OPW16/0050 23 MAY 2016
[OCR of page images]
Dive &
| NOOSA COUNCIL
APPROVED PLAN
NOTE:
DEPENDING ON GROUND CONDITIONS AND _ IF
REACTIVE SOIL IS FOUND ALL PENETRATIONS,
VERTICAL AND HORIZONTAL SHALL BE
DRAWING SCHEDULE
PROVIDED WITH SWIVEL JOINTS AND
EXPANSION JOINTS. ALL SUBSURFACE DRAINS
OPERATIONAL
WORKS
REQUIRE EXPANSION JOINTS AT 10m SPACING.
OPW16/0050 23 MAY 2016 3105-1_| COVER SHEET
STREET ADDRESS:
3105-2 STORMWATER DRAINAGE AND MANAGEMENT PLAN
5 1 CORSAIR CRESCENT 3105-3 EROSION AND SEDIMENT CONTROL PLAN (ESC)
D 3105-4 ESC NOTES
SUNRISE BEACH
REAL PROPERTY DESCRIPTION:
CLIENT NAME: Obs 4
55 a!
CONNECTIVITY P/L ee UE 3S
S age *
o
ie
@)
i i — = 4>
| | | | | Cc
= ° ; O
a | | | | | | | | \ LJ
a a o | | | | | | | | | WY
a < | | | | | | | | | Q
ro < !
m lo =: . | Po
Q ye =o & C
oO < a x “ | | | | | | | |
a o poe ° j j CO
oO por :
z 5 a | | | | |
a To Bor 2 , C
OQ a g j —
PROPOSED DUPLEX Qe Soe 8 | OC
a > Joos Ss | |
x paar 2 | VW)
Zz pH He 3 | | | | ¢
A |g poss Po | | i C
= pros é ! | )
+ mM po e | I | O
g Zz Sees @ J Cy
4 a 2 | { | L
a BEES : em a eh
a 3 ©
x 2 po=zat 5 g & g S 8 N N
a < Poros. — ——__
5 EEEE: = 7]
a 9
PORES soe
a £25
SoS Site 698 m?
SITE PLAN & EXISITNG SERVICES Roof 256. me
Driveway 95 m?
LOCALITY MAP Landscape 257 m?
SCALE NTIS. New impervious 351 m?
CATCHMENT AREAS
DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED
FOR ASSESSMENT, TENDERING AND CONSTRUCTION.
LEGEND GENERAL NOTES WATER SUPPLY Amd Description Date
aw Ron Water 3 Diameter 1. DO NOT SCALE FROM THESE DRAWINGS. 1, PIPEWORK SHALL BE IN ACCORDANCE WITH AS4020, FOR EXAMPLE: ABS (ACRYLONITRITE STYTRENE), PP (POLY PROPYLENE), PE
Existing Water tos. Cleanoat to surface 2. DONOT RELY ON THESE DRAWINGS FOR ALIGNMENT AND LEVELS OF EXISTING INFRASTRUCTURE. (POLYETHYLENE) OR COPPER U.N.O.
s Existing Sewer CJ Capped junction 3. ITIS THE OBLIGATION OF THE CONTRACTOR AND/OR PLUMBING CONTRACTOR TO SURVEY ALL EXISTING SERVICES PRIOR TO 2. WATER SUPPLY PIPEWORK SHALL BE @20 U.N.O. EXCEPTION: ONE FITTING ONLY MAY BE @15. MAX. LENGTH 3000 MM. HOT WATER PIPEWORK
Existing Storm water cv Conrol valve CONSTRUCTION. SHALL BE LAGGED. HOT WATER RECIRCULATING LINES TO BE INSULATED WITH 20MM "ARMAFLEX" OR SIMILAR.
HD Existing House drain cs Cleaners. sink 4. THE PLUMBING CONTRACTOR IS OBLIGED TO OBTAIN REAL SIZE PRINT OUTS (A1 U.N.O.) FOR THE PREPERATION OF TENDER. ANY 3. PROVIDE TEMPERING VALVES ON HOT WATER TO PERSONAL HYGIENE FIXTURES.
Sanitary Drainage Se Gold Woter anel CLAIMS REFERED TO AS "DRAWING COPIES" NOT READABLE SHALL BE REFUSED. 4. UNDERGROUND COPPER PIPEWORK SHALL BE "KEMLAGGED" OR OTHERWISE PROTECTED. UNDERGROUND PIPEWORK NOT UNDER
Grey Water Bev Double check walve 5. ALL KITCHEN, LAUNDRY & BATHROOM FITTINGS AND TOILETS SHALL COMPLY WITH THE MINIMUM WELS WATER RATING LEVEL 4 CONCRETE SLAB MAY BE POLYPIPE CLASS PN20, ONE SIZE LARGER THAN SHOWN.
fant oe Een Eccentric Enlarger STAR (FORMER AAAA WATER CONSERVATION RATING AS PER AS/NZ6400). 5. EXPOSED PIPEWORK IN AMENITIES AREAS, SHALL BE CHROME PLATED.
aT GO yuater Elev Dge Evevated Drainage 6. PROVIDE FLOW RESTRICTOR VALVES TO TAPS AND SHOWER ROSES WHERE REQUIRED. 6. SUBMETERS SHALL COMPLY WITH APPROVED DEVICES. REFER LOCAL AUTHORITY REGULATIONS. SUBMETERS SHALL BE LOCATED IN
————— Storm Water Drainage Fe False. ceiling 7. THE FLOW SHALL NOT EXCEED A MAXIMUM OF 9L/MIN. COMMON AREAS ONLY.
