STORMWATER DRAINAGE
/ 3 Square 1. UNDERGROUND PIPEWORK SHALL BE 100 PVC CLASS SW MIN GRADE 1:100 U.N.O. CONNECTIVITY P/L
ORG Overflow Relief Gully s/t Safe Tray 2. DOWNPIPES SHALL BE @100 PVC CLASS SW, U.N.O ON HYDRAULIC PLANS. FIRE SERVICE
Wat I) Storm water drain 3. RAINWATER OUTLETS (RWO) AND PLANTER OUTLETS (PO) SHALL BE "GATIC WADE" OR SIMILAR, WITH MEMBRANE CLAMPS WHERE 1, ALL HYDRANT PIPEWORK TO BE IN ACCORDANCE WITH AS2419-2005 CLAUSE 6.8. DESIGNER:
[]o we Water td Tropped Tundish REQUIRED. 2. ALL HYDRANT PIPEWORK TO BE IDENTIFIED IN ACCORDANCE WITH AS1345. DES CRAWFORD
TC Test gate 4. GULLY PITS SHALL BE CONCRETE BODY IN TRAFFICABLE AREAS AND POLY IN NON TRAFFICABLE AREAS U.N.O. 3. ALL HYDRANTS AND FIRE HOSE REELS SHALL HAVE A MINIMUM CLEARANCE (IN ALL DIRECTIONS) OF 100MM AROUND THE HANDWHEEL. y J
sk Sink td Tundish 5. POLLUTION CONTROL MANAGEMENT PLAN (PCMP): 4. ALL HYDRANTS TO BE FITTED WITH THE VALVE OUTLET AT RIGHT ANGLES TO THE FACE OR WALL BEHIND IT. THE VAVLE OUTLET IS TO BE /proJEcT: 31 CORSAIR CRESCENT \
Tat Trench grate transverse bar : HORIZONTAL OR SLOPING AT A MAXIMUM OF 35 DEGREES BELOW HORIZONTAL
LT Laundry Tub rei, areneh, grate longitudinal bar FO ST ATL IN PLOW PIERO DEVISRe IKE 5. EXTERNAL FEED HYDRANTS SHALL BE POSITIONED WITHIN 20M OF A ROAD, HARDSTAND OR THE LIKE TO WHICH THE FIRE AUTHORITY PUMP SUNRISE BEACH
y TMV. Thermostatic mixing valve 5.2. TO LIST ALL IN FLOW FILTERING DEVICES LIKE LEAF EATERS AT DP'S AND OTHER FILTERS. : , DUPLEX
ol wm — Washing Vv Tempering valve 5.3. TO KEEP AND MAINTAIN A LOG OF CLEANING. APPLIANCE HAS ACCESS.
Machine u/g Underground 5.4, TO CLEAN DEVICES SUCH AS GUTTERS AND GULLY PITS: 6. EXTERNAL HYDRANTS SHALL BE POSITIONED NOT LESS THAN 10M FROM THE BUILDING UNLESS PROTECTED BY A CONSTRUCITON HAVING DRAWING TITLE:
S EWG Floor Weste Gully u/s Under ‘slab erwi “AS TO MANUFACTURES SPECIFICATION A FIRE RESISTANCE LEVEL OF NOT LESS THAN 90/90/90 EXTENDING AT LEAST 2M EITHER SIDE OF THE HYDRANT OUTLET, AND WHICH EVER
We Wake copie otherwise “MINIMUM QUARTERLY, BUT MONTHLY IN RAINY SEASON IS THE LESSER, 3M FROM THE GROUND LEVEL ADJACENT TO THE HYDRANT OR THE HEIGHT OF THE BUILDING.
os Bn Basin “AFTER EACH MAJOR RAINFALL EVENT 7. FIRE AUTHORITY BOOSTER CONNECTIONS SHALL BE INSTALLED WITHIN 8M OF A ROAD, HARDSTAND OR THE LIKE TO WHICH THE FIRE J
5.5. TO INSPECT AND CLEAN TANKS MINIMUM ONCE YEARLY. AUTHORITY PUMP APPLIANCE HAS ACCESS.
C)) bth Both Shr Shower 5.6. TO INSTALL AND MAINTAIN PUMP AND FIXTURES FOR REUSE/WATERING/IRRIGATION AS TO MANUFACTURES SPECIFICATION 8. MATERIALS: — <@100 Ohe a conor MOVE Soo uns IN GROUND. COVER SHEET )
ELF Fre Hose Ree OMS Het eter sytem Foo oe UN STONE.
La «= ME_—s Water Meter CS Cleaners Sk 9. DONOT USE GALVANISED FOR UNDERGROUND PIPE WORK.
Design Ae. Checked (Ch Dote 01-03-16 Dwg. No. AMD,
SCALE: 1 : 200 ON At UNO. 1 Of 4 3105-1 J

 

 

 

 

 

 

RPD:—

LOT 219 RP 135364

 

