Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

Referenced Documents MCU13/0098

of 4

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

ADJACENT INDUSTRIAL ESTATE

 

 

rFOR DETAILS OF ROOF DRAINAGE REFER TO HYDRAULIC CONSULTANTS DRAWINGS

 

 

 

 

 

COMBINED ———_.

HARVESTING/RETENTION \
TANK, TYPE ABOVE
GROUND.

TOTAL VOLUME
22,500LITRE

DISCHARGE MINIMUM OF
80% ROOF CATCHMENT
AREA TO TANK.

NS
\,

BIO RETENTION

 

 

SYSTEM FOR
ROOF CATCHMENT
MIN AREA 45sqm ~~

 

#300 SHOWN BESIDE——_]
BRS FOR CLARITY
ONLY

 

BRS 3/1

 

300~\

IL3.510~

 

 

 

 

 

 

NI

 

PROPOSED NEW WAREHOUSE BUILDING

LO

 

 

 

 

 

-& FFL5.400 |

 

 

 

N\ DRIVEWAY

CARPARKING

 

 

|

|

|
|
|
|
|
|

\

 

LOT 3 PROPERTY CONNECTION
$375; 5.9m @ 1%

USIL3.470

DSIL3.410

 

 

 

CARPARI

 

 

225
1L3.510

——EXISTING
STORMWATER

MANHOLE 1/1:

SL4.870
IL3.555

    

 

-) FFLS.400

| FFLS.400

 

 

        
 

 

 

 

[email protected]

 

FFLS.200

  

3x MOTORBIKE

 

 

 

IL3.750-

 

 

 

 

 

 

 

 

 

BIO RETENTION BIO RETENTION

 

L3.600 SYSTEM FOR SOUTH SYSTEM FOR
CARPARK NORTH CARPARK
CATCHMENT. CATCHMENT.

MIN AREA 11sqm MIN AREA 15sqm

INTERNAL ACCESS ROAD (ROW)

 

 

 

 

 

 

/
/ SITE ACCESS

/

 

SITE ACCESS

S To FR FF FT

FLOW (LITRES/SEC.)

60

 

 

 

——— NO RETENTION

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

50:
S WITH RETENTION
40 S
30. Zz
7 ™~

20 ==
° Ce = ~

0 ! T I

2 4 6 8 10 12 14 16 18

TIME (MINS.)

STORMWATER HYDROGRAPH THROUGH TANK
PEAK FLOW MITIGATION THROUGH ON SITE RETENTION TANK
TOTAL PROPOSED TANK VOLUMES:

TANK FOR HARVESTING: 10,500 LITRE

 

 

 

 

 

 

 

 

TANK FOR RETENTION: 12,000 LITRE
RUNOFF & DETENTION CALCULATIONS:
MAXIMUM EVENT: Q100
TIME OF CONCENTRATION: Smin
INTENSITY: 326mm/hr
SITE AREA: 3266sqm
IMPERVIOUS AREA: 2744sqm
PRE DEVELOPMENT PEAK RUNOFF: 260L/s
PEAK RUNOFF POST DEVELOPMENT: 290L/s (NO RETENTION)
RETENTION VOLUME REQUIRED: 11,900 LITRE
RETENTION VOLUME PROVIDED: 12,000 LITRE
REDUCTION REQUIRED: 29.8L/s
REDUCTION PROVIDED: 33.9L/s
FROM ROOF
HI-FLOW #300
E
Lt
9
COMBINED 4
HARVESTING/MITIGATION wo
TANK a
TOTAL VOLUME:
22,500 LITRE
50% HARVESTING
Or eae ON KE 90 LO-FLOW SLOW
GS LEAK TO BIO
uw RETENTION SYSTEM
0
oO
I 1 GROUND
KAN AN AN ANA NAN AN ANAS ANIA A WAN
oO

RAINWATER HARVESTING AND
MITIGATION TANK ASSEMBLEY

TO LAWFUL POINT OF DISCHARGE

SCALE: NTS

DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED
FOR ASSESSMENT, TENDERING AND CONSTRUCTION.

 

 

 

[Amd Description Date
Issue Notes Date

For Development Approval X 11-07-13

For Building Approval

For Tender

For Construction

As Constructed

 

E Hydraulic 3

 

contact: Reinhold Koenning MiEAust RPEQ No 7023
PO Box 181
Moffat Beach, QLD, 4551
email: [email protected]

PH: (07) 5491 4333 FX: (07) 5491 4233

 

CLIENT :
MARKRIS FOODS
ARCHITECT :
L SOUL SPACE J
(PRosect: 42 HOFFMAN DRIVE NY
NOOSAVILLE

INDUSTRIAL DEVELOPMENT

DRAWING TITLE:

STORMWATER
DRAINAGE
AND QUANTITY

 

Design Ae. Checked (Ch Date 11-07-13 Dwg, No. AMD,
\ SCALE : 1: 200 2783-2 SJ

RPD:-— LOT 3 / FMR LOT 2 SP 222982

ON A1 UNO. 2 Of 4

 

 

 

 

Used in these records

About this file

File size
1.6 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Referenced Documents MCU13_0098.pdf · 1.6 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.