lll Fire FH Fire Hydrant 8. WATER SUPPLY AND SANITARY DRAINAGE HAS BEEN DESIGNED AND SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE Q'LD
cot Agi Drain FHR Fire hose reel STANDARD SEWERAGE LAW, Q'LD STANDARD WATER SUPPLY LAW, THE NATIONAL PLUMBING, DRAINAGE CODE AS 3500, THE meus Noles Dale
FFL Finished floor level Q'LAND DEVELOPMENT CODE QDC, THE FIRE HYDRANT CODE AS2419, ALL RELEVANT AUSTRALIAN STANDARDS, AND THE BACKFLOW PREVENTION
; ; FU Fixture units REQUIREMENTS OF THE LOCAL AUTHORITY. 1. PROVIDE HOSE CONNECTION VACUUM BREAKERS TO ALL HOSE COCKS PROVIDE RPZD TO ANY IRRIGATION CONNECTIONS, For Development Approval
(*" © Rain Water Riser GIT Grease Interceptor trap ildi x 01-03-16
' ep Gully pit 9. THESE DRAWINGS ARE DIAGRAMMATIC ONLY AND SHALL BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECTURAL AND/OR HAZARD ZONES. For Building Approval
Cold Water Riser GMH Gully Man Hole DRAWINGS, OTHER CONSULTANTS DRAWINGS, SPECIFICATIONS AND OTHER WRITTEN INSTRUCTIONS THAT MAY BE ISSUED 2. PROVIDE APPROVED BACK FLOW PREVENTION TO FIRE SERVICES, HYDRANT SUPPLY (TESTABLE SINGLE CHECK VALVE U.N.O.), For Tender
Down Pipe gv Gate valve DURING THE COURSE OF THE CONTRACT. ANY DISCREPANCIES SHALL BE REFERRED TO THE SUPERVISING OFFICER FOR ALL FIRE HOSE REELS WHICH MAY BE USED FOR OTHER THAN FIRE FIGHTING SHALL BE EQUIPPED WITH DOUBLE CHECK VALVES For Construction
Stack HW Hot water tion branch DECISION BEFORE PROCEEDING WITH THE WORK. CONTRACTOR'S SHALL VERIFY ALL FIXTURE LOCATIONS, INVERT LEVELS, (DCV) U.N.O. hs Constructed
Vent Pipe HD House drain SURFACE LEVELS, AND COVER TO PIPES ARE CORRECT AND OBTAINABLE PRIOR TO COMMENCEMENT OF THE WORK. THE EXACT
@) 3 HL High level LOCATION OF EXISTING, AND PROPOSED SERVICES, SHALL BE VERIFIED WITH THE RELEVANT AUTHORITY, OR OTHER TRADES AS
@) S) ° Group Vent IC Inspection Chamber APPLICABLE. FIRE STOP COLLARS TO BE USED ON ALL PLASTIC PIPEWORK PENETRATING FIRE RESISTANT CONSTRUCTION. COVERS 8 FRA NES Os TO VEHICULAR TRAFFIC TO BE 0535 CAST IRON. MEDIUM DUTY UNO
@)- Educt Vent IL Invert Level . : , NU.
Induct Vent io Inspection opening 2. COVERS IN GRASSED OR CONC. AREAS TO BE 535 CAST IRON, CONCRETE INFILL LIGHT DUTY.
. ios Inspection Opening to Surface SANITARY DRAINAGE 3. COVERS IN PAVED AREAS TO BE 600 SQ. INFILL TO MATCH PAVING PATTERN. .
Cg} ° a ner Riser Kec Kerb & Channel 1. UNDERGROUND PIPEWORK SHALL BE @100 PVC DWV, AND UPVC WHERE EXPOSED, MIN GRADE 1:60 U.N.O. 4. COVERS IN TILED AREAS TO BE AS FOR PAVED AREAS WITH BRASS EDGING. Hyd raulic =:
= Fire Dropper 2. SUSPENDED PIPEWORK SHALL BE PVC CLASS DWV. 5. CONCRETE INFILL COVERS TO BE STAMPED "SWD" OR "SEW" AS APPROPRIATE.
NRV N t I
Fire Riser BB Bath ‘box 3. TRADE WASTE PIPEWORK TO GREASE TRAP SUSPENDED SHALL BE "COESPRENE" OR HDPE. Va
PLV Pressure limiting valve 4. UNDERGROUND SHALL BE VITREOUS CLAY OR HDPE. contact: Reinhold Koenning MlAust RPEQ No 7023
PO Planter outlet 5. TRADE WASTE PIPEWORK TO OIL SEPARATOR SHALL BE HDPE, OR VITREOUS CLAY WITH"NITRILE" RUBBER RINGS. GRATINGS BO Box 181 9g
=~ Vv Val , " ” Ox
Te he Hose Cock Ree Reel Property seeeaetn 6. CLEANOUTS OR INSPECTION OPENINGS BROUGHT TO SURFACE IN PAVED OR CONCRETE AREAS, OR WITHIN BUILDINGS TO HAVE 1. See OS SO COROT NON TER TO BE "FASTON, GATIC" OR APPROVED EQUAL DUTY TO MATCH MANUFACTURERS RECOMMENDATIONS Moffat Beach, QLD, 4551
RPZD Reduce Pressure Zone device BRASS CAPS, SEALED AND SCREWED. - email: [email protected]
———-_ een Eccentric Enlarger RWO Rai i tlet 2. TRENCH GRATE TO BE TRANSVERSE BAR. PH: (07) 5491 4333
me-che-— on Enlarger RWH Rain water head 3. FLOOR WASTE GRATES TO BE CHROME PLATED BRASS CLIENT :
8p Sanitary Drainage STORMWATER DRAINAGE
/ 3 Square 1. UNDERGROUND PIPEWORK SHALL BE 100 PVC CLASS SW MIN GRADE 1:100 U.N.O. CONNECTIVITY P/L
ORG Overflow Relief Gully s/t Safe Tray 2. DOWNPIPES SHALL BE @100 PVC CLASS SW, U.N.O ON HYDRAULIC PLANS. FIRE SERVICE
Wat I) Storm water drain 3. RAINWATER OUTLETS (RWO) AND PLANTER OUTLETS (PO) SHALL BE "GATIC WADE" OR SIMILAR, WITH MEMBRANE CLAMPS WHERE 1, ALL HYDRANT PIPEWORK TO BE IN ACCORDANCE WITH AS2419-2005 CLAUSE 6.8. DESIGNER:
[]o we Water td Tropped Tundish REQUIRED. 2. ALL HYDRANT PIPEWORK TO BE IDENTIFIED IN ACCORDANCE WITH AS1345. DES CRAWFORD