 
Full text of the other 5 pages

Page 2

          -

   NOOSA COUNCIL
   APPROVED PLAN
OPW16/0050 23 MAY 2016


[OCR of page images]
 

 

< LAND

 

X

2

PROVIDE

INLET WITH GRATED LID
SL23.950

IL23.150

 

 

\

\

(@
8

PROVIDE 450sq FIELD
INLET WITH GRATED LID “©
SL23.950

IL22.950

450sq FIELD ——— |

a

Approximate Sewer Line Location

 

 

Sewer M/H

  
  
   
   
   

75min

A

 

ZL

 

 

 

Oo
D gy &

Ce wy
pgxyuud
O J= 2
aa =Foesz
x oS ae

NOTE:

 

 

NOOSA COUNCIL
APPROVED PLAN

OPW16/0050 23 MAY 2016

 

 

ONLY THE REMAINING CATCHMENT AREAS
WHICH ARE NOT DIRECTED TO THE KERB
& CHANNEL SHALL BE USED TO CHARGE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

\“ PROVIDE 450sq FIELD

INLET WITH HEAVY DUTY,
CLASS D GRATE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

   

 

 

 

 

 

   

  

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

9150: SL28.100
THE HARVESTING TANK #150 1L27.100
Sa Se SS po
TIMBER SLEEPER RETAINING WALL garden
BUILDER ERMINE EXTENT
| OF RETAINING WALL, ON SITE. |
| Rv RW RW RW RW RW
| 9150 C2 \ RETAINING WALL |
YO ic_timber retaih
| ~ wall |
<P lls
IL22.950 Bly Flog |
: - — TOP 6 t cP3 "109
a Ny utility rooyn |-6100
a |
| bed. 3 ay Fr28-200
EVERHARD ROOF WATER =
es 3 _
| | DOMETRENCH AS =< ||| HARVESTING TANK 3
| PER DETAIL bed, 2 ~~ slid.doors ES z
ct | \ robe 32 &
| | 4 a < Bs <
| | 1800mm HIGH CEMENT R.L.25.355 "|
DOmm HIGH CEM TOP OF SLAB
i RENDERED BLOCK FENCE 4 ee ay gFi28.000
Ht [- ‘
| eS ow a Q>
Ee )s = ~x
| | terrace bed. 2 85 Ro 0F WATER 7
| | RL25.25 s . oe HARVESTING TANK
Top OF STAB a terrace ® eri28.2
| RL.95,305 bed. 3
TOP OF SLAB oe / 5
ce X.L.25.30f
ee OF i Yo
utility roqm
-— 100
a — | )\ il GP4
|o \pump/ y
> —_
pool : < timber retath
fw garden wall
__L
oe Beth opt RW R R RW RW
0150 3 96.425

 

 

5 Approximate. hou
Connection Plott
From Records

2000min

 

  
 
    

Hot Dip Galvanised Kerb
adaptor to match kerb

Title

NOTE:

ONLY THE REMAINING CATCHMENT AREAS
WHICH ARE NOT DIRECTED TO THE KERB
& CHANNEL SHALL BE USED TO CHARGE
THE HARVESTING TANK

)
-
450

 

 

 

 

 

 

 

 

 

75min 75min

 

 

 

profile
\ 125 x 75 x 6mm Galvanised

MS section

Connection fitting
refer Detail ’A’

 

 

4

 

 

 

#100

 

 

 

 

 

 

 

- Hot dip MS connection
A fitting or approved equivalent.

pipes to sealed with silicone or

DETAIL A

mortar into fittings.

 

           
       
       
   
 

 

Notes:

1. UPVC pipe to be 100mm heavy duty DWV
class SN6

2. All steel works to be hot dip galvanised

3. All joints on PVC pipe to be sealed with
solvent weld cement (type N or P), or

rubber ring joint.

Fitting for connection of #100
uPVC pipe to 125 x 75 x 6mm
i~=———MS section

TYPICAL CROSS SECTION OF STORMWATER TO KERB

 

NOT TO SCALE

PROVIDE 450sq FIELD
INLET WITH HEAVY DUTY,
CLASS D GRATE
SL28.100

1L27.100

PRE & POST DEVELOPMENT RUNOFF CALCULATIONS:

RUNOFF & DETENTION CALCULATIONS:

MAXIMUM _ EVENT: Q100
TIME OF CONCENTRATION: Smin
INTENSITY: 326mm/hr
SITE AREA: 608sqm
IMPERVIOUS AREA: 351sqm
PRE DEVELOPMENT PEAK RUNOFF: 48L/s

PEAK RUNOFF POST DEVELOPMENT:

ROOF CATCHMENT AREA DIVERTED TO CORSAIR CRESCENT KERB & CHANNEL
14L/sec

AT MAXIMUM Q20 DESIGN FLOW: MINUS 2*7L/sec =

ACHIEVED POST DEVELOPMENT RUNOFF: 52-14 =

52L/s (NO RETENTION)

38L/sec < 48L/sec

 

