Updated Site Plan_compressed
Plans and drawings: the text below has words only, no drawings.
LEGEND:
BAX
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
--- PROPOSED SITE LAYOUT PLAN
DATUM: AHD
A 28.11.22 ISSUED FOR INFORMATION QT GWA
PROJECT NO:
304-001
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
28.11.22
GWA
QT
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering PTY. LTD.
2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573
PROJECT:
332 EASTERN BRANCH RD, QLD 4314
No. DATE REVISIONS BY CKD --- DESIGNED QT FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. [email protected] PLAN No 304-001-100 REVISION A A1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.
Full text of the other 1 page
Page 2
LEGEND:
BAX
SCALE: SURVEYED: CLIENT: NORTH POINT TITLE:
--- SWEPT PATH LAYOUT PLAN
DATUM: AHD
A 28.11.22 ISSUED FOR INFORMATION QT GWA
PROJECT NO:
304-001
LOCAL AUTHORITY APPROVAL NO:
DATE
CHECKED
DRAWN
28.11.22
GWA
QT
APPROVED:
GLENN AINSWORTH
CPESC No: 7678
RPEQ No: 19204
Engineering PTY. LTD.
2261 DAVID LOW WAY, PEREGIAN BEACH, QLD 4573
PROJECT:
332 EASTERN BRANCH RD, QLD 4314
No. DATE REVISIONS BY CKD --- DESIGNED QT FOR AND ON BEHALF OF BAX ENGINEERING PTY. LTD. [email protected] PLAN No 304-001-800 REVISION A A1