TC Test gate 4. GULLY PITS SHALL BE CONCRETE BODY IN TRAFFICABLE AREAS AND POLY IN NON TRAFFICABLE AREAS U.N.O. 3. ALL HYDRANTS AND FIRE HOSE REELS SHALL HAVE A MINIMUM CLEARANCE (IN ALL DIRECTIONS) OF 100MM AROUND THE HANDWHEEL. y J
sk Sink td Tundish 5. POLLUTION CONTROL MANAGEMENT PLAN (PCMP): 4. ALL HYDRANTS TO BE FITTED WITH THE VALVE OUTLET AT RIGHT ANGLES TO THE FACE OR WALL BEHIND IT. THE VAVLE OUTLET IS TO BE /proJEcT: 31 CORSAIR CRESCENT \
Tat Trench grate transverse bar : HORIZONTAL OR SLOPING AT A MAXIMUM OF 35 DEGREES BELOW HORIZONTAL
LT Laundry Tub rei, areneh, grate longitudinal bar FO ST ATL IN PLOW PIERO DEVISRe IKE 5. EXTERNAL FEED HYDRANTS SHALL BE POSITIONED WITHIN 20M OF A ROAD, HARDSTAND OR THE LIKE TO WHICH THE FIRE AUTHORITY PUMP SUNRISE BEACH
y TMV. Thermostatic mixing valve 5.2. TO LIST ALL IN FLOW FILTERING DEVICES LIKE LEAF EATERS AT DP'S AND OTHER FILTERS. : , DUPLEX
ol wm — Washing Vv Tempering valve 5.3. TO KEEP AND MAINTAIN A LOG OF CLEANING. APPLIANCE HAS ACCESS.
Machine u/g Underground 5.4, TO CLEAN DEVICES SUCH AS GUTTERS AND GULLY PITS: 6. EXTERNAL HYDRANTS SHALL BE POSITIONED NOT LESS THAN 10M FROM THE BUILDING UNLESS PROTECTED BY A CONSTRUCITON HAVING DRAWING TITLE:
S EWG Floor Weste Gully u/s Under ‘slab erwi “AS TO MANUFACTURES SPECIFICATION A FIRE RESISTANCE LEVEL OF NOT LESS THAN 90/90/90 EXTENDING AT LEAST 2M EITHER SIDE OF THE HYDRANT OUTLET, AND WHICH EVER
We Wake copie otherwise “MINIMUM QUARTERLY, BUT MONTHLY IN RAINY SEASON IS THE LESSER, 3M FROM THE GROUND LEVEL ADJACENT TO THE HYDRANT OR THE HEIGHT OF THE BUILDING.
os Bn Basin “AFTER EACH MAJOR RAINFALL EVENT 7. FIRE AUTHORITY BOOSTER CONNECTIONS SHALL BE INSTALLED WITHIN 8M OF A ROAD, HARDSTAND OR THE LIKE TO WHICH THE FIRE J
5.5. TO INSPECT AND CLEAN TANKS MINIMUM ONCE YEARLY. AUTHORITY PUMP APPLIANCE HAS ACCESS.
C)) bth Both Shr Shower 5.6. TO INSTALL AND MAINTAIN PUMP AND FIXTURES FOR REUSE/WATERING/IRRIGATION AS TO MANUFACTURES SPECIFICATION 8. MATERIALS: — <@100 Ohe a conor MOVE Soo uns IN GROUND. COVER SHEET )
ELF Fre Hose Ree OMS Het eter sytem Foo oe UN STONE.
La «= ME_—s Water Meter CS Cleaners Sk 9. DONOT USE GALVANISED FOR UNDERGROUND PIPE WORK.
Design Ae. Checked (Ch Dote 01-03-16 Dwg. No. AMD,
SCALE: 1 : 200 ON At UNO. 1 Of 4 3105-1 J
RPD:—
LOT 219 RP 135364
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 5 pages
Page 2
-
NOOSA COUNCIL
APPROVED PLAN
OPW16/0050 23 MAY 2016
[OCR of page images]
< LAND
X
2
PROVIDE
INLET WITH GRATED LID
SL23.950
IL23.150
\
\
(@
8
PROVIDE 450sq FIELD
INLET WITH GRATED LID “©
SL23.950
IL22.950
450sq FIELD ——— |
a
Approximate Sewer Line Location
Sewer M/H
75min
A
ZL
Oo
D gy &
Ce wy
pgxyuud
O J= 2
aa =Foesz
x oS ae
NOTE:
NOOSA COUNCIL
APPROVED PLAN
OPW16/0050 23 MAY 2016
ONLY THE REMAINING CATCHMENT AREAS
WHICH ARE NOT DIRECTED TO THE KERB
& CHANNEL SHALL BE USED TO CHARGE
\“ PROVIDE 450sq FIELD
INLET WITH HEAVY DUTY,
CLASS D GRATE
9150: SL28.100
THE HARVESTING TANK #150 1L27.100
Sa Se SS po
TIMBER SLEEPER RETAINING WALL garden
BUILDER ERMINE EXTENT
| OF RETAINING WALL, ON SITE. |
| Rv RW RW RW RW RW
| 9150 C2 \ RETAINING WALL |
YO ic_timber retaih
| ~ wall |
<P lls
IL22.950 Bly Flog |
: - — TOP 6 t cP3 "109
a Ny utility rooyn |-6100
a |
| bed. 3 ay Fr28-200
EVERHARD ROOF WATER =
es 3 _
| | DOMETRENCH AS =< ||| HARVESTING TANK 3
| PER DETAIL bed, 2 ~~ slid.doors ES z
ct | \ robe 32 &
| | 4 a < Bs <
| | 1800mm HIGH CEMENT R.L.25.355 "|
DOmm HIGH CEM TOP OF SLAB
i RENDERED BLOCK FENCE 4 ee ay gFi28.000
Ht [- ‘
| eS ow a Q>
Ee )s = ~x
| | terrace bed. 2 85 Ro 0F WATER 7
| | RL25.25 s . oe HARVESTING TANK
Top OF STAB a terrace ® eri28.2
| RL.95,305 bed. 3
TOP OF SLAB oe / 5
ce X.L.25.30f
ee OF i Yo
utility roqm
-— 100
a — | )\ il GP4
|o \pump/ y
> —_
pool : < timber retath
fw garden wall
__L
oe Beth opt RW R R RW RW
0150 3 96.425
5 Approximate. hou
Connection Plott
From Records
2000min
Hot Dip Galvanised Kerb
adaptor to match kerb
Title
NOTE:
ONLY THE REMAINING CATCHMENT AREAS
WHICH ARE NOT DIRECTED TO THE KERB
& CHANNEL SHALL BE USED TO CHARGE
THE HARVESTING TANK
)
-
450
75min 75min
profile
\ 125 x 75 x 6mm Galvanised
MS section
Connection fitting
refer Detail ’A’
4
#100
- Hot dip MS connection
A fitting or approved equivalent.