LEVEL OF SEALED PIPE
TO BE MINIMUM 1.5m
ABOVE STREET LEVEL

CONNECT TO KERB & CHANNEL

REFER TO DETAIL. LEVEL OF KERB

 

R

OOF TO KERB DIAGRAMATIC

SCALE: NTS

100sqm ROOF CATCHMENT AREA
TO BE DIRECTED TO CORSAIR
CRESCENT KERB & CHANNEL
Q20 = 7L/sec

LEVEL OF WATER
IN PIPE SYSTEM

TRICKLE DRAIN
WITH VALVE

 

scent

Cre

 

AREA TO

AREA

EMAINING CATCHMENT

Lrewn CATCHMENT

 

  

TANK

 

 

 

 

TO TANK

 

 

 

 

 

 

Corsair Cresent

 

 

 

Corsair

Level surface

\, OOsqm ROOF CATCHMENT AREA
TO BE DIRECTED TO CORSAIR
CRESCENT KERB & CHANNEL
Q20 = 7L/sec

ROOF CATCHMENT AREAS TO KERB&CHANNEL

 

O’land flow path

 

600

 

 

 

100

 

| | 300 ||
100 100

DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED
FOR ASSESSMENT, TENDERING AND CONSTRUCTION.

 

 

 

 

PO Box 181

Amd Description Date
A___DRAINAGE CONCEPT CHANGED, RESPONSE TO RFI 11-04-16
Issue Notes Date
For Development Approval
For Building Approval x 01-03-16
For Tender
For Construction
As Constructed
E Hydraulic 3:
1
I
~ >)

contact: Reinhold Koenning MiEAust RPEQ No 7023

Domed trench
SUPPLIED BY EVERHARD INDUSTRIES

50mm crushed
aggregate or
gravel

Geotextile
filter cloth

DOMED TRENCH DETAILS

Moffat Beach, QLD, 4551
email: [email protected]
PH: (07) 5491 4333

 

CLIENT :
CONNECTIVITY P/L
DESIGNER:
LL DES CRAWFORD J
(Prosect: 31 CORSAIR CRESCENT Y
SUNRISE BEACH
DUPLEX
DRAWING TITLE:
STORMWATER J
DRAINAGE AND )
MANAGEMENT PLAN
Design AH. Checked (Ch Date 01-03-16 Dwg. No. AMD.
\ Scale: 1: 100 ON A1 UNO. 2 Of 4 3105-2 A)

 

RPD:— LOT 219 RP 135364

 

 

 

Page 3

          -

   NOOSA COUNCIL
   APPROVED PLAN
OPW16/0050 23 MAY 2016


[OCR of page images]
 

 
 
  
   

 

 

 

NOOSA COUNCIL
APPROVED PLAN
OPW16/0050 23 MAY 2016

 

 

TEMPORARY
SEDIMENT CONTROL
FENCE REFER DETAIL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

F42 Fabric to AS1304

Desturbed area | i,
Geotextile fabric

 

oO,
8,
OK.
7 “pn

M%,

 

 

 

 

 

Posts or steel pickets
driven 600mm into ground

CX

tes
ROKK KK

eg
<
ose

oe

 

soconece

100min vertical overlap of fabric

   

600max

 

Undisturbed area

Backfill Fix to top of stake with
shadecloth fastener or
tie to steel picket

200

  

Geotextile Fabric ry
and F42 |
| 50x50 HW stake or steel
| picket 1200min long
Overflow |
a
Backfill

 

PERIMETER SEDIMENT FENCE DETAIL

 

Geotextile fabric,
Bidum U34 or similar.

  
  
  

trap

Runoff from pad
directed to sediment

4 om in i _
“LI Lt Ld _ | Ld |
| I |
! ! | ! #
|
| 0”
| i | \ ®
! : : hn
! a o
i ' 1 =
©
| 2
0
| ©
| j |
[}-_——_-_____;} a :
iC Oo Lo “
: : c
© N N 80
N N ~N N N

Berm (300mm min height)

   

TEMPORARY CONSTRUCTION ENTRY/EXIT
SEDIMENT TRAP

TEMPORARY CONSTRUCTION
ENTRY/EXIT SEDIMENT TRAP.
REFER DETAIL.

DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED
FOR ASSESSMENT, TENDERING AND CONSTRUCTION.