pipes to sealed with silicone or
DETAIL A
mortar into fittings.
Notes:
1. UPVC pipe to be 100mm heavy duty DWV
class SN6
2. All steel works to be hot dip galvanised
3. All joints on PVC pipe to be sealed with
solvent weld cement (type N or P), or
rubber ring joint.
Fitting for connection of #100
uPVC pipe to 125 x 75 x 6mm
i~=———MS section
TYPICAL CROSS SECTION OF STORMWATER TO KERB
NOT TO SCALE
PROVIDE 450sq FIELD
INLET WITH HEAVY DUTY,
CLASS D GRATE
SL28.100
1L27.100
PRE & POST DEVELOPMENT RUNOFF CALCULATIONS:
RUNOFF & DETENTION CALCULATIONS:
MAXIMUM _ EVENT: Q100
TIME OF CONCENTRATION: Smin
INTENSITY: 326mm/hr
SITE AREA: 608sqm
IMPERVIOUS AREA: 351sqm
PRE DEVELOPMENT PEAK RUNOFF: 48L/s
PEAK RUNOFF POST DEVELOPMENT:
ROOF CATCHMENT AREA DIVERTED TO CORSAIR CRESCENT KERB & CHANNEL
14L/sec
AT MAXIMUM Q20 DESIGN FLOW: MINUS 2*7L/sec =
ACHIEVED POST DEVELOPMENT RUNOFF: 52-14 =
52L/s (NO RETENTION)
38L/sec < 48L/sec
LEVEL OF SEALED PIPE
TO BE MINIMUM 1.5m
ABOVE STREET LEVEL
CONNECT TO KERB & CHANNEL
REFER TO DETAIL. LEVEL OF KERB
R
OOF TO KERB DIAGRAMATIC
SCALE: NTS
100sqm ROOF CATCHMENT AREA
TO BE DIRECTED TO CORSAIR
CRESCENT KERB & CHANNEL
Q20 = 7L/sec
LEVEL OF WATER
IN PIPE SYSTEM
TRICKLE DRAIN
WITH VALVE
scent
Cre
AREA TO
AREA
EMAINING CATCHMENT
Lrewn CATCHMENT
TANK
TO TANK
Corsair Cresent
Corsair
Level surface
\, OOsqm ROOF CATCHMENT AREA
TO BE DIRECTED TO CORSAIR
CRESCENT KERB & CHANNEL
Q20 = 7L/sec
ROOF CATCHMENT AREAS TO KERB&CHANNEL
O’land flow path
600
100
| | 300 ||
100 100
DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED
FOR ASSESSMENT, TENDERING AND CONSTRUCTION.
PO Box 181
Amd Description Date
A___DRAINAGE CONCEPT CHANGED, RESPONSE TO RFI 11-04-16
Issue Notes Date
For Development Approval
For Building Approval x 01-03-16
For Tender
For Construction
As Constructed
E Hydraulic 3:
1
I
~ >)
contact: Reinhold Koenning MiEAust RPEQ No 7023
Domed trench
SUPPLIED BY EVERHARD INDUSTRIES
50mm crushed
aggregate or
gravel
Geotextile
filter cloth
DOMED TRENCH DETAILS
Moffat Beach, QLD, 4551
email: [email protected]
PH: (07) 5491 4333
CLIENT :
CONNECTIVITY P/L
DESIGNER:
LL DES CRAWFORD J
(Prosect: 31 CORSAIR CRESCENT Y
SUNRISE BEACH
DUPLEX
DRAWING TITLE:
STORMWATER J
DRAINAGE AND )
MANAGEMENT PLAN
Design AH. Checked (Ch Date 01-03-16 Dwg. No. AMD.
\ Scale: 1: 100 ON A1 UNO. 2 Of 4 3105-2 A)
RPD:— LOT 219 RP 135364
Page 3
- NOOSA COUNCIL APPROVED PLAN OPW16/0050 23 MAY 2016 [OCR of page images] NOOSA COUNCIL APPROVED PLAN OPW16/0050 23 MAY 2016 TEMPORARY SEDIMENT CONTROL FENCE REFER DETAIL F42 Fabric to AS1304 Desturbed area | i, Geotextile fabric oO, 8, OK. 7 “pn M%, Posts or steel pickets driven 600mm into ground CX tes ROKK KK eg < ose oe soconece 100min vertical overlap of fabric 600max Undisturbed area Backfill Fix to top of stake with shadecloth fastener or tie to steel picket 200 Geotextile Fabric ry and F42 | | 50x50 HW stake or steel | picket 1200min long Overflow | a Backfill PERIMETER SEDIMENT FENCE DETAIL Geotextile fabric, Bidum U34 or similar. trap Runoff from pad directed to sediment 4 om in i _ “LI Lt Ld _ | Ld | | I | ! ! | ! # | | 0” | i | \ ® ! : : hn ! a o i ' 1 = © | 2 0 | © | j | [}-_——_-_____;} a : iC Oo Lo “ : : c © N N 80 N N ~N N N Berm (300mm min height) TEMPORARY CONSTRUCTION ENTRY/EXIT SEDIMENT TRAP TEMPORARY CONSTRUCTION ENTRY/EXIT SEDIMENT TRAP. REFER DETAIL. DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED FOR ASSESSMENT, TENDERING AND CONSTRUCTION. ‘Amd Description Date Issue Notes Date For Development Approval For Building Approval x 01-03-16 For Tender For Construction As Constructed E Hydraulic 3: contact: Reinhold Koenning MiEAust RPEQ No 7023 PO Box 181 Moffat Beach, QLD, 4551 \- email: [email protected] PH: (07) 5491 4333 CLIENT : CONNECTIVITY P/L DESIGNER: iS DES CRAWFORD (PRouect: 31 CORSAIR CRESCENT SUNRISE BEACH DUPLEX DRAWING TITLE: A STORMWATER DRAINAGE AND ) MANAGEMENT PLAN Design He. Checked (Ch. Date 01-03-16 Dwg. No. AMD. SCALE: 1 : 100 ON At UNO, 3 Of 4 3105-3 J RPD:— LOT 219 RP 135364
Page 4
- NOOSA COUNCIL APPROVED PLAN OPW16/0050 23 MAY 2016 [OCR of page images] an SEDIMENT & EROSION CONTROL NOTES Erosion and sediment control devices shall be installed and maintained in 9. The underground drainage system shall be used to convey runoff throughout accordance with these drawings unless an alternative proposal is approved in construction. All drainage pits shall be constructed prior to placement of writing by the superintendent. Additional erosion and sediment controls shall sub-base material and shall contain a suitable cut-out to capture run-off from also be installed as necessary during construction. base of boxing during construction. All erosion and sedimentation control devices shall be installed prior to 10. The underground drainage system including all pits, pipes and GPT shall be stripping topsoil or commencing earthworks anywhere else on site unless cleaned of sediment prior to on maintenance. Unless otherwise approved by otherwise approved by the superintendent. An inspection hold point is the Superintendent all temporary erosion and sediment control measures required at this point prior to the works proceeding. shall be removed at the completion of construction. Where erosion and sediment control devices cannot be installed due to 11. However such removal shall not proceed until the site is stabilised to the earthworks or other work operations, they shall be installed at the earliest Superintendent's satisfaction. possible date. 12. All construction vehicles shall be cleaned of mud and/or loose dirt prior to Permanent coverage of disturbed areas with topsoil and turf, hydromulch or leaving the site. mulch (and jute matting if required) is to be undertaken at the earliest 13. No release, or flow is permitted from the site, throughout the earthworks and practical time. Turf shall be laid behind kerb and channel for full verge width. construction period, to any waterway, or stormwater drain or drainage line leading to a waterway or area of native vegetation, unless the level of total In order to prevent erosion from concentrated flow paths, the contractor shall suspended solids does not exceed a concentration of 50 milligrams per litre. follow the following site protection principles: - Install turf in permanent open drain; 14 An effective water quality self-monitoring program, including at least one representative measurement of the total suspended solids quality of any flow - Install geofabric in temporary open drains where shown on drawing; or release from the site on each day runoff to water occurs, must be - Install sand bags, rock check dams or mulch bunds at 20m centres in all implemented continuously throughout the life of the works which are the concentrated flow paths including cut-off drains along kerb and channel, subject of this approval. Where the findings of the required performance along sediment fences, mulch or earth bunds except where drains are lined self-monitoring program indicate that the 50mg/L TSS compliance limit is being with turf or geofabric. or is likely to be exceeded, remedial action must be taken without delay to All disturbed areas shall be covered with 100mm of topsoil prior to turfing, ensure ongoing compliance. seeding, hydromulching or mulching. All batters 1 on 4 and steeper shall be tined to a depth of 200mm in 15. Sufficient stockpiles of mulch and/or other similar required erosion and sediment control materials and stores must be