 

 

‘Amd Description Date
Issue Notes Date

For Development Approval

For Building Approval x 01-03-16

For Tender

For Construction

As Constructed

E Hydraulic 3:

contact: Reinhold Koenning MiEAust RPEQ No 7023
PO Box 181
Moffat Beach, QLD, 4551

 

\-

email: [email protected]
PH: (07) 5491 4333

CLIENT :
CONNECTIVITY P/L

DESIGNER:
iS DES CRAWFORD

(PRouect: 31 CORSAIR CRESCENT
SUNRISE BEACH
DUPLEX

DRAWING TITLE:

A

STORMWATER
DRAINAGE AND )
MANAGEMENT PLAN
Design He. Checked (Ch. Date 01-03-16 Dwg. No. AMD.
SCALE: 1 : 100 ON At UNO, 3 Of 4 3105-3 J

 

 

 

RPD:— LOT 219 RP 135364

 

Page 4

          -

   NOOSA COUNCIL
   APPROVED PLAN
OPW16/0050 23 MAY 2016


[OCR of page images]
 

 

an

SEDIMENT & EROSION CONTROL NOTES

 

Erosion and sediment control devices shall be installed and maintained in 9. The underground drainage system shall be used to convey runoff throughout
accordance with these drawings unless an alternative proposal is approved in construction. All drainage pits shall be constructed prior to placement of
writing by the superintendent. Additional erosion and sediment controls shall sub-base material and shall contain a suitable cut-out to capture run-off from
also be installed as necessary during construction. base of boxing during construction.

All erosion and sedimentation control devices shall be installed prior to 10. The underground drainage system including all pits, pipes and GPT shall be
stripping topsoil or commencing earthworks anywhere else on site unless cleaned of sediment prior to on maintenance. Unless otherwise approved by
otherwise approved by the superintendent. An inspection hold point is the Superintendent all temporary erosion and sediment control measures
required at this point prior to the works proceeding. shall be removed at the completion of construction.

Where erosion and sediment control devices cannot be installed due to 11. However such removal shall not proceed until the site is stabilised to the
earthworks or other work operations, they shall be installed at the earliest Superintendent's satisfaction.

possible date. 12. All construction vehicles shall be cleaned of mud and/or loose dirt prior to
Permanent coverage of disturbed areas with topsoil and turf, hydromulch or leaving the site.

mulch (and jute matting if required) is to be undertaken at the earliest 13. No release, or flow is permitted from the site, throughout the earthworks and

practical time.

Turf shall be laid behind kerb and channel for full verge width.

construction period, to any waterway, or stormwater drain or drainage line
leading to a waterway or area of native vegetation, unless the level of total

In order to prevent erosion from concentrated flow paths, the contractor shall suspended solids does not exceed a concentration of 50 milligrams per litre.

follow the following site protection principles:
- Install turf in permanent open drain;

14 An effective water quality self-monitoring program, including at least one
representative measurement of the total suspended solids quality of any flow

- Install geofabric in temporary open drains where shown on drawing; or release from the site on each day runoff to water occurs, must be

- Install sand bags, rock check dams or mulch bunds at 20m centres in all implemented continuously throughout the life of the works which are the
concentrated flow paths including cut-off drains along kerb and channel, subject of this approval. Where the findings of the required performance

along sediment fences, mulch or earth bunds except where drains are lined self-monitoring program indicate that the 50mg/L TSS compliance limit is being
with turf or geofabric. or is likely to be exceeded, remedial action must be taken without delay to

All disturbed areas shall be covered with 100mm of topsoil prior to turfing, ensure ongoing compliance.

seeding, hydromulching or mulching.
All batters 1 on 4 and steeper shall be tined to a depth of 200mm in

15. Sufficient stockpiles of mulch and/or other similar required erosion and
sediment control materials and stores must be maintained on site at all times

accordance with Main Roads specifications prior to topsoiling and mulching to enable ongoing erosion control, as well as site contingencies e.g. imminent
(75mm thick). Batters steeper than 1 on 2 shall also have heavy duty jute wet weather, to be dealt with, until commencement of on maintenance.
matting installed over the mulch. all other disturbed areas shall be covered

with hydromulch.

LEGEND

 

 

agi
e FWG
a GP1
oa

Existing storm water
Storm Water Drainage

Agi Drain

Floor Waste
gully

Gully Pit

Sediment Fence

-—_—-o Boundary

@ Diameter

C.0.8. Cleanout to surface

Een Eccentric Enlarger

FFL Finished floor level

GP. Gully pit

GMH Gully Man Hole

IC Inspection Chamber

IL Invert Level

K&C Kerb & Channel

MH Manhole

PO Planter outlet

RPB Real Property Boundary
RPD Real Property description
RWO Rain water outlet

RWH Rain water head

SL Surface Level

Sq Square

SWD Storm water drain

Tat Trench grate transverse bar
TG(I) Trench grate longitudinal bar
u/g Underground

u/s Under slab

u.n.o. Unless noted otherwise

 

 

 

 

 

 

 

 