maintained on site at all times accordance with Main Roads specifications prior to topsoiling and mulching to enable ongoing erosion control, as well as site contingencies e.g. imminent (75mm thick). Batters steeper than 1 on 2 shall also have heavy duty jute wet weather, to be dealt with, until commencement of on maintenance. matting installed over the mulch. all other disturbed areas shall be covered with hydromulch. LEGEND agi e FWG a GP1 oa Existing storm water Storm Water Drainage Agi Drain Floor Waste gully Gully Pit Sediment Fence -—_—-o Boundary @ Diameter C.0.8. Cleanout to surface Een Eccentric Enlarger FFL Finished floor level GP. Gully pit GMH Gully Man Hole IC Inspection Chamber IL Invert Level K&C Kerb & Channel MH Manhole PO Planter outlet RPB Real Property Boundary RPD Real Property description RWO Rain water outlet RWH Rain water head SL Surface Level Sq Square SWD Storm water drain Tat Trench grate transverse bar TG(I) Trench grate longitudinal bar u/g Underground u/s Under slab u.n.o. Unless noted otherwise Task ISSUES EROSION & SEDIMENT CONTROL STORMWATER QUALITY PERFORMANCE MINIMIZE SOIL EROSION SITE DURING AVOID DETRIMENTAL IMPACT ON THE WATER QUALITY AND AQUATIC ENVIRONMENT OF DOWNSTREAM WATER CONSTRUCTION AND REHABILITATION STAGES BODIES AS A RESULT OF DISCHARGE OF CONTAMINATED STORMWATER RUNOFF FROM CONSTRUCTION WORKS AND AT ALL TIMES PREVENT THE TRANSPORT AND COMPLY WITH THE ENVIRONMENTAL ACT ON ENVIRONMENTAL PROTECTION POLICY FOR WATER. OF SEDIMENT FROM THE SITE. MANAGEMENT e INSTALL THE CONTROL DEVICES AND ¢ COMPLY WITH THE ENVIRONMENTAL PROTECTION ACT AND ENVIRONMENTAL PROTECTION POLICY (WATER) STRATEGY FOLLOW THE STABILIZATION PROCEDURES e ALL CONTROL MEASURES SHALL BE IN PLACE PRIOR TO COMMENCING SITE STRIPPING. DESCRIBED ON PLANS. e CONSTRUCTION MATERIALS AND STOCKPILES STORED ON SITE SHALL BE PLACE IN PREPARED LOCATIONS, e LIMIT THE EXTENT OF STRIPPING TO THE AND PROTECTED AS SHOWN. STAGE AREA PRESENTLY UNDER e FUELS AND OILS SHALL BE SAFELY STORED TO AVOID INUNDATION. ANY SPILLAGES WITHIN THESE CONSTRUCTION. COMPOUNDS SHALL BE IMMEDIATELY ATTENDED TO SO AS TO LIMIT THE POTENTIAL FOR IMPACT e ALL MUD AND SILT DEPOSITED ON THE OFF-SITE. ADJACENT ROADWAY SHALL BE REMOVED e PROVIDE CONTROL MEASURES TO PREVENT SOIL EROSION , SCOURING, SEDIMENT TRANSPORT AND BY SWEEPING. DEPOSITION. THESE MEASURE ARE IDENTIFIED IN THE SOIL & EROSION CONTROL PLAN BUT MAY BE e¢ PROTECT STORMWATER DRAINAGE INLETS EXTENDED AS REQUIRED AND MAY INCLUDE: AS SHOWN BELOW UNTIL THE SITE HAS — TEMPORARY RETARDATION BASIN BEEN STABALIZED. — TEMPORARY SILT FENCE e¢ WASH FROM EXPOSED AGGREGATE — DIVERSION OF UPSTREAM CATCHMENT AROUND DISTURBED AREAS CONCRETING SHALL BE WHOLLY e IN AREAS WHERE RUNOFF TURBIDITY IS TO BE CONTROLLED, EXPOSED SURFACES SHALL BE MULCHED CONTAINED ON SITE. CEMENT RESIDUE OR STABILIZED WITH TURF IF EARTHWORKS ARE EXPECTED TO EXTEND FOR THAT TWO WEEKS. SHALL BE ALLOWED TO DRY THEN e PERMANENT CONTROL MEASURES WILL BE IN PLACE UPON COMPLETION OF CONSTRUCTION, HOWEVER REMOVED FROM SITE. MAINTENANCE WILL BE REQUIRED OF SOME TEMPORARY FACILITIES UNTIL FULL SITE REHABILITATION HAS BEEN ACHIEVED. MONITORING THE PRINCIPAL CONTRACTOR SHALL AT ALL THE PRINCIPAL CONTRACTOR SHALL ENSURE NO SUSPENDED SOLIDS OR CONTAMINANTS ARE VISIBLE IN TIMES ENSURE THAT CONTROL DEVICES ARE SURFACE RUNOFF LEAVING THE SITE. CORRECTLY INSTALLED AND ADEQUATELY MAINTAINED, IN PARTICULAR PRIOR TO FORECAST PERIODS OF RAIN OR STORMS. CORRECTIVE e¢ EMPTY AND REPAIR TRAPS REGULARLY. ACTIONS e REPAIR OR REPLACE DAMAGED CONTROL e REPAIR OR EXTEND CONTROL DEVICES TO OPERATE ADEQUATELY. DEVICES. e INSTALL ADDITIONAL SEDIMENTS TRAPS TO RETARD SURFACE RUNOFF ACROSS THE WORKS AREA. e PLACE ADDITIONAL CONTROL DEVICES WHERE EXISTING INSTALLATIONS ARE INADEQUATE. REPORTING WEEKLY REPORTS BY THE PRINCIPAL CONTRACTOR TO THE CONSULTANT DETAILING WEEKLY REPORTS BY THE CONTRACTOR TO THE CONSULTANT OUTLINING THE EFFECTIVENESS OF CONTROL MAINTENANCE PROGRAM, ADDITIONAL WORKS MEASURES AND DETAILS OF ANY CORRECTIVE ACTIONS TAKEN AND THE PERFORMANCE OF CONTROL MEASURES. SEDIMENT & EROSION MANAGMENT PLAN Prior to the commencment of any construction activities the following measures shall be incorporated: SEDIMENT AND EROSION CONTROL MANAGEMENT PLAN: e Provide education of site personnel e Set up action plans as a precaution in case of disturbances occuring © OBJECTIVE: especially after an unexpected strong rainfall event To minimise erosion on site and ensure sediment is not washed down to the receiving waterways due to construction e Provide regular inspection and maintenance of all structures including the DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED activities FOR ASSESSMENT, TENDERING AND CONSTRUCTION. temporary structures. ¢ LEGISLATION: Amd Description Date Environment Protection Act 1994 Environmental Protection Water Policy 1997 The Integrated Planning Act 1997 e RESPONSIBILITY: The responsibility for all measures regarding the sediment and erosion control during construction shall be with the CONTRACTOR. The contractor shall appoint one staff member, ideally the foreman to be responsible for: *the location of drain paths such as swales and trenched, cut off swales, catch drains and perimeter banks. All of BOOS TS SONS SbUGtOn THE CONTRACTOR SHALL PROVIDE A these measures shall ensure the runoff is directed to the sedimentation basin during construction. PLAN FOR STOCKPILING, MATERIALS STORAGE AND WASTE **the waste and wash down of materials and goods in particular concrete and cement shall be separated, set to dry MANAGEMENT. THIS PLAN MAY BE A HAND DRAWN SKETCH BUT wed disposed of , . SHALL BE VISIBLEY PLACED IN THE SITE OFFICE. installation and maintenance of the sediment control fences all around the perimeter as shown in plan ADVICE: **“control of fences, sandbags and bales as well as the sedimentation basin after each rainfall event ._ LOCATE STOCK PILES ON LEVEL GROUND AWAY ***control of the entry/exit path and the minimization of sediment transfer to the street in particular control of concrete FROM AREAS SUBJECT TO CONCENTRATED Issue Notes Date and earthmoving vehicles OVERLAND FLOW. For Development Approval “supervise other members of staff and lead by example | —- . CONSTRUCT A PERMENENT BANK OR CATCH DRAIN For Building Approval x 01-03-16 *“ensure enough litter collection devices are provided for the collection of daily litter such as cans, bottles, paper, ABOVE STOCK PILE TO PROTECT IT FROM UPHILL butts and also building material cut offs. RUNOFF. For Tender ***ensure all stockpiles for both incoming and outgoing goods in particular soils and sands are clearly marked and not . CONSTRUCT A SEDIMENT FENCE BELOW THE For Construction blocking drain paths and kept neat and clean. STOCKPILE TO TRAP SEDIMENTS BEING WASHED ***control the flow path of stormwater at all times during construction and use swales, sandbags, bales and other OFF THE PILE As Constructed measures to ensure the runoff is directed to the sedimentation basin at all times. . PROVIDE ACCESS TO STOCKPILE FROM SIDE SO AS TO AVOID RUNOFF PASSING THROUGH. e ACTIONS: In case of major rainfall events the following action plan shall be followed and responsibly looked after by the CONTRACTOR: . CUT—OFF DRAIN ALONG CONTOUR — LONG TERM PLASTIC SHEET WHEN RAIN OR H draulic woh ***DON'T WAIT UNITL IT IS TOO LATE! STOCKPILES ONLY (GRADE AT 1 IN 100 max. TO FREE HIGH WINDS ARE EXPECTED. y V be on site during the rainfall period and monitor the drain paths. Redirect where required. OUTLET.) STABILIZE ALL EARTHWORKS AREAS WITH TURF. “check the fences after every rainfall and replace the fences where required. Check and replace all barriers, V— bales, sandbags and temporary swales, cut off drains and trenches where required. CONTACT: Rein ho | d Koe nn i ng MiEAust RPEQ No 7023 ***clean out sedimentation material as soon as the moisture content allows it. FLOW PO Box 181 “check the receiving pit and improve the barriers if required. KG SS Moffat B h wee . RRRRRRRRR A < . joffa each, QLD, 4551 REMEMBER: EACH RAINFALL IS THE EVENT TO ACTIVELY WATCH AND CONTROL THE RUNOFF! RRR, Via RRR Re 7 email: [email protected] SS SII SRI av WAIT SATA IS PH: (07) 5491 4333 Y CLIENT : SEDIMENT FENCE AS SPECIFIED ALONG CONTUR (EXTEND 3m min. EACH SIDE OF STOCKPILE. CONNECTIVITY P/L DESIGNER: STOCKPILES \ DES CRAWFORD J 1. PLACE STOCKPILES 5m min. UPSTREAM OF EXISTING VEGETATION, (PROJECT: 31 CORSAIR CRESCENT Y CONCENTRATED WATER FLOW, ROADS, AND HAZARD AREAS. SUNRISE BEACH 2. CONSTRUCT ALONG THE CONTOUR AS LOW, FLAT, ELONGATED DUPLEX MOUNDS (2m max. HEIGHT.) DRAWING TITLE: | L STORMWATER / NOOSA COUNC DRAINAGE AND ) APPROVED PLAN eee OPW16/0050 23 MAY 2016 Pen RH thes, Gh pte 01-03-18 Boo Non SCALE: 1 : 100 on At uno. 4 Of 4 3105-4 J RPD:— LOT 219 RP 135364
Page 5
-
NOOSA COUNCIL
APPROVED PLAN
OPW16/0050 23 MAY 2016
[OCR of page images]
FORM KEY IN EDGE OF Ist POURED SLAB COAST
FACE OF SLAB WITH BOND PREVENTATIVE.
BOLSTER CUT SLAB (3Wx30D), FILL (eg, HYDROSEAL, FORMOIL).
JOINT TO 30mm BELOW SURFACE WITH
FOSROC EXPANDITE THIOFLEX G00G.
| LAYER F72 FABRIC.
30 TOP COVER. 25
i
L $.0.G | b | : “Tl \
S SEX z SSS SS] 4 a z SSS j r
S LS TION SID. * YD
SUBGRADE TO BE COMPACTED TO 98% CUT EVERY 2nd WIRE DIRECTLY UNDER
STANDARD COMPACTION (TEST El.! ASI284). JOINT € DEPRESS FABRIC LOCALLY.
EDGE THICKENING (ET) TOOLED JOINT (TJ)
TYPICAL TO ALL EDGES OF DRIVEWAY SLAB. ALTERNATIVELY: SAW CUT SLAB 3Wx30D WITHIN
DISCONTINUE FABRIC 40mm FROM END. 24 HOURS OF CASTING SEAL AS ABOVE.
DRIVEWAY SLAB ON GROUND DETAILS
3 BAR FIITM.
50 BOTTOM COVER,
KEYED JOINT (KJ)
300
DRIVEWAY NOTES:
- TOOLED JOINTS (TJ) @2m CRS MAX.
|, EXISTING FOOTPATHS TO BE SAW CUT PRIOR TO REMOVAL.
2, CROSSINGS ARE NOT DESIGNED FOR COMMERCIAL VEHICLES.
3. CONCRETE DRIVEWAY TO BE 125mm THICK EXCLUDING ANY FINISH TREATMENTS. eg.
STAMPED CONCRETE FINISH.
CONCRETE SURFACE TOLERANCE TO BE 0-5mm, OVER 3 METRE SECTIONS.
CONCRETE N25 IN ACCORDANCE WITH ASI374 AND AS3600.
REINFORCEMENT FABRIC TO ASI304, 50 TOP AND EDGE COVER, LAP FABRIC 250.
APPROVED MATERIALS FOR CONSTRUCTION:- CONCRETE or ASPHALT.
EXPANSION JOINTS TO BE lOmm WIDE, FULL DEPTH CLOSED CELL CROSS LINKED
POLYETHYLENE FOAM (85-150kg/m3) OR COMPRESSED GRANULATED CORKBOARD,
INSTALLATION TO MANUFACTURERS INSTRUCTIONS.
9, ALL DIMENSIONS IN MILLIMETERS.