Task ISSUES EROSION & SEDIMENT CONTROL STORMWATER QUALITY
PERFORMANCE MINIMIZE SOIL EROSION SITE DURING AVOID DETRIMENTAL IMPACT ON THE WATER QUALITY AND AQUATIC ENVIRONMENT OF DOWNSTREAM WATER
CONSTRUCTION AND REHABILITATION STAGES BODIES AS A RESULT OF DISCHARGE OF CONTAMINATED STORMWATER RUNOFF FROM CONSTRUCTION WORKS
AND AT ALL TIMES PREVENT THE TRANSPORT AND COMPLY WITH THE ENVIRONMENTAL ACT ON ENVIRONMENTAL PROTECTION POLICY FOR WATER.
OF SEDIMENT FROM THE SITE.
MANAGEMENT e INSTALL THE CONTROL DEVICES AND ¢ COMPLY WITH THE ENVIRONMENTAL PROTECTION ACT AND ENVIRONMENTAL PROTECTION POLICY (WATER)
STRATEGY FOLLOW THE STABILIZATION PROCEDURES e ALL CONTROL MEASURES SHALL BE IN PLACE PRIOR TO COMMENCING SITE STRIPPING.
DESCRIBED ON PLANS. e CONSTRUCTION MATERIALS AND STOCKPILES STORED ON SITE SHALL BE PLACE IN PREPARED LOCATIONS,
e LIMIT THE EXTENT OF STRIPPING TO THE AND PROTECTED AS SHOWN.
STAGE AREA PRESENTLY UNDER e FUELS AND OILS SHALL BE SAFELY STORED TO AVOID INUNDATION. ANY SPILLAGES WITHIN THESE
CONSTRUCTION. COMPOUNDS SHALL BE IMMEDIATELY ATTENDED TO SO AS TO LIMIT THE POTENTIAL FOR IMPACT
e ALL MUD AND SILT DEPOSITED ON THE OFF-SITE.
ADJACENT ROADWAY SHALL BE REMOVED e PROVIDE CONTROL MEASURES TO PREVENT SOIL EROSION , SCOURING, SEDIMENT TRANSPORT AND
BY SWEEPING. DEPOSITION. THESE MEASURE ARE IDENTIFIED IN THE SOIL & EROSION CONTROL PLAN BUT MAY BE
e¢ PROTECT STORMWATER DRAINAGE INLETS EXTENDED AS REQUIRED AND MAY INCLUDE:
AS SHOWN BELOW UNTIL THE SITE HAS — TEMPORARY RETARDATION BASIN
BEEN STABALIZED. — TEMPORARY SILT FENCE
e¢ WASH FROM EXPOSED AGGREGATE — DIVERSION OF UPSTREAM CATCHMENT AROUND DISTURBED AREAS
CONCRETING SHALL BE WHOLLY e IN AREAS WHERE RUNOFF TURBIDITY IS TO BE CONTROLLED, EXPOSED SURFACES SHALL BE MULCHED
CONTAINED ON SITE. CEMENT RESIDUE OR STABILIZED WITH TURF IF EARTHWORKS ARE EXPECTED TO EXTEND FOR THAT TWO WEEKS.
SHALL BE ALLOWED TO DRY THEN e PERMANENT CONTROL MEASURES WILL BE IN PLACE UPON COMPLETION OF CONSTRUCTION, HOWEVER
REMOVED FROM SITE. MAINTENANCE WILL BE REQUIRED OF SOME TEMPORARY FACILITIES UNTIL FULL SITE REHABILITATION HAS
BEEN ACHIEVED.
MONITORING THE PRINCIPAL CONTRACTOR SHALL AT ALL THE PRINCIPAL CONTRACTOR SHALL ENSURE NO SUSPENDED SOLIDS OR CONTAMINANTS ARE VISIBLE IN
TIMES ENSURE THAT CONTROL DEVICES ARE SURFACE RUNOFF LEAVING THE SITE.
CORRECTLY INSTALLED AND ADEQUATELY
MAINTAINED, IN PARTICULAR PRIOR TO
FORECAST PERIODS OF RAIN OR STORMS.
CORRECTIVE e¢ EMPTY AND REPAIR TRAPS REGULARLY.
ACTIONS e REPAIR OR REPLACE DAMAGED CONTROL e REPAIR OR EXTEND CONTROL DEVICES TO OPERATE ADEQUATELY.
DEVICES. e INSTALL ADDITIONAL SEDIMENTS TRAPS TO RETARD SURFACE RUNOFF ACROSS THE WORKS AREA.
e PLACE ADDITIONAL CONTROL DEVICES
WHERE EXISTING INSTALLATIONS ARE
INADEQUATE.
REPORTING WEEKLY REPORTS BY THE PRINCIPAL
CONTRACTOR TO THE CONSULTANT DETAILING WEEKLY REPORTS BY THE CONTRACTOR TO THE CONSULTANT OUTLINING THE EFFECTIVENESS OF CONTROL
MAINTENANCE PROGRAM, ADDITIONAL WORKS MEASURES AND DETAILS OF ANY CORRECTIVE ACTIONS TAKEN
AND THE PERFORMANCE OF CONTROL
MEASURES.