ONE ACCESS POINT TO BE CONSTRUCTED TO EACH LOT AS PER STANDARD DRAWING.
ll, FOR CURVED DRIVEWAYS, MAXIMUM GRADES APPLY TO INSIDE EDGE OF CURVE.
ALL SERVICES NEED TO BE LOCATED PRIOR TO EXCAVATION.
lOmm CORKJOINT OR
SIMILAR.
DIY
SOND SOY
BOLSTER CUT SLAB (3Wx30D).
- KEYED JOINTS (KJ) @6m CRS MAX,
- EXPANSION JOISTS (EJ) @lém CRS MAX,
| LAYER F72 MESH
30 TOP COVER.
CUT EVERY 2nd WIRE DIRECTLY UNDER
JOINT € DEPRESS FABRIC LOCALLY.
EXPANSION JOINT (EJ) TOOLED JOINT (TJ)
w Qo
=a va Ss
wy EF
ALTERNATIVELY: SAW CUT SLAB 3Wx30D WITHIN
140 BLOCKWALL 24 HOURS OF CASTING.
\ 7] lo
BARRIER/SEMI-MOUNTABLE
KERB AND CHANNEL. 7}
CAPACITY |00kPa. )
FOOTPATH
NI2 VER BARS @400 CRS. LAP
PROPERTY BOUNDARY
500 WITH NI2 FROM FOOTING.———} > ott :
NI2 HOR BARS @400 CRS, LAP x ans 8
450 WHERE REQ'D AND AT = S a
CORNERS. lo S 2
S DRIVEWAY DETAILS AND g|-
“ a NONSLIP zx NOTES TAKEN FROM COUNCIL Eig
PSH roy RESIDENTIAL DRIVEWAY Sl
CONSTRUCTION 88 DRAWING 8-050. asl
Su ~)
lo JOINT. [7] we
1000
3 BAR F8TM TOP &
BOTTOM, RIO LIGS
@600 CRS. L
SKK NS
Hes
MOUNTABLE KERB
KK
> AND CHANNEL. ~~
BARRIER,
SEMI-MOUNTABLE,
MOUNTABLE KERB ¢
CHANNEL OR INVERT
CROSSING.
FOOTPATH
CHANNEL.
ALTERNATIVE PROFILE.
DRIVEWAY
CROSSING PLAN
NOT TO BE USED FOR
RETAINING, USE RW3.
2
S
ra)
Q 9 oO
350
PATH SLAB DETAILS
(TO BE FOUNDED ON MATERIAL OF MIN SAFE BEARING
F72 MIN FABR|
at, ET ¢z|
TR
FRX.
SAW CUT AND BREAKOUT
BACK OF KERB AND
DRIVEWAY
CROSSING DETAIL
SFI DETAILS
PETER RIENECKER - RPEQ 2088
R:\rienmacfiles\Rienmac\15\Large\15330 - Lt 219 Corsair Cr, Sunrise Bch - Steve-Dianne Selby - Des Crawford\15330.dwg, Model,
10/03/2016 12:29:14 PM, L Roth, Rienmac Pty Ltd, CutePDF Writer, A3, 1:100
NOOSA COUNCIL
APPROVED PLAN
OPW16/0050 23 MAY 2016
100 SLAB ON GROUND TO PATH. | LAYER F72 MESH 30 TOP
COVER, 50 SIDE AND END COVER. PROVIDE:
APPROVED PREFORMED
METAL KEY JOINT,
EYED JOINT (KJ)
RIENMAC ery ito
ABN. 52 010 666 430 AC.N. 010 666 430
CONSULTING CIVIL &
STRUCTURAL ENGINEERS
SUNSHINE COAST OFFICE:
SUITE 5, FIRST FLOOR, P:- (07) 5478 250d
SAINT CIRINO, F:- (07) 5444 {158
137 BRISBANE ROAD, Email:-info@rienmac. biz
(PO BOX 149) info@rienmac,ne'
MOOLOOLABA QLD 4557 Web:- www ,rienmac.bi
CLIENT:
CONNETIVITY PTY LTD
|c PROJECT:
PROPOSED UNITS
LOT 219 CORSAIR CRESENT
SUNRISE BEACH @LD 4567
REAL PROPERTY DESCRIPTION # COUNCIL:
LOT 219, RP 135364
PARISH OF WEYBA, COUNTY OF MARCH
SAND BED. SUNSHINE COAST REGIONAL COUNCIL
DRAWING TITLE:
DETAILS
Designed: PLR Drawn: LR
SCALES: 1:20
Engineer: PLR |DATE: 25 MAY [5
permnision fram Rlenmae Coaultng Engreers “| JOB NUMBER DWG No. | ISSUE
| DO NOT SCALE OFF DRAWINGS, | A3 |SHEET lo OF 2| |CHECKED: PLR
Page 6
new concrete pathway constructed
'Noosa Shire Council' standards
in accordande with all relevant
vehicle turning bay only
no parking permitted
Unit 2
Level 3
Unit 2
Level 1
-
NOOSA COUNCIL
Garage
APPROVED PLAN Unit 2
OPW16/0050 23 MAY 2016
Level 2
Exposed Aggerate
Garage Concrete Driveway
Unit 1
Unit 1 Level 2
Level 1
new concrete pathway constructed
'Noosa Shire Council' standards
in accordande with all relevant
Unit 1
Level 3
pool
vehicle turning bay only
no parking permitted
Note Planting Legend
Only ground covers shall be planted near the code botanical name common name no. pot size height spread
domedtrench & any required field gullys. preparation of garden beds trees
These plants shall be at least 900mm from the
outside face of the domedtrench. planting
The ground covers are nominated as H & I on the
planting legend. shrubs
For position of these services, refer to the
Construction Hydraulic drawings by Reinhold mulching
maintenance
Koenning (Dwg. No. 3105)
installation of irrigation ground covers
P 5448 2049
Residential M 0488 238 001
Building Design E [email protected]
Des Crawford Landscape Plan
Used in these records
OPW16/0050 - Approved Plans.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.