 

 

 

SEDIMENT & EROSION MANAGMENT PLAN

 

 

 

 

 

 

 

 

   

 

 

 

 

 

Prior to the commencment of any construction activities the following measures
shall be incorporated:
SEDIMENT AND EROSION CONTROL MANAGEMENT PLAN: e Provide education of site personnel
e Set up action plans as a precaution in case of disturbances occuring
© OBJECTIVE: especially after an unexpected strong rainfall event
To minimise erosion on site and ensure sediment is not washed down to the receiving waterways due to construction e Provide regular inspection and maintenance of all structures including the DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED
activities FOR ASSESSMENT, TENDERING AND CONSTRUCTION.
temporary structures.
¢ LEGISLATION: Amd Description Date
Environment Protection Act 1994
Environmental Protection Water Policy 1997
The Integrated Planning Act 1997
e RESPONSIBILITY:
The responsibility for all measures regarding the sediment and erosion control during construction shall be with the
CONTRACTOR. The contractor shall appoint one staff member, ideally the foreman to be responsible for:
*the location of drain paths such as swales and trenched, cut off swales, catch drains and perimeter banks. All of BOOS TS SONS SbUGtOn THE CONTRACTOR SHALL PROVIDE A
these measures shall ensure the runoff is directed to the sedimentation basin during construction. PLAN FOR STOCKPILING, MATERIALS STORAGE AND WASTE
**the waste and wash down of materials and goods in particular concrete and cement shall be separated, set to dry MANAGEMENT. THIS PLAN MAY BE A HAND DRAWN SKETCH BUT
wed disposed of , . SHALL BE VISIBLEY PLACED IN THE SITE OFFICE.
installation and maintenance of the sediment control fences all around the perimeter as shown in plan ADVICE:
**“control of fences, sandbags and bales as well as the sedimentation basin after each rainfall event ._ LOCATE STOCK PILES ON LEVEL GROUND AWAY
***control of the entry/exit path and the minimization of sediment transfer to the street in particular control of concrete FROM AREAS SUBJECT TO CONCENTRATED Issue Notes Date
and earthmoving vehicles OVERLAND FLOW. For Development Approval
“supervise other members of staff and lead by example | —- . CONSTRUCT A PERMENENT BANK OR CATCH DRAIN For Building Approval x 01-03-16
*“ensure enough litter collection devices are provided for the collection of daily litter such as cans, bottles, paper, ABOVE STOCK PILE TO PROTECT IT FROM UPHILL
butts and also building material cut offs. RUNOFF. For Tender
***ensure all stockpiles for both incoming and outgoing goods in particular soils and sands are clearly marked and not . CONSTRUCT A SEDIMENT FENCE BELOW THE For Construction
blocking drain paths and kept neat and clean. STOCKPILE TO TRAP SEDIMENTS BEING WASHED
***control the flow path of stormwater at all times during construction and use swales, sandbags, bales and other OFF THE PILE As Constructed
measures to ensure the runoff is directed to the sedimentation basin at all times. . PROVIDE ACCESS TO STOCKPILE FROM SIDE SO AS
TO AVOID RUNOFF PASSING THROUGH.
e ACTIONS:
In case of major rainfall events the following action plan shall be followed and responsibly looked after by the
CONTRACTOR: .
CUT—OFF DRAIN ALONG CONTOUR — LONG TERM PLASTIC SHEET WHEN RAIN OR H draulic woh
***DON'T WAIT UNITL IT IS TOO LATE! STOCKPILES ONLY (GRADE AT 1 IN 100 max. TO FREE HIGH WINDS ARE EXPECTED. y V
be on site during the rainfall period and monitor the drain paths. Redirect where required. OUTLET.) STABILIZE ALL EARTHWORKS AREAS WITH TURF.
“check the fences after every rainfall and replace the fences where required. Check and replace all barriers, V—
bales, sandbags and temporary swales, cut off drains and trenches where required. CONTACT: Rein ho | d Koe nn i ng MiEAust RPEQ No 7023
***clean out sedimentation material as soon as the moisture content allows it. FLOW PO Box 181
“check the receiving pit and improve the barriers if required. KG SS Moffat B h
wee . RRRRRRRRR A < . joffa each, QLD, 4551
REMEMBER: EACH RAINFALL IS THE EVENT TO ACTIVELY WATCH AND CONTROL THE RUNOFF! RRR, Via RRR Re 7 email: [email protected]
SS SII SRI av WAIT SATA IS PH: (07) 5491 4333
Y CLIENT :
SEDIMENT FENCE AS SPECIFIED ALONG CONTUR
(EXTEND 3m min. EACH SIDE OF STOCKPILE. CONNECTIVITY P/L
DESIGNER:
STOCKPILES \ DES CRAWFORD J
1. PLACE STOCKPILES 5m min. UPSTREAM OF EXISTING VEGETATION, (PROJECT: 31 CORSAIR CRESCENT Y
CONCENTRATED WATER FLOW, ROADS, AND HAZARD AREAS. SUNRISE BEACH
2. CONSTRUCT ALONG THE CONTOUR AS LOW, FLAT, ELONGATED DUPLEX
MOUNDS (2m max. HEIGHT.)
DRAWING TITLE:
| L STORMWATER /
NOOSA COUNC DRAINAGE AND )
APPROVED PLAN eee
OPW16/0050 23 MAY 2016 Pen RH thes, Gh pte 01-03-18 Boo Non
SCALE: 1 : 100 on At uno. 4 Of 4 3105-4 J
RPD:— LOT 219 RP 135364

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 5

          -
   NOOSA COUNCIL
   APPROVED PLAN
OPW16/0050 23 MAY 2016


[OCR of page images]
FORM KEY IN EDGE OF Ist POURED SLAB COAST
FACE OF SLAB WITH BOND PREVENTATIVE.

BOLSTER CUT SLAB (3Wx30D), FILL (eg, HYDROSEAL, FORMOIL).

JOINT TO 30mm BELOW SURFACE WITH
FOSROC EXPANDITE THIOFLEX G00G.

| LAYER F72 FABRIC.

30 TOP COVER. 25

 

 

 

 

 
           

 

 

 

 

 

i
L $.0.G | b | : “Tl \

S SEX z SSS SS] 4 a z SSS j r

S LS TION SID. * YD

  
 

 

SUBGRADE TO BE COMPACTED TO 98% CUT EVERY 2nd WIRE DIRECTLY UNDER
STANDARD COMPACTION (TEST El.! ASI284). JOINT € DEPRESS FABRIC LOCALLY.

EDGE THICKENING (ET) TOOLED JOINT (TJ)

TYPICAL TO ALL EDGES OF DRIVEWAY SLAB. ALTERNATIVELY: SAW CUT SLAB 3Wx30D WITHIN
DISCONTINUE FABRIC 40mm FROM END. 24 HOURS OF CASTING SEAL AS ABOVE.

DRIVEWAY SLAB ON GROUND DETAILS

3 BAR FIITM.
50 BOTTOM COVER,

KEYED JOINT (KJ)

300

 

 

 

DRIVEWAY NOTES:

- TOOLED JOINTS (TJ) @2m CRS MAX.

|, EXISTING FOOTPATHS TO BE SAW CUT PRIOR TO REMOVAL.

2, CROSSINGS ARE NOT DESIGNED FOR COMMERCIAL VEHICLES.

3. CONCRETE DRIVEWAY TO BE 125mm THICK EXCLUDING ANY FINISH TREATMENTS. eg.
STAMPED CONCRETE FINISH.

CONCRETE SURFACE TOLERANCE TO BE 0-5mm, OVER 3 METRE SECTIONS.
CONCRETE N25 IN ACCORDANCE WITH ASI374 AND AS3600.

REINFORCEMENT FABRIC TO ASI304, 50 TOP AND EDGE COVER, LAP FABRIC 250.
APPROVED MATERIALS FOR CONSTRUCTION:- CONCRETE or ASPHALT.

EXPANSION JOINTS TO BE lOmm WIDE, FULL DEPTH CLOSED CELL CROSS LINKED
POLYETHYLENE FOAM (85-150kg/m3) OR COMPRESSED GRANULATED CORKBOARD,
INSTALLATION TO MANUFACTURERS INSTRUCTIONS.

9, ALL DIMENSIONS IN MILLIMETERS.

ONE ACCESS POINT TO BE CONSTRUCTED TO EACH LOT AS PER STANDARD DRAWING.
ll, FOR CURVED DRIVEWAYS, MAXIMUM GRADES APPLY TO INSIDE EDGE OF CURVE.
ALL SERVICES NEED TO BE LOCATED PRIOR TO EXCAVATION.

lOmm CORKJOINT OR
SIMILAR.

 

 

DIY

     

SOND SOY

BOLSTER CUT SLAB (3Wx30D).

- KEYED JOINTS (KJ) @6m CRS MAX,
- EXPANSION JOISTS (EJ) @lém CRS MAX,

| LAYER F72 MESH
30 TOP COVER.

CUT EVERY 2nd WIRE DIRECTLY UNDER
JOINT € DEPRESS FABRIC LOCALLY.

EXPANSION JOINT (EJ) TOOLED JOINT (TJ)

w Qo
=a va Ss
wy EF

ALTERNATIVELY: SAW CUT SLAB 3Wx30D WITHIN

 

140 BLOCKWALL 24 HOURS OF CASTING.

\ 7] lo
BARRIER/SEMI-MOUNTABLE
KERB AND CHANNEL. 7}
CAPACITY |00kPa. )

FOOTPATH

       

NI2 VER BARS @400 CRS. LAP

PROPERTY BOUNDARY

  

500 WITH NI2 FROM FOOTING.———} > ott :
NI2 HOR BARS @400 CRS, LAP x ans 8
450 WHERE REQ'D AND AT = S a
CORNERS. lo S 2
S DRIVEWAY DETAILS AND g|-
“ a NONSLIP zx NOTES TAKEN FROM COUNCIL Eig
PSH roy RESIDENTIAL DRIVEWAY Sl
CONSTRUCTION 88 DRAWING 8-050. asl
Su ~)
lo JOINT. [7] we

 

 

  

1000

3 BAR F8TM TOP &
BOTTOM, RIO LIGS

@600 CRS. L
SKK NS

Hes

 

MOUNTABLE KERB

KK
> AND CHANNEL. ~~

BARRIER,
SEMI-MOUNTABLE,
MOUNTABLE KERB ¢
CHANNEL OR INVERT

CROSSING.

 

 

 

 

 

 

 

FOOTPATH

CHANNEL.

 

ALTERNATIVE PROFILE.

DRIVEWAY
CROSSING PLAN

NOT TO BE USED FOR
RETAINING, USE RW3.

2
S
ra)

 

 

 

Q 9 oO

350

 

 

 

 

 

PATH SLAB DETAILS

(TO BE FOUNDED ON MATERIAL OF MIN SAFE BEARING

F72 MIN FABR|

     
  

 

at, ET ¢z|

     
 

TR

 

FRX.

SAW CUT AND BREAKOUT
BACK OF KERB AND

DRIVEWAY
CROSSING DETAIL

 

 

 

SFI DETAILS

 

PETER RIENECKER - RPEQ 2088

 

 

R:\rienmacfiles\Rienmac\15\Large\15330 - Lt 219 Corsair Cr, Sunrise Bch - Steve-Dianne Selby - Des Crawford\15330.dwg, Model,
10/03/2016 12:29:14 PM, L Roth, Rienmac Pty Ltd, CutePDF Writer, A3, 1:100

 

 

NOOSA COUNCIL
APPROVED PLAN
OPW16/0050 23 MAY 2016

 

 

 

100 SLAB ON GROUND TO PATH. | LAYER F72 MESH 30 TOP
COVER, 50 SIDE AND END COVER. PROVIDE:

APPROVED PREFORMED
METAL KEY JOINT,

 

EYED JOINT (KJ)

RIENMAC ery ito

ABN. 52 010 666 430 AC.N. 010 666 430
CONSULTING CIVIL &
STRUCTURAL ENGINEERS

SUNSHINE COAST OFFICE:

SUITE 5, FIRST FLOOR, P:- (07) 5478 250d
SAINT CIRINO, F:- (07) 5444 {158
137 BRISBANE ROAD, Email:-info@rienmac. biz
(PO BOX 149) info@rienmac,ne'
MOOLOOLABA QLD 4557 Web:- www ,rienmac.bi

 

CLIENT:
CONNETIVITY PTY LTD
|c PROJECT:

PROPOSED UNITS

LOT 219 CORSAIR CRESENT
SUNRISE BEACH @LD 4567

REAL PROPERTY DESCRIPTION # COUNCIL:
LOT 219, RP 135364

PARISH OF WEYBA, COUNTY OF MARCH

 

 

 

 

 

 

 

 

SAND BED. SUNSHINE COAST REGIONAL COUNCIL
DRAWING TITLE:
DETAILS
Designed: PLR Drawn: LR
SCALES: 1:20
Engineer: PLR |DATE: 25 MAY [5
permnision fram Rlenmae Coaultng Engreers “| JOB NUMBER DWG No. | ISSUE
| DO NOT SCALE OFF DRAWINGS, | A3 |SHEET lo OF 2| |CHECKED: PLR

 

 

Page 6

                                                                                                                                                                             new concrete pathway constructed

                                                                                                                                                                             'Noosa Shire Council' standards
                                                                                                                                                                             in accordande with all relevant
                                                                                                                                       vehicle turning bay only
                                                                                                                                       no parking permitted




                                                                                                         Unit 2
                                                                                                         Level 3
                                                     Unit 2
                                                     Level 1
                                                                          -
                                                                   NOOSA COUNCIL
                                                                                                         Garage
                                                                   APPROVED PLAN                         Unit 2
                                                                OPW16/0050 23 MAY 2016
                                                                                                         Level 2
                                                                                                                             Exposed Aggerate
                                                                                                          Garage             Concrete Driveway
                                                                                                          Unit 1
                                                     Unit 1                                               Level 2
                                                     Level 1




                                                                                                                                                                             new concrete pathway constructed

                                                                                                                                                                             'Noosa Shire Council' standards
                                                                                                                                                                             in accordande with all relevant
                                                                                                          Unit 1
                                                                                                          Level 3

                                    pool
                                                                                                                                      vehicle turning bay only
                                                                                                                                      no parking permitted




Note                                                                                                                Planting Legend
Only ground covers shall be planted near the                                                                        code botanical name          common name      no. pot size         height spread
domedtrench & any required field gullys.                                  preparation of garden beds                trees
These plants shall be at least 900mm from the
outside face of the domedtrench.                                          planting
The ground covers are nominated as H & I on the
planting legend.                                                                                                    shrubs
For position of these services, refer to the
Construction Hydraulic drawings by Reinhold                               mulching
                                                  maintenance
Koenning (Dwg. No. 3105)
                                                                          installation of irrigation                ground covers


                      P 5448 2049
      Residential M 0488 238 001
 Building Design E [email protected]
       Des Crawford                                                                                    Landscape Plan

Used in these records

About this file

File size
2.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

OPW16_0050 - Approved Plans.pdf · 